Краткое содержание страницы № 17
c. LOAD Door Piston Air Lines and Cool Down Damper Piston Air Lines The LOAD door cylinder pneumatic connections are made in the lower heat console section, in the area behind the pneumatic panel. To connect the 1/4 poly-flo lines into the corresponding needle valves, match the number on the line with the number on the needle valve. Insert ALL of the air lines to make sure that the connections are complete. Repeat this process for the two (2) cool down piston air lines. 13
Краткое содержание страницы № 18
2. Electric a. Tumbler (Basket) Motors The disconnects for the two (2) tumbler (basket) motors are located in the lower heat console. The right drum (tumbler/basket) motor disconnect is located in the lower heat console on the upper shelf towards the left. The left drum (tumbler/basket) motor disconnect is located in the base of the lower heat console to the right. On both cables the mechanical connections should be made to the respective junction box. Remove the two (2) screws that hold down
Краткое содержание страницы № 19
c. Annunciator, Pendent, Over-Burner, and RTD (Resistive Temperature Device) Cable Remove the four (4) bolts that hold on the character (464) panel. Open the door to the main electrical enclosure, the female end of the RTD (Resistive Temperature Device) cable will be found there. Loosen the 1-inch (2.54 cm) lock nut and remove the modified hole seal. Put the female end of the RTD cable through the hole in the top of the electrical enclosure. Connect the male end and the female end of the RTD
Краткое содержание страницы № 20
d. Pendant On the top of the heat console section of the dryer near the pendant, there is a junction box with four (4) cables coming out of it. Two (2) of the cables from the junction box have connectors on the end, a 5-pin connector and an 11-pin connector. Coming out of the pendant should be two (2) cables, one with a 5- pin connector and the other with an 11-pin connector. Match up the four (4) cables into assigned pairs, check keying and connect the male and female connection together. 16
Краткое содержание страницы № 1
ADS-464 II
Installation/Operator’s Manual
WARNING: For your safety the
AVERTISSEMENT: Assurez-vous de bien
information in this manual must be
suivre les instructions données dans cette
followed to minimize the risk of fire or notice pour réduire au minimum le risque
explosion or to prevent property damage,
dincendie ou dexplosion ou pour éviter tout
personal injury or death. dommage matériel, toute blessure ou la mort.
Do not store or use gasoline or other flammable
Ne pas entreposer ni u
Краткое содержание страницы № 2
Retain This Manual In A Safe Place For Future Reference American Dryer Corporation products embody advanced concepts in engineering, design, and safety. If this product is properly maintained, it will provide many years of safe, efficient, and trouble-free operation. ONLY qualified technicians should service this equipment. OBSERVE ALL SAFETY PRECAUTIONS displayed on the equipment or specified in the installation/operator's manual included with the dryer. The following FOR YOUR SAFETY caution
Краткое содержание страницы № 3
IMPORTANT YOU MUST DISCONNECT and LOCKOUT THE ELECTRIC SUPPLY and THE STEAM SUPPLY BEFORE ANY COVERS or GUARDS ARE REMOVED FROM THE MACHINE TO ALLOW ACCESS FOR CLEANING, ADJUSTING, INSTALLATION, or TESTING OF ANY EQUIPMENT per OSHA (Occupational Safety and Health Administration) STANDARDS. «Attention: Lor des opérations dentretien des commandes étiqueter tous fils avant Caution: Label all wires prior to de les déconnecter. Toute erreur de disconnection when servicing controls. Wiring câbla
Краткое содержание страницы № 4
WARNING The dryer must never be operated with any of the back guards, outer tops, or service panels removed. PERSONAL INJURY or FIRE COULD RESULT. WARNING DRYER MUST NEVER BE OPERATED WITHOUT THE LINT FILTER (SCREEN) IN PLACE, EVEN IF AN EXTERNAL LINT COLLECTION SYSTEM IS USED. IMPORTANT PLEASE OBSERVE ALL SAFETY PRECAUTIONS displayed on the equipment or specified in the installation/operator's manual included with the dryer. Dryers must not be installed or stored in an area where it will be ex
Краткое содержание страницы № 5
Table of Contents SECTION I IMPORTANT INFORMATION ........................................................................................................ 3 A. Receiving and Handling ............................................................................................................... 3 B. Safety Precautions ...................................................................................................................... 4 SECTION II SPECIFICATIONS/DIMENSIONS........................
Краткое содержание страницы № 6
SECTION VII SERVICE/PARTS INFORMATION ................................................................................................ 40 A. Service ..................................................................................................................................... 40 B. Parts ........................................................................................................................................ 40 SECTION VIII WARRANTY INFORMATION ...............................
