Краткое содержание страницы № 1
®
Intel NetStructure™
MPRTM4808 Rear Transition
Board
Installation Guide
December 2004
Order Number: 301370-002
Краткое содержание страницы № 2
INFORMATION IN THIS DOCUMENT IS PROVIDED IN CONNECTION WITH INTELR PRODUCTS. EXCEPT AS PROVIDED IN INTEL’S TERMS AND CONDITIONS OF SALE FOR SUCH PRODUCTS, INTEL ASSUMES NO LIABILITY WHATSOEVER, AND INTEL DISCLAIMS ANY EXPRESS OR IMPLIED WARRANTY RELATING TO SALE AND/OR USE OF INTEL PRODUCTS, INCLUDING LIABILITY OR WARRANTIES RELATING TO FITNESS FOR A PARTICULAR PURPOSE, MERCHANTABILITY, OR INFRINGEMENT OF ANY PATENT, COPYRIGHT, OR OTHER INTELLECTUAL PROPERTY RIGHT. Intel Corporation may have
Краткое содержание страницы № 3
Contents Contents 1 Using This Guide .............................................................................................................................6 1.1 Terms and Definitions...........................................................................................................6 1.2 Other Sources of Information................................................................................................6 2 Operating Safety......................................................
Краткое содержание страницы № 4
Contents 5 Warranty Information.....................................................................................................................30 ® 5.1 Intel NetStructure™ Compute Boards & Platform Products Limited Warranty.................30 5.1.1 Returning a Defective Product (RMA) ...................................................................30 6 Customer Support .........................................................................................................................
Краткое содержание страницы № 5
Contents Revision History Date Revision Description May 2004 001 Initial release of this manual December 2004 002 Modified Serial Connectors information ® Intel NetStructure™ MPRTM4808 Rear Transition Board Installation Guide 5
Краткое содержание страницы № 6
Using This Guide Using This Guide 1 ® The Intel NetStructure™ MPRTM4808 Rear Transition Board Installation Guide is intended for users qualified in electronics or electrical engineering. Users should have a working understanding of PCI, CompactCPCI, and telecommunications. 1.1 Terms and Definitions Table 1. Terms and Definitions Abbreviation Description EMI Electromagnetic Interference GPO General Purpose ICMB Intelligent Chassis Management Bus IPMB Intelligent Peripheral Management Bus SCSI S
Краткое содержание страницы № 7
Operating Safety Operating Safety 2 This section provides safety precautions to follow when installing, operating, and maintaining the ® Intel NetStructure™ MPRTM4808 Rear Transition Board. Intel intends to provide all necessary information to install and handle the Intel MPRTM4808 board in this Installation Guide. However, as the product is complex and its usage manifold, Intel does not guarantee that the given information is complete. For additional information, contact your Intel represen
Краткое содержание страницы № 8
Operating Safety 2.3 Installation Electrostatic discharge and incorrect board installation and removal can damage circuits or shorten their life. Therefore: • Make sure that you are working in an ESD-safe environment before touching boards or electronic components. • When plugging in or removing the board, do not press or pull on the front panel; use the handles. • Before installing or removing an additional device or module, read the device’s documentation. • Make sure that the board is con
Краткое содержание страницы № 9
Operating Safety 2.6 RJ-45 Connector The Intel MPRTM4808 board provides several RJ-45 connectors that commonly serve as different interfaces (RS-485, twisted-pair Ethernet, and telephone). Connecting different interfaces (e.g., Ethernet and RS-485) may damage the board. Therefore, make sure that you only connect matching interfaces. Furthermore, take note of the following: • Clearly mark TPE connectors near your working area as network connectors. • Connect TPE bushing of the system to safety
Краткое содержание страницы № 10
Installation Installation 3 3.1 Introduction ® The Intel NetStructure™ MPRTM4808 Rear Transition Board provides easy access to I/O signals of boards via the CompactPCI backplane. Backplane I/O signals are available at connector J5. To connect System Management Bus 1 and the Chassis Management Bus to the board, the Intel MPRTM4808 board provides the Intelligent Platform Management Bus 1 (IPMB1) and Intelligent Chassis Management Bus (ICMB) connectors. Figure 1. Location of IPMB1 and ICMB Conn
