Resumo do conteúdo contido na página número 1
IMPORTANT FOR FUTURE REFERENCE
Please complete this information and retain this
manual for the life of the equipment:
Model #: ___________________________
Serial #: ___________________________
Date Purchased: ____________________
OPERATOR’S MANUAL
Heavy Duty Counterline
Griddle Models Charbroiler Models Open Top Models
HDG-24 HDG-24E HDC-24 HDCL-24 HDO-12 HDO-24SU
HDG-36 HDG-36E HDC-36 HDCL-36 HDO-24 HDO-36SU
HDG-48 HDG-48E HDC-48 HDCL-48 HDO-36
HDG-60 HDG-60E
! WARNING
Improp
Resumo do conteúdo contido na página número 2
HEAVY DUTY COUNTERLINE SAFETY PRECAUTIONS Before installing and operating this equipment, be sure everyone involved in its operation is fully trained and aware of precautions. Accidents and problems can be caused by failure to follow fundamental rules and precautions. The following symbols, found throughout this manual, alert you to potentially dangerous conditions to the operator, service personnel, or to the equipment. This symbol warns of immediate hazards that will result in severe in
Resumo do conteúdo contido na página número 3
HEAVY DUTY COUNTERLINE TABLE OF CONTENTS Congratulations! You have purchased one of the finest pieces of commercial cooking equipment on the market. You will find that your new equipment, like all Southbend equipment, has been designed and manufactured to meet the toughest standards in the industry. Each piece of Southbend equipment is carefully engineered and designs are verified through laboratory tests and field installations. With proper care and field maintenance, you will experience
Resumo do conteúdo contido na página número 4
SPECIFICATIONS HEAVY DUTY COUNTERLINE SPECIFICATIONS NOTICE Installation must comply with National Fuel Gas Code, ANSI Z223.1, Natural Gas Installation Code, CAN/CGA-B149.1, or the Propane Installation Code, CAN/CGA-B149.2, as applicable. Local codes regarding installation vary greatly from one area to another. The National Fire Protection Association, Inc. states in its NFPA 96 latest edition that local codes are the “authority having jurisdiction” when it comes to installation requirem
Resumo do conteúdo contido na página número 5
SPECIFICATIONS HEAVY DUTY COUNTERLINE SPECIFICATIONS CLEARANCES ! WARNING There must be adequate clearance between units and adjacent construction. Clearance must also be provided for servicing and for operation. Measure back clearance from rear of 2" stand-off brackets. Minimum Clearances from COMBUSTABLE construction: Griddle Models Open Top Models Sides 12" 10" Back 8" 7" Minimum Clearances from NON-COMBUSTABLE construction: Griddle Models Charbroiler Models Open Top Models
Resumo do conteúdo contido na página número 6
SPECIFICATIONS HEAVY DUTY COUNTERLINE Figure 2 DIMENSIONS OF GRIDDLE MODELS 1.5" 24.0" 30.0" Top View Width (see table below) 31.5" 16.0" 15.1" 11.0" 10.0" 5.4" 2.0" 2.8" 29.4" Side View Front View Model Width Number and Size of Burners Total BTU HDG-24 & HDG-24E 24" 2 @ 30,000 60,000 HDG-36 & HDG-36E 36" 3 @ 30,000 90,000 HDG-48 & HDG-48E 48" 4 @ 30,000 120,000 HDG-60 & HDG-60E 60" 5 @ 30,000 150,000 CONSTRUCTION OF GRIDDLE MODELS The front, sides, and 5" riser are all stainles
Resumo do conteúdo contido na página número 7
SPECIFICATIONS HEAVY DUTY COUNTERLINE SPECIFICATIONS Figure 3 DIMENSIONS OF CHARBROILER MODELS 1.5" 21.5" 30.0" Top View Width (see table below) 31.5" 16.0" 15.1" 11.0" 10.0" 5.3" 2.0" 2.8" 29.4" Front View Side View Model Width Number and Size of Burners Total BTU HDC-24 & HDCL-24 24" 4 @ 20,000 80,000 HDC-36 & HDCL-36 36" 6 @ 20,000 120,000 HDC-48 & HDCL-48 48" 8 @ 20,000 160,000 CONSTRUCTION OF CHARBROILER MODELS The front, top-rail sides, and 5" riser are all stainless steel.
