Resumo do conteúdo contido na página número 1 
                    
                        SHERWOOD INDUSTRIES IS AN ENVIRONMENTALLY RESPONSIBLE COMPANY. THIS MANUAL IS PRINTED ON RECYCLED PAPER.
PLEASE KEEP THESE INSTRUCTIONS FOR FUTURE REFERENCE
PELLET STOVE
Ber n
TECHNICAL MANUAL
� � � �
PLEASE READ THIS ENTIRE MANUAL BEFORE INSTALLATION AND USE 
OF THIS PELLET BURNING ROOM HEATER. FAILURE TO FOLLOW THESE 
INSTRUCTIONS COULD RESULT IN PROPERTY DAMAGE, BODILY INJURY 
OR EVEN DEATH
Contact your building or fire officials about restrictions and installation 
inspection requirements in
                    
                    Resumo do conteúdo contido na página número 2 
                    
                        Table of Contents Introduction...................................................................................................................................3 Rating Label Location................................................................................................................3 Important Safety Data...............................................................................................................3 Safety Warnings And Recommendations.................................
                    
                    Resumo do conteúdo contido na página número 3 
                    
                        Introduction * This manual is designed for the technician in conjunction with the owner’s manual. * RATING LABEL LOCATION: The rating label is located on the back of the unit. IMPORTANT SAFETY DATA: Please read this entire Owner’s Manual before installing or operating this ENVIRO Pellet  Stove. Failure to follow these instructions may result in property damage, bodily injury  or even death. Contact your local building or fire official to obtain a permit and any information on  installation restr
                    
                    Resumo do conteúdo contido na página número 4 
                    
                        Introduction ELECTRICAL: The use of a surge protected power bar is recommended. The unit must be  grounded. The grounded electrical cord should be connected to a standard 220-240 volts,, nominal  average 0.8 Amps (1.4  Amps peak), 50 hertz electrical outlet and also must be accessible. If this power  cord should become damaged, a replacement power cord must be purchased from a qualified ENVIRO  dealer. Be careful that the electrical cord is not trapped under the appliance and that it is clear of
                    
                    Resumo do conteúdo contido na página número 5 
                    
                        Installation DECIDING WHERE TO LOCATE YOUR PELLET APPLIANCE: 1.  Check clearances to combustibles. 2.  Do not obtain combustion air from an attic, garage or any unventilated space.  Combustion air may  be obtained from a ventilated crawlspace. 3.  Do not install the stove in a bedroom. 4.  You can vent the stove through an exterior wall behind the unit or connect it to an existing masonry  or metal chimney (must be lined if the chimney is over 6” (15 cm) diameter, or over 28 inches² (180  cm²) c
                    
                    Resumo do conteúdo contido na página número 6 
                    
                        Installation APPLIANCE DIMENSIONS AND SPECIFICATIONS: 1 15 / 2 " ( 3 9 3 m m ) Weight (with full hopper): 238 lb (108 Kg) Hopper Capacity: up to 52 lb (23.6 Kg) Voltage: 220 - 240 V Max Current: 1.4 Amps Consumption on High: 2.9 lb/hr (1.3 Kg/hr)* Consumption on Low: 0.9 lb/hr (0.4 Kg/hr)* (Note: Consumption will vary with the type of  fuel used.) 7 7 1 8 / 8 " 17 / 8 " ( 455 m m ) ( 4 8 1 m m ) 3 3 4 / 4 " ( 8 8 3 m m ) 1 5 17 / 2 " 1 9 / 8 " ( 44 4 m m ) ( 4 9 7 m m ) Figure 2: Dimensions of B
                    
                    Resumo do conteúdo contido na página número 7 
                    
                        A d j a c e n t W a l l Installation CLEARANCES TO COMBUSTIBLES: Use a hearth pad that extends 6 inches (15 cm) in front of the unit when installing on a combustible  floor. B a ck W al l 4 " ( 8 c m ) 4 " ( 8cm ) These dimensions are minimum clearances but it  is recommended that you ensure sufficient room  8 " ( 2 0 cm ) for servicing, routine cleaning and maintenance. Side wall to unit   8 inches (20 cm) Back wall to unit 4 inches (10 cm) Corner to unit 4 inches (10 cm) Figure 3: Bern Clearan
                    
