Краткое содержание страницы № 1
Краткое содержание страницы № 2
Краткое содержание страницы № 3
Краткое содержание страницы № 4
Table of Contents Assembly 4 Venting 8 Installation 11 Operation 20 Maintenance 27 Troubleshooting 31 Feeder Parts 32 Specifications 33 Wiring Diagram 34 Parts List & Options 35 Warranty 36 Testing Label 37 Quick Reference Start-Up Back Cover Please read this entire manual before you install and use your new boiler. Failure to follow instructions may result in property damage, bodily injury, or even death. SAVE THESE INSTRUCTIONS Harman Stove Company 352 Mountain House Road Halifax, PA 1703
Краткое содержание страницы № 5
Assembly 5 Outdoor Air Temperature Sensor Wiring : T Te em mp pe er ra attu ur re / e / P Pr ress essu ur re e G Ga au ug ge e Aq Aqu ua as st ta at t W We el ll l Pr Pre es ss su ur re e R Re elliie ef f V Va allv ve e Bl Bla an nk k Co Cov ve er r* * H Heat eat E Ex xc ch ha an nger ger * *R Re em mo ov ve ed d w/ Do w/ Dom me es sttic ic Ho Hott Cl Cle ea an no ou utt R Ro od d H Ha an nd dlle es s W Wa at te er r C Co oi il l O Op pt ti ion on Sh Show own n H Her ere e QT QTY Y (
Краткое содержание страницы № 6
Краткое содержание страницы № 7
Assembly MINIMUM NON-COMBUSTIBLE FLOOR PROTECTION AREA After assembly of the flue tunnel weldment, combustion blower assembly with wiring and heat shield, the boiler can now be installed. 1. Install the control board cover as well as the access Non-Combustible cover located on the feeder cover. Floor Protector 2. Install the spring handles provided with the unit on the ash door, firebox door and the heat exchanger cleanout rod handles. (Fasten handles by turning them counterclock- wise and pushi
Краткое содержание страницы № 8
Assembly When installing the PB105 in a mobile home several INSTALLATION IS TO BE PERFORMED BY A requirements must be followed: QUALIFIED INST ALLER. 1. The unit must be bolted to the floor. 2. The unit must be connected to outside air. NOTE: All installation clearances and restrictions 3. Floor protection and clearances must be followed. must be adhered to. 4. Unit must be grounded to the metal frame of the mobile home. NOTE:Use only 4” diameter type “L” or “PL” venting system. Be sure to inspe
Краткое содержание страницы № 9
Venting Requirements for Terminating the Venting H. A vent must not be installed within 3 feet (90 W ARNING: V enting terminals must not be recessed cm) above a gas meter/regulator assembly when mea- into a wall or siding. 1 sured from the horizontal center-line of the regulator. NOTE: Only PL vent pipe wall pass-throughs and I. The clearance to service regulator vent outlet 1 fire stops should be used when venting through combus- must be a minimum of 6 feet. tible materials. J. The clearance
Краткое содержание страницы № 10
Venting 10 Fig. 3
Краткое содержание страницы № 11
Venting Venting Venting Use 4” pellet vent pipe to vent your PB105. A combustion blower is used to extract the combustion gases from the firebox. This creates a negative pressure in the firebox and a positive pressure in the venting system as shown in Fig. 4. The longer the vent pipe and more elbows used in the system, the greater the flow resistance. Because 4” Type “L” or of these facts we recommend using as few elbows as pos- “PL” Vent pipe sible and 30 feet or less of vent pipe. The maximum
Краткое содержание страницы № 12
Краткое содержание страницы № 13
Installation Outside Air Outside air is optional, although it may be required by some building codes. The benefit of outside air is higher efficiency and reduced venting restrictions mainly noticed in small and very tight houses. To install outside air, use 2 3/4”" I.D.galvinized steel flex pipe, part # 2-00-08544 ( 12’ 6” length) or part # 2-00-08545 ( 25’ length) See Fig. 6. There is a break- away hole on the rear panel which must be removed Inlet Cover part# before connecting the flex pipe
Краткое содержание страницы № 14
Main Wiring Installation 14 To install power to the boiler first remove the cover on the 4” X 4” junction box located on the back of the unit. There are several knockout holes provided for the incoming main power wires. Also, a knockout hole can be used for the auxiliary output overheat zone (if used). The minimum recommended circuit is 6 AMP - 120 VAC - 60 HZ. This boiler should be the only appliance on the circuit. If a 15 AMP circuit breaker is used at the distribution box, the boiler must b
Краткое содержание страницы № 15
Краткое содержание страницы № 16
Installing Duct/Air Conditioning Installation Boilers intended to be connected to an existing boiler or boiler system shall: 1. Be capable of being installed without interfering with the normal delivery of heated water from the original boiler to the radiation system. 2. Be capable of being installed to operate as intended without affecting the operation of the electrical and mechanical safety controls of the original boiler. 3. Provide, upon completion of the installation, for a change over fro
Краткое содержание страницы № 17
Installation 17
Краткое содержание страницы № 18
Installation 18
Краткое содержание страницы № 19
Installation 19
Краткое содержание страницы № 20