Краткое содержание страницы № 1
DO NO DO NO DO NO DO NO DO NOT T T T T
DISCARD DISCARD DISCARD DISCARD DISCARD
Owner’s Manual
Installation and Operation
Models:
QV-Pier
QV-ST
Series: HV-IPI
CAUTION
DO NOT DISCARD THIS MANUAL
Important operating Read, understand and follow Leave this manual with
•• •
and maintenance these instructions for safe party responsible for
instructions included. installation and operation. use and operation.
WARNING: IMPROPER INSTALLATION,
WARNING: If the information in these
ADJUSTMENT, ALTERATION,
Краткое содержание страницы № 2
Safety and Warning Information These units MUST use one of the vent systems READ and UNDERSTAND all instructions carefully ! ! described in the Installing the Fireplace section of before starting the installation. FAILURE TO the Installers Guide. NO OTHER vent systems or FOLLOW these installation instructions may result components MAY BE USED. in a possible fire hazard and will void the warranty. This gas fireplace and vent assembly MUST be Prior to the first firing of the fireplace, READ the !
Краткое содержание страницы № 3
Table of Contents Safety and Warning Information .................................................. 2 Service Parts List ......................................................................... 4 Approvals and Codes .................................................................. 9 Appliance Certification ................................................................................... 9 Installation Codes ....................................................................................
Краткое содержание страницы № 4
Service Parts List QV-Pier-HV-IPI Beginning Manufacturing Date: 6-03 (NG, LP) Exploded Parts Diagram Ending Manufacturing Date: ______ 3 1 5 4 2 6 Log Assembly 7 13 11 12 9 8 7 10 Part number list on following page. 4 Quadra-Fire • QV-PIER, QV-ST Series: HV-IPI • 2005-901 Rev. G • 2/06
Краткое содержание страницы № 5
SERVICE PARTS LIST QV-PIER-HV-IPI IMPORTANT: THIS IS DATED INFORMATION. The most current information is located on your dealers VIP site. When ordering, supply serial and model numbers to ensure correct service parts. ITEM COMMON PART SERIAL # PART NUMBER Burner Orifice NG (#33DMS) 582-833 Burner Orifice LP (#50DMS) 582-850 1 End Glass Assembly GLA-MS 2 Glass Door Assembly GLA-6TROC 3 Burner Assembly 2005-006 4Log Grate 2005-012 5 Side Refractory SRV2005-730 6 Log Set Assembly LOGS-MSR 7Log 1 S
Краткое содержание страницы № 6
QV-ST-HV-IPI Service Parts (NG, LP) Exploded Parts Diagram Beginning Manufacturing Date: 6-03 Ending Manufacturing Date: ______ 4 2 3 1 5 Log Assembly 7 12 11 10 8 7 6 9 Part number list on following page. 6 Quadra-Fire • QV-PIER, QV-ST Series: HV-IPI • 2005-901 Rev. G • 2/06
Краткое содержание страницы № 7
SERVICE PARTS LIST QV-ST-HV-IPI IMPORTANT: THIS IS DATED INFORMATION. The most current information is located on your dealers VIP site. When ordering, supply serial and model numbers to ensure correct service parts. ITEM COMMON PART SERIAL # PART NUMBER Burner Orifice NG (#32DMS) 582-832 Burner Orifice LP (#50DMS) 582-850 1 Glass Door Assembly GLA-6TROC 2 Burner Assembly 2005-006 3Log Grate 2005-012 4Side Refractory SRV2005-730 5 Log Set Assembly LOGS-MSR 6Log 1 SRV2005-701 7Log 2 SRV2005-700 8
Краткое содержание страницы № 8