                    Resumo do conteúdo contido na página número 8 
                    
                        Installation VENT TERMINATION REQUIREMENTS: IT IS RECOMMENDED THAT YOUR PELLET STOVE BE INSTALLED BY AN AUTHORIZED DEALER/INSTALLER.  Table 1: Use in conjunction with Figure 5 for allowable exterior vent termination locations.  Letter Minimum Clearance Description A 24 in (61 cm) Above grass, top of plants, wood, or any other combustible materials. B 48 in  (122 cm) From beside/below any door or window that may be opened. C 24 in (61 cm) From above any door or window that may be opened. D 24 in 
                    
                    Resumo do conteúdo contido na página número 9 
                    
                        Installation EXHAUST LOCATION: Base of unit to center of flue 103⁄4” (273 mm) Side of unit to center of flue 83⁄4” (222 mm)  [at center of unit] 3 10 / 4 " ( 2 73 m m ) 3 8 / 4 " ( 22 2m m ) Figure 6: Bern Inlet and Outlet Location.  CORNER THROUGH WALL INSTALLATION: 4 " ( 8 c m ) W a l l thi m bl e m anu fac tur ed b y pel l et v e nt m a nu fac tur er . 4" ( 8 c m ) Figure 7: Corner Installation.  9                                                                                                
                    
                    Resumo do conteúdo contido na página número 10 
                    
                        Installation HORIZONTAL EXHAUST THROUGH WALL INSTALLATION: Vent installation: install vent at clearances specified by the vent manufacturer. A chimney connector shall not pass through an attic or roof space, closet or similar concealed spaces,  or a floor, or ceiling. Where passage through a wall or partition of combustible construction is desired,  the installation shall conform to CAN/CSA-B365 Installation Code for Solid-Fuel-Burning Appliances and  Equipment. Only use venting of L or PL type 
                    
                    Resumo do conteúdo contido na página número 11 
                    
                        Installation 10. Install a vertical pipe, or if all requirements for direct venting are met, install vent termination. The  stainless steel cap termination manufactured by the vent manufacturer is recommended. However,  when the vent terminates several feet above ground level and there are no trees, plants, etc. within  several feet, a 45° elbow can be used as termination. The elbow must be turned down to prevent  rain from entering.  NOTE: • Some horizontal through wall installations may requir
                    
                    Resumo do conteúdo contido na página número 12 
                    
                        Installation INSIDE VERTICAL INSTALLATIONS: 1. Choose a stove location that is ideal.   � � � � � � � � � � � � � � � � � � � See the section “DECIDING WHERE TO � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � LOCATE YOUR PELLET APPLIANCE.”  � � � � � � � 2. Place a non-combustible hearth pad  � � � � � � � � � � � � where necessary. � � � � � � � � � � 3. Place the unit on the hearth pad (if  � � � � � � � � � � � � installed on a carpeted surface) and  � � � 
                    
                    Resumo do conteúdo contido na página número 13 
                    
                        Installation R a i n c a p F l a s h i n g 2 4 " ( 6 1 c m ) 3 " ( 7.5 c m ) C l ear a n ce 4 " ( 1 0 c m ) S u p por t b r a c k et T e e w i t h c l e a n o u t � � � � � � � � � � � � � � � � � � � � � � � � � � � T y pe " L" v e nt � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � Figure 13: Outside Vertical Installation.  HEARTH MOUNT INSTALLATION: � � � � � � � � � � � � � � � � � � � � � � � � � � � Refer to Figures 14 and 15. � � � � � � � � � � � � � � � � � 1. Ins
                    
