Resumo do conteúdo contido na página número 1
SHERWOOD INDUSTRIES IS AN ENVIRONMENTALLY RESPONSIBLE COMPANY. THIS MANUAL IS PRINTED ON RECYCLED PAPER.
PLEASE KEEP THESE INSTRUCTIONS FOR FUTURE REFERENCE
PELLET STOVE
Empr ess
Fireplace Insert
TECHNICAL MANUAL
Contact your building or fire officials about restrictions and installation
inspection requirements in your area.
PLEASE READ THIS ENTIRE MANUAL BEFORE INSTALLATION AND USE
OF THIS PELLET BURNING ROOM HEATER. FAILURE TO FOLLOW THESE
INSTRUCTIONS COULD RESULT IN PROPERTY DAMAGE, BODI
Resumo do conteúdo contido na página número 2
Table of Contents Introduction............................................................................................................3 Rating Label Location.....................................................................................3 Important Safety Data....................................................................................3 Safety Warnings And Recommendations...........................................................3 Automatic Safety Features........................
Resumo do conteúdo contido na página número 3
Introduction * This manual is designed for the technician in conjunction with the owner’s manual. * RATING LABEL LOCATION: The rating label is located on the hopper top behind the surround panel. IMPORTANT SAFETY DATA: Please read this entire Owner’s Manual before installing or operating this ENVIRO Pellet Stove. Failure to follow these instructions may result in property damage, bodily injury or even death. Contact your local building or fire official to obtain a permit and any information on
Resumo do conteúdo contido na página número 4
Introduction ELECTRICAL: The use of a surge protected power bar is recommended. The unit must be grounded. The grounded electrical cord should be connected to a standard 120 volts, 60 hertz electrical outlet and also must be accessible. If this power cord should become damaged, a replacement power cord must be purchased from the manufacturer or a qualified ENVIRO dealer. Be careful that the electrical cord is not trapped under the appliance and that it is clear of any hot surfaces or sharp e
Resumo do conteúdo contido na página número 5
Installation REMOVING PELLET STOVE FROM PALLET: 5 Use a flathead screwdriver or /16” socket to remove the four (4) screws that secure the Empress FPI to the pallet. Two (2) of the screws are shown in Figure 1 and the other two (2) are in the same location but on the opposite side; behind the circuit board and beside the power cord. Figure 1: Removing Stove From the Pallet. DIMENSIONS: 1 1 3 0 / 1 6 " ( 7 7 9 mm) 1 5 2 7 / 1 6 " ( 7 1 0 m m ) 7 2 0 / 8 " ( 5 3 0 m m ) 1 1 7 / 1 6 " ( 1 9 6 m
Resumo do conteúdo contido na página número 6
1 2 " ( 3 0 . 5 c m ) M a n t l e F l o o r P r o t e c t i o n ; M i n 6 " ( 1 5 c m ) i n f r o n t o f do o r Installation 3 3 1 / 8 " ( 7 9 7 m m) 9 2 8 / 1 6 " ( 7 2 5 mm ) 1 2 4 / 1 6 " ( 6 1 1 m m ) 5 4 2 / 8 " ( 1 0 8 3 m m) Figure 3: Dimensions of Empress Fireplace Insert with Optional Skirt. CLEARANCES TO COMBUSTIBLES: Refer to Figure 4. Side wall to center of unit 24 inches (61.0 cm) Side wall to surround 3 inches (7.6 cm) Mantel projection 12 inches (30.5 cm) Mantel to bottom of
Resumo do conteúdo contido na página número 7
Installation MASONRY FIREPLACE INSTALLATION: R a i n C a p If installing the Empress with a skirt S t eel P l a t e o r F l a s h i n g the skirt must be installed before the installation. F l ex i bl e o r R i g i d 3" A non-combustible hearth pad must S t a i n l es s S teel Li n e r cover combustible flooring underneath, as well as 6” (150 mm) in front of the heater and 6” (150 mm) to the side of the heater. 1. Install the hearth pad. 2. Lock the fireplace damper in the D am pe r R e m
Resumo do conteúdo contido na página número 8
Installation POSITIVE FLUE CONNECTION WITHOUT A FULL RELINE (USA ONLY): This unit does not require a full reline (in USA only) when installing into a masonry fireplace, however, it is recommended to ensure proper drafting of the appliance. IMPORTANT: Ensure the chimney and firebox are cleaned and free of all debris, including soot and ashes, before proceeding with this installation. If it is not clean soot maybe blown into the room through the unit’s blower. Ensure the fireplace and chimney
Resumo do conteúdo contido na página número 9
Installation ADJUSTING HOPPER HEIGHT: The back height of this unit can be set to one (1) of three (3) 13 13 13 heights; 19 /16” (503 mm), 20 /16” (529 mm), 21 /16” (554 mm). The hopper should be set to the maximum height that can be used in the installation. To change the height of the hopper up or down, remove the seven (7) T-20 screws, three (3) on each side and one (1) on the back. The screw placement is shown Figure 8. Move the hopper assembly to the required setting and replace the
Resumo do conteúdo contido na página número 10