QV-PIER-HV-IPI QV-ST-HV-IPI Service Parts (NG, LP) Exploded Parts Diagram Beginning Manufacturing Date: 6-03 Ending Manufacturing Date: ______ 13 14 8 9 7 10 11 12 6 1 2 5 3 4 ITEM DESCRIPTION SERIAL # PART NUMBER 1 ON/OFF Rocker Switch 060-511 2 ON/OFF Wire Assembly 060-521A 3Valve NG 750-500 3Valve LP 750-501 4 Flexible Gas Connector 2005-009 5 Module 593-592 6 Wire Assembly 593-590A 7 Ember Box Assembly 2005-114 8Pilot Assembly NG 385-510A 8Pilot Assembly LP 385-511A 9 Pilot Bracket 2005
Краткое содержание страницы № 9
Approvals and Codes 1 Appliance Certification High Altitude Installations U.L. Listed gas appliances are tested and approved with- The Quadra-Fire fireplace models discussed in this Installers out requiring changes for elevations from 0 to 2,000 feet in Guide have been tested to certification standards and listed the U. S. A. and in Canada. by the applicable laboratories. When installing this appliance at an elevation above 2,000 feet, it may be necessary to decrease the input rating by Certific
Краткое содержание страницы № 10
Getting Started 2 Introducing the Quadra-Fire Gas Fireplaces The Quadra-Fire Warranty will be voided by, and Quadra- Fire disclaims any responsibility for, the following actions: Quadra-Fire direct vent gas fireplaces are designed to op- • Installation of any damaged fireplace or vent system erate with all combustion air siphoned from outside of the building and all exhaust gases expelled to the outside. component. • Modification of the fireplace or direct vent system. The information contained
Краткое содержание страницы № 11
5-1/4 (133mm) 1/2 (13mm) 12 (306mm) Ø8 (205mm) 12 42-5/8 Ø8 (305mm) (1082mm) (205mm) ELECTRICAL ACCESS 32-5/16 42 (820mm) 21-9/16 (1067mm) (547mm) GAS LINE 21-9/16 34-3/4 ACCESS (547mm) (883mm) 2-5/16 4-1/16 17-15/16 (58mm) (102mm) (455mm) 37-7/16 (950mm) 24 4-1/2 4-3/4 (610mm) (114mm) (121mm) TOP VENT COLLARS TOP STANDOFFS REAR VENT COLLARS SIDE GLASS GAS CONTROLS DOOR & LABELS GAS LINE ACCESS ELECTRICAL ACCESS Figure 1. Diagram of the QV-PIER-HV-IPI Quadra-Fire • QV-PIER, QV-ST Series: HV-I
Краткое содержание страницы № 12
5-14 (133mm) 1/2 (13mm) (4) 12 (306mm) Ø8 (205mm) 12 (305mm) Ø8 46-5/8 (205mm) (1183mm) ELECTRICAL ACCESS 32-5/16 (821mm) 4-1/2 34-3/4 42 (114mm) (882mm) (1067mm) 21-9/16 GAS LINE (548mm) ACCESS 8-1/2 (216mm) 2-5/16 36-3/16 24 4-1/16 (919mm) (58mm) 2-9/16 (610mm) (102mm) (64mm) 4-3/4 4-1/2 (121mm) (114mm) Figure 2. Dimensions of the QV-ST-HV-IPI TOP VENT COLLARS TOP STANDOFFS REAR VENT COLLARS GAS CONTROLS SIDE GLASS & LABELS DOOR GAS LINE ACCESS ELECTRICAL Figure 3. Diagram of the QV-ST-HV-IPI
Краткое содержание страницы № 13
Installing the Fireplace 3 Step 1. Locating the Fireplace Note: This location diagram MUST be followed when in- The diagram below shows space and clearance require- stalling a QV-Pier-HV with a Catalina shelf/marble package since the fireplace is installed further from finished wall. ments for locating a fireplace within a room. FINISHED Note: Refer to Figure 4B for dimensions and appliance WALL locations if installing a QV-PIER-HV unit with a Catalina shelf and/or marble package. GLASS GLASS
Краткое содержание страницы № 14
Step 2. Framing the Fireplace Minimum Clearances from the Fireplace to Combustible Materials Fireplace framing can be built before or after the fireplace is set in place. Framing should be positioned to accommo- date wall coverings and fireplace facing material. The dia- Inches mm gram below shows framing reference dimensions. Glass Sides or Ends .......... 36 .................... 914 CAUTION: MEASURE FIREPLACE DIMENSIONS AND Floor ................................... 0 .......................