                    Resumo do conteúdo contido na página número 14 
                    
                        Installation R a i n c a p S tor m co l l ar S e al pl a te ( c o ver pl at e ) E xi sti n g m a s o n r y fl u e V e n t p i p e ( si ngl e w a l l s t ai nl e s s f l ex p i p e or s ol i d P L vent ) F l e xi b l e v ent con n ecto r ( u se thi s 5 foot [ 1 5 2 c m ] s e c ti on o f pi p e to v en t past f i r e pl a c e dam per or sm al l sh el f) F i r ep l a ce d a m p e r l oc a ti o n C l e a n ou t t ee E x i st i ng fi r epl ace Figure 15: Freestanding hearth mount installation overvie
                    
                    Resumo do conteúdo contido na página número 15 
                    
                        Installation EXTERIOR MOUNTED EXHAUST BLOWER: The Bern can be equipped with an externally mounted exhaust blower.  This optional kit includes all  components necessary to install the exhaust blower on any vertical wall surface. Choose a location for your stove that meets the requirements  stated in your manual and allows installation with the least  amount of interference with house framing, plumbing,  wiring, etc. Included in the Exterior Mounted Exhaust Blower Kit are: 1 - Exhaust blower housi
                    
                    Resumo do conteúdo contido na página número 16 
                    
                        Installation TYPICAL THROUGH WALL WITH EXTERIOR BLOWER KIT INSTALLATION - HORIZONTAL TERMINATION: B e r n 90 ° E l bow 45 ° E l b o w w i t h R od e nt scr e e n o r st a i nl e ss ste el t er m i na t i on h o od 2f t ( 6 10m m ) R i se r P i p e A d ap to r E xter i o r B l ow e r a nd H o usi n g E l e c t r i c a l C ab l e Figure 19: Through Wall Installation with Exterior Blower Kit.  NOTE: Ensure that all interior vent connections are sealed by placing a small bead of high temperature sil
                    
                    Resumo do conteúdo contido na página número 17 
                    
                        Installation TYPICAL THROUGH WALL WITH EXTERIOR BLOWER KIT INSTALLATION - VERTICAL TERMINATION: Follow the previous pages for through wall installations. Ensure that vent pipe is properly secured to wall  using wall straps. Maintain clearances to combustibles on vent pipe as well as unit. R oo f S he at hi n g R ai n C ap R oo f F l a sh i ng R o of R a f ter s C e i l i n g Jo i s t s B er n V e nt P i p e E x t e r i o r W al l S hea th i ng O u t s i de V e n t T e r m i na ti o n Figure 21: 
                    
                    Resumo do conteúdo contido na página número 18 
                    
                        Installation THERMOSTAT INSTALLATION: This control board can be placed into two  A) HI / LOW: different modes: When the jumper J9 is  When the jumper is placed  not jumped then the control board is in a  on only one of the J9 pins,  HI / LOW mode operation. If the control  then the control board is in a  board is placed with J9 jumped then the  HI / LOW mode of thermostat  operation (factory setting).     control board is in a ON / OFF mode of  operation. In the ON /OFF thermostat  mode, the uni
                    
                    Resumo do conteúdo contido na página número 19 
                    
                        Installation SLIDER/DAMPER SET-UP: This is used to regulate the airflow through the pellet stove. The slider damper should be set by a trained  technician using magnehelic. The slider damper is located behind the  left side panel. To open the left side  panel, undo the one screw located in  the upper front corner of the cabinet  side between the louvers. Also loosen  three screws down the back of the side  A i r In take panel. B o x S l i der The combustion exhaust blower is a  D am p e r variab
                    
                    Resumo do conteúdo contido na página número 20 
                    
                        Installation OPTIONAL PANEL KIT: This kit must be installed before the unit is started.  Tools Required:  ●T-20 screwdriver Kit Components: Quantity Description 1 Left Cab Panel 1 Right Cab Panel 1 Hopper Lid 20 #8 T-20 screws (3⁄8” long) 2 Hopper Bracket Figure 27: Screws above door top corner. 2 Bushing 1⁄4” O.D. x 1⁄8” long Please ensure that all components are supplied with this kit.  If components are missing or have been damaged, contact  your dealer, distributor or courier company before