Краткое содержание страницы № 7
SECTION I IMPORTANT INFORMATION A. RECEIVING and HANDLING The dryer is shipped in a protective stretch wrap cover with protective cardboard corners and top cover (or optional box) as a means of preventing damage in transit. Upon delivery, the dryer and packaging, and wooden skid should be visually inspected for shipping damage. If any damage whatsoever is noticed, inspect further before delivering carrier leaves. Dryers damaged in shipment. 1. ALL dryers should be inspected upon receipt and
Краткое содержание страницы № 8
B. SAFETY PRECAUTIONS WARNING: For your safety, the information in this manual must be followed to minimize the risk of fire or explosion or to prevent property damage, personal injury, or loss of life. WARNING: The dryer must never be operated with any of the back guards, outer tops, or service panels removed. PERSONAL INJURY or FIRE COULD RESULT. 1. DO NOT store or use gasoline or other flammable vapors and liquids in the vicinity of this or any other appliance. 2. Dryers must be exhausted t
Краткое содержание страницы № 9
7. This dryer is not to be used in the presence of dry cleaning solvents or fumes. 8. Remove articles from the dryer as soon as the dryer cycle has been completed. WARNING: Articles left in the dryer after the drying and cooling cycles have been completed can create a fire hazard. 9. READ and FOLLOW ALL CAUTION and DIRECTION LABELS ATTACHED TO THE DRYER. WARNING: YOU MUST DISCONNECT and LOCKOUT THE ELECTRICAL SUPPLY and THE STEAM SUPPLY BEFORE ANY COVERS or GUARDS ARE REMOVED FROM THE MACHINE TO
Краткое содержание страницы № 10
SECTION II SPECIFICATIONS/DIMENSIONS A. SPECIFICATIONS MAXIMUM CAPACITY (DRY WEIGHT) 460 lbs. 208.66 kg Total Weight 10,500 lbs. 4,762.7 kg Total Shipping Weight 10,800 lbs. 4,898.8 kg Tilt Height 137-1/4" 348.6 cm Operating Height 114-1/2" 290.83 cm Full Tilt Depth 117-1/2" 298.45 cm Operating Depth 95" 241.3 cm Width 122" 309.88 cm Tilt Load (REAR TILT) 15º Tilt Unload (FRONT TILT)15º Loading Height from Floor 65-5/8" 166.69 cm Tumbler (BASKET) Diameter 69-1/8" 175.58 cm Tumbler
Краткое содержание страницы № 11
B. DIMENSIONS NOTE: ADC reserves the right to make changes in specifications at any time, without notice or obligation. 7
Краткое содержание страницы № 12
SECTION III INSTALLATION PROCEDURES Installation should be performed by competent technicians in accordance with local and state codes. In the absence of these codes, the installation must conform to applicable NATIONAL ELECTRICAL CODE ANSI/ NFPA NO. 70-LATEST EDITION, or in Canada, the CANADIAN ELECTRICAL CODES PARTS 1 & 2 CSA C22.1-1990 or LATEST EDITION. A. REASSEMBLY OF DRYER IMPORTANT: Always keep the tumbler (basket) section of the dryer in an upright position when moving it. 1. Reassem
Краткое содержание страницы № 13
2. Reassembly Instructions For Dryers Shipped In Three (3) Pieces When the dryer is shipped in three (3) pieces, the tumbler (basket) and the tumbler (basket) base sections are shipped as two (2) separate pieces. The heat console section is shipped as the third piece. a. Reassemble The Tumbler (Basket) Base Section To The Heat Console Section Move the heat console section into position by using cables through the eye bolts located at the top of the section or by using a fork truck and lifting t
Краткое содержание страницы № 14
c. Reassemble The Tumbler (Basket) Section To The Tumbler (Basket) Base Lift the tumbler (basket) section with a cable through the eye bolts on top of the section. Slowly lower the tumbler (basket) section over the tumbler (basket) base. The four (4) large slots located on the bottom of the tumbler (basket) section (one slot at each corner of the tumbler [basket] section) must be aligned with the tapped holes in the cylinder cleaves located at the top of the tumbler (basket) section. Use the
Краткое содержание страницы № 15
B. LOCATION REQUIREMENTS The model ADS-464 dryer requires 36-inches (99 cm) of space on each side of the dryer and 36-inches (99 cm) of space behind the unit for ease of maintenance and tilting. The dryer must be leveled for proper operation. If shimming is required, put 9-1/2 x 9-1/2 (24 cm x 24 cm) metal shims under the base feet. The dryer must be lagged to the floor. IMPORTANT: Dryer should be located where a minimum amount of exhaust duct will be necessary. 11
Краткое содержание страницы № 16
C. INTERNAL AIR, ELECTRICAL, and WATER CONNECTIONS 1. Air a. Front Tilt Piston and Sprinkler Lines This connection is made at the front of the dryer in the area between the lower heat console section and the tumbler (basket) base section. To connect the sprinkler air line insert the 1/4 aluminum tubing into the 1/4 brass compression fitting and tighten the fitting nut. To connect the 3/8 poly-flo tubing to the corresponding brass fittings, match the marked number on the tube with the numbe