Краткое содержание страницы № 15
Shows center of 10” x 12” vent framing holes for top and rear venting. The center of the hole is one inch (25.4mm) above the center of the horizontal vent pipe. E D Framing should be constructed of 2 X 4 lumber or heavier. QV-PIER-HV-IPI QV-ST-HV-IPI B B C A A C Model A B C D E QV-PIER-HV-IPI 42-1/8 42-1/2 23 35-3/4 48 QV-ST-HV-IPI 47-5/8 42-1/2 23 35-3/4 48 NOTE: DIMENSIONS SHOWN IN INCHES Figure 5. Framing Dimensions Quadra-Fire • QV-PIER, QV-ST Series: HV-IPI • 2005-901 Rev. G
Краткое содержание страницы № 16
DVP90ST 4 6 12 DVP4 DVP6 DVP12 14-1/4 12-3/16 2 MAX. MIN. 24 36 DVP12A 48 9-7/8 DVP24 O 45.0 10-1/4 DVP45 DVP36 11-1/4 7-1/4 1-1/4 TYP DVP48 8-9/16 1/2 TYP 12-9/16 NOTE: PIPES OVERLAP 1-1/4 INCHES AT EACH JOINT. Figure 6. DVP-Series Direct Vent Component Specifications (5-inch inner pipe / 8-inch outer pipe) 16 Quadra-Fire • QV-PIER, QV-ST Series: HV-IPI • 2005-901 Rev. G • 2/06
Краткое содержание страницы № 17
Identifying Vent Components Step 3. Installing the Vent System The vent systems installed on this gas fireplace may in- A. Vent System Approvals clude one, two, or three 90° elbow assemblies. The rela- These models are approved to use DVP series direct vent tionships of vertical rise to horizontal run in vent configura- pipe components and terminations (see Figures 6 and 7). tions using 90° elbows MUST BE strictly adhered to. The Approved vent system components are labeled for identifi- rise
Краткое содержание страницы № 18
STRAIGHT UP VERTICAL VENTING V (FT.) BREAK CAP 50' MAX. (15.2 M) HERE NOTE: On vertical venting Figure 10. Flue Restrictor configurations you may want to install the flue re- strictor (385-128). See flue - CHART - 3. Match the amount of restrictor installation in- Vertical Settings vertical you have in the structions. 4' 1-1 system with the chart to 8' 1-2 find the appropriate po- 15' 2-2 sition to set the Flue Re- 20' 2-3 strictor. 25' 3-3 30' 4-3 35' 4-4 40' 4-4 50' 4-5 Figure 8 4. Center
Краткое содержание страницы № 19
NATURAL GAS - VENTING WITH ONE 90° ELBOW V (FT.) H (FT.) 1' MIN. (305mm) 3' MAX. (914mm) 2' MIN. (610mm) 6' MAX. (1.83m) 3' MIN. (914mm) 9' MAX. (2.7m) 4' MIN. (1.22m) 12' MAX. (3.6m) 5’ MIN. (1.5m) 15’ MAX. (4.5m) 6’ MIN. (1.83m) 18’ MAX. (5.5m) V + H = 50’ MAX. (15.2m)(11.3m) PROPANE - VENTING WITH ONE 90° ELBOW V (FT.) H (FT.) 1' MIN. (305mm) 2' MAX. (610mm) V 2' MIN. (610mm) 4' MAX. (1.22m) 3' MIN. (914mm) 6’ MAX. (1.83m) 4' MIN. (1.22m) 8' M
Краткое содержание страницы № 20
NATURAL GAS VENTING WITH TWO 90° ELBOWS H V 1 V (FT.) H + H1 (FT.) H 0 90 Elbow on top 2.5’ MAX. (64mm) 1' MIN. (305mm) 3' MAX. (914mm) 2' MIN. (610mm) 6' MAX. (1.83m) 3' MIN. (914mm) 9' MAX. (2.7m) 4' MIN. (1.22m) 12' MAX. (3.6m) 5’ MIN. (1.5m) 15’ MAX. (4.5m) 6’ MIN. (1.83m) 18’ MAX. (5.5m) V + H + H1 = 50’ MAX. (15.2m) H + H1 = 18’ MAX. (5.5m) PROPANE VENTING WITH TWO 90° ELBOWS 1 V (FT.) H + H (FT.) 0 90 Elbow on top 2’ MAX. (610mm