Installation SURROUND PANEL INSTALLATION: 1. Lift the cast top, it will come up and forward. 2. Install the daughter board onto the right side of the surround panel onto the two (2) studs. Fasten into place with a wingnut on each stud. 3. Plug the wiring harness from the daugther board into the mother board. 4. Slide the surround panel behind the cast top and line up the two (2) hooks on either side on the surround panel with the slots on either side of the Empress FPI. Wiggle the surround to
Resumo do conteúdo contido na página número 11
Installation SLIDER/DAMPER SETTING: This is used to regulate the airflow through the pellet stove. THE SLIDER / DAMPER MUST BE SET AT TIME OF INSTALLATION. A Qualified Service Technician or Installer must set the Slider Damper. The slider damper is located behind the cast doors and under the firebox. • If the fire should happen to go out and the heat output indicator has been set on the lowest setting, the Slider Damper should be moved to the left slightl, lessen the air flow into the fi
Resumo do conteúdo contido na página número 12
Troubleshooting DO NOT: ● Service the stove with wet hands. The stove is an electrical appliance, which may pose a shock hazard if handled improperly. Only qualified technicians should deal with possible internal electrical failures. ● Do not remove from the firebox any screws without penetrating oil lubrication. ● Hold the ON / OFF BUTTON down. This is a momentary contact switch and can be damaged if held down too long. WHAT TO DO IF: 1. The stove will not start. 2. The stove will not operat
Resumo do conteúdo contido na página número 13
Troubleshooting üCheck the exhaust blower voltage across the blower wires (>=114V on #5 setting and >= 82V on #1 setting). – Replace the Circuit Board if the Voltage reading is less than 82V. with a line voltage >115V AC. üCheck vacuum levels in the exhaust channel by bypassing the vacuum switch, then remove the vacuum hose from vacuum switch. Check the vacuum readings by placing the open end of the vacuum hose on a Magnahelic Gauge (readings must be above 0.07” W.C. (17.4 Pa) on low fire).
Resumo do conteúdo contido na página número 14
Troubleshooting Auger light flashes but auger motor does not turn at all. üIf the auger gear box does not turn but the motor’s armature does try to spin then the auger is jammed. – Try to break apart jam by poking at the jam through the drop tube. If this fails then empty the hopper and remove the auger cover **remember to re-seal the cover after installation** üCheck the fuse on the motherboard; nothing will work if the fuse is blown. 6. The convection blower will not function normally. üCl
Resumo do conteúdo contido na página número 15
Wiring Diagram Or a n ge V acu u m D a ughter B o ar d Or a n ge S w i tch R e d C o nne c t T he r m o s tat H e r e B l u e C o m b us t i on W h i te B l o w er R ed B r o w n o o 12 0 F ( 49 C ) E xha u s t P ow e r T em p e r a tu r e C or d Gr o u nd S e n so r T h er m os tat B r o w n S el ec t or P i ns B l ac k R ed 115 V 11 5 V B l ac k W h i te W hi t e B l ac k 220 V 22 0 V B l u e B r o w n C o m m o n H ot M o ther B o a rd I g ni t o r B l a c k W h i te G r ey G r ey P u r p l e
Resumo do conteúdo contido na página número 16
Parts List Reference Part Description Number Number 1 120 °F (49 °C) Ceramic Fan Temperature Sensor EC-001 Domestic Power Cord - 115V EC-042 2 Auger Motor - 115V EF-001 3 High Limit Temp Sensor 200 °F (93 °C) Manual Reset EF-016 Silicone Hose EF-018 4 Ash Pan Latch EF-060 Pellet Stove Cleaning Brush EF-156 5 Convection Blower - 115V EF4i-002 Door Screen 50-177 6 Brick Panel Retainers (set of 2) 50-185 7 Door Knob - Brushed Nickel 50-262 8 Combustion/ Exhaust Blower - 115V 50-473 9 400 Watt Igni
Resumo do conteúdo contido na página número 17
Parts List Reference Part Description Number Number 15 Exhaust Starter Tube 3” Quick Connect 50-1391 16 Mother Board - 120V 50-1392 17 Daughter Board - 120V 50-1393 18 Slider Damper & Lever 50-1394 19 Exhaust Starter Elbow Quick Connect 50-1395 20 Exhaust Starter Gasket 50-1396 21 Daughter Board Decal 50-1397 22 Ignitor & Intake Tube 50-1398 23 Cast Brick Panel Set 50-1399 24 Inner Door Complete with Glass & Tape 50-1400 25 Burn Pot Liner with Sides 50-1401 26 Door Bolt, Hardened Bushing & Nut
Resumo do conteúdo contido na página número 18
Parts Diagram - Components E m p r e s s - F i r e p l ac e I n ser t C o m p o n en t s O c t o b e r 2 0 0 6 3 1 1 1 8 10 2 1 2 1 7 16 5 9 12 1 4 18
Resumo do conteúdo contido na página número 19
Parts Diagram - Parts 19 31 29 28 1 9 24 26 25 2 7 23 1 5 2 0 4 22 18 7 13 6 3 2 E m p r e s s - F i r e p l a c e I n s e r t P a r t s O ct o b e r 2 0 0 6 30
Resumo do conteúdo contido na página número 20
Warranty Sherwood Industries Ltd. is the manufacturer of the Enviro line of heating products. At Sherwood Industries, our commitment to the highest level of quality and customer service is the most important thing we do. Each Enviro stove is built on a tradition of using only the finest materials and is backed by our Exclusive Lifetime Limited Warranty to the original purchaser. With Enviro, you’re not just buying a stove, you’re buying a company with years of unequalled performance and qual