Краткое содержание страницы № 11
Installation 3.2 Standard Compliances The Intel MPRTM4808 board meets the following standards: Table 2. Standard Compliances Standard Description EN 60950 Legal safety requirements UL/cUL 1950 EN 55022 EN 55024 EMC requirements on system level EN 61000-6-2 FCC Part 15 Class A ANSI/IPC-A-610 Rev.C Class 2 ANSI/IPC-7711 Manufacturing standards ANSI/IPC-7721 ANSI-J-001...003 3.3 On-Board Connectors The Intel MPRTM4808 board provides the following on-board connectors: Figure 2. On-Board Connectors P
Краткое содержание страницы № 12
Installation 3.3.1 Secondary EIDE Interface The Intel MPRTM4808 board provides the secondary EIDE interface via CompactPCI connector J5. The secondary EIDE interface can be used for: • One EIDE device • Two EIDE devices • One EIDE device and one CompactFlash disk Caution: • If more than two IDE devices are connected to the IDE bus, the bus is unable to recognize all of the devices, and the baseboard might not start correctly. Therefore, only connect up to two devices to the secondary EIDE int
Краткое содержание страницы № 13
Installation Figure 4. Location of CompactFlash Slot Note: CompactFlash disks of types I and II are supported. 3.3.1.3 Installation Procedure Note: To configure the card to the supported true-IDE mode, the card must already be inserted when the board’s power is turned on. Inserting the CompactFlash while the board’s power is still on will configure the CompactFlash disk to PC Card ATA mode, which is not supported by the CPU board. If you have inserted the card while the board’s power has bee
Краткое содержание страницы № 14
Installation 3.3.1.4 Removal Procedure 1. Turn off CPU power. 2. Press ejector pin. The ejector pin loosens the CompactFlash disk from the socket. 3. Remove CompactFlash disk from Intel MPRTM4808 board. 4. Turn on CPU power. 3.3.2 Floppy Disk Drive Note: The board is not hot-swappable if a floppy disk drive is connected to the Intel MPRTM4808 board. The floppy disk drive connector is a 34-pin 2.54-mm pin-pitch connector. The following connector pinout shows how the pins are assigned. Figure 6.
Краткое содержание страницы № 15
Installation 3.3.4 PMC I/O Signals The I/O signals of PMC Slots 1 and 2 of the CPU board are routed to two 64-pin connectors. Figure 8 and Figure 9 show the pinouts. Figure 8. PMC 1 Connector Pinout ® Intel NetStructure™ MPRTM4808 Rear Transition Board Installation Guide 15
Краткое содержание страницы № 16
Installation Figure 9. PMC 2 Connector Pinout ® 16 Intel NetStructure™ MPRTM4808 Rear Transition Board Installation Guide
Краткое содержание страницы № 17
Installation 3.4 Switch Settings Caution: The Intel MPRTM4808 board provides two on-board switches and one FP reset switch. The switches must be set to OFF to avoid damage to attached PMC modules. Figure 10. Location of Switches Table 3. Switch Settings Switch No. Description SW2 ON: Reset disabled 1 OFF: RESET enabled(default) 2 Reserved, must be OFF (default) SW3 ON: Flash disk is master 1 OFF: Flash disk is slave (default) 2 Reserved, must be OFF (default) 3.5 Installing and Removing the Boa
Краткое содержание страницы № 18
Installation • Before touching integrated circuits, make sure that you are working in an ESD-safe environment. • When plugging the board in or removing it, use the handles; do not press on the front panel. 3.5.1 Installation Procedure Note: Connect interface cables to the on-board connectors first, since it may be difficult to reach them when the Intel MPRTM4808 board is already installed into the CompactPCI backplane. Connect interface cables to the front panel connectors after installing th
Краткое содержание страницы № 19
Installation 3.5.2 Removal Procedure 1. Check all installed boards for steps to perform before turning off power. 2. Turn off system power. 3. Unfasten screws of front panel until Intel MPRTM4808 board is detached from rack frame. 4. Unlock handles by pressing on red handle buttons. 5. Press handles outward to disconnect the Intel MPRTM4808 board from backplane. 6. Carefully remove Intel MPRTM4808 board from slot, making sure not to bend any pins. 7. Turn on system power. 3.6 CompactPCI Connecto
Краткое содержание страницы № 20
Installation Figure 13. J3 Connector Pinout (Rows D and E) Figure 14. J5 Connector Pinout (Rows A-C) ® 20 Intel NetStructure™ MPRTM4808 Rear Transition Board Installation Guide