Resumo do conteúdo contido na página número 8
SPECIFICATIONS HEAVY DUTY COUNTERLINE Figure 4 DIMENSIONS OF OPEN TOP MODELS 3.9" 2.0" 24.4" Top View Width (see table below) 15.3" 2.8" 11.0" 9.0" 6.3" Front View Side View Model Width Number and Size of Burners Total BTU HDO-12 12.25" 2 @ 26,000 52,000 HDO-24 & HDO-24SU 24.5" 4 @ 26,000 104,000 HDO-36 & HDO-36SU 36.625" 6 @ 26,000 156,000 CONSTRUCTION OF OPEN TOP MODELS The front, top-rail sides, and 5" riser are all stainless steel. The rear and bottom panels are aluminized s
Resumo do conteúdo contido na página número 9
INSTALLATION HEAVY DUTY COUNTERLINE INSTALLATION INSTALLATION NOTICE Installation must comply with National Fuel Gas Code, ANSI Z223.1, Natural Gas Installation Code, CAN/CGA-B149.1, or the Propane Installation Code, CAN/CGA-B149.2, as applicable. These installation procedures must be followed by qualified personnel or warranty will be void. Local codes regarding installation vary greatly from one area to another. The National Fire Protection Association, Inc. states in its NFPA 96 lates
Resumo do conteúdo contido na página número 10
INSTALLATION HEAVY DUTY COUNTERLINE Step 2a: Installation on Countertop Legs To install the appliance using countertop legs, do the following: 1. Locate the box of four legs shipped with the appliance (if countertop legs were ordered). 2. Raise the appliance about 6" so that the legs can be screwed into the bottom near the corners. Lift the appliance only from the ends, never from the middle! Support the lifted appliance so that it will not fall while you are attaching the legs. 3. Scre
Resumo do conteúdo contido na página número 11
INSTALLATION HEAVY DUTY COUNTERLINE INSTALLATION Step 2b: Installation Directly on a Non-Combustible Countertop Surface The appliance may be installed directly onto a flat NON-COMBUSTIBLE surface, as follows: 1. Place the appliance in the position that it will be used. Lift the appliance only from the ends, never from the middle! 2. Connect the gas supply (see Step 4 on page 18), then return to this procedure. 3. Check that the appliance is in the position you want it to be in. 4. Seal t
Resumo do conteúdo contido na página número 12
Resumo do conteúdo contido na página número 13
INSTALLATION HEAVY DUTY COUNTERLINE INSTALLATION Step 2d: Installation on Floor Stand (24", 36", and 48" Models) The 24", 36", and 48" appliances may be installed on top of an optional floor stand (for 60" griddles, go to Step 2e on page 15). The floor stand is shipped in a separate crate and must be assembled, as follows: 1. Position the bottom-brace pieces on a flat surface, as shown in Figure 8 below. There are two bottom- side braces (items “A”), a bottom-front brace (item “B”), and an
Resumo do conteúdo contido na página número 14
Resumo do conteúdo contido na página número 15
Resumo do conteúdo contido na página número 16
INSTALLATION HEAVY DUTY COUNTERLINE Figure 11 J K P K I I H H P J L L N O M 7. Check the partially assembled stand to make sure that the legs are straight and that all corners are square. Now tighten all bolts, but do not over tighten. 8. If legs with casters were ordered, lift the stand and screw the caster assemblies into the bottom of the legs. The two casters with wheel-locks go on the front corner legs. After the stand is assembled, connect the required restraint to protect th
Resumo do conteúdo contido na página número 17
INSTALLATION HEAVY DUTY COUNTERLINE INSTALLATION Step 3: Attach Restraint for Appliances Mounted on Casters NOTICE For an appliance equipped with casters, (1) the installation shall be made with a connector that complies with the Standard for Connectors for Movable Gas Appliances, ANSI Z21.69 or Connectors for Moveable Gas Appliances, CAN/CGA-6.16, and a quick-disconnect device that complies with the Standard for Quick-Disconnect Devices for Use With Gas Fuel, ANSI Z21.41, or Quick Discon
Resumo do conteúdo contido na página número 18
INSTALLATION HEAVY DUTY COUNTERLINE 2. Install eye-bolt (item “F”) to a frame member on the rear of the appliance. After checking carefully behind the frame member for adequate clearance, drill a 1/4" hole through the frame member. 3. Thread hex nut (item “G”) and slide the washer (item “H”) onto the eye-bolt. Insert the eye-bolt through the 1/4" drilled hole and secure with a washer (item “H”) and nylon lock nut (item “I”). 4. Using the spring-loaded snap hooks, attach the restraining dev
Resumo do conteúdo contido na página número 19
INSTALLATION HEAVY DUTY COUNTERLINE INSTALLATION 5. Connect the vent line from the pressure regulator to the outdoors in accordance with local codes or, in the absence of local codes, with the National Fuel Gas Code, ANSI Z223.1, Natural Gas Installation Code, CAN/CGA-B149.1, or the Propane Installation Code, CAN/CGA-B149.2, as applicable. 6. Connect the gas inlet of the pressure regulator to the building’s supply system. No segment of the gas supply connection to the appliance should be s
Resumo do conteúdo contido na página número 20
INSTALLATION HEAVY DUTY COUNTERLINE Step 7: Final Installation Steps for Griddle Models This step applies only to the installation of griddle models. New griddles should be carefully tempered and cared for in order to avoid possible damage. To break in a new griddle, do the following: 1. Wipe the griddle surface clean. 2. Light all the griddle burners and turn them to 200°F for one hour. Then gradually bring each griddle up to frying temperature. 3. Spread three or four ounces of beef su