Resumo do conteúdo contido na página número 1
3E132 thru 3E134, 3E460 thru 3E462,
Installation, Operation, Maintenance and Parts Manual
5VD57 thru 5VD66, 3VH34 thru 3VH37
Please read and save these instructions. This heater must be installed and serviced by trained gas installation and service
personnel only! Read carefully before attempting to assemble, install, operate or maintain the product described. Protect
yourself and others by observing all safety information. Failure to comply with instructions
Resumo do conteúdo contido na página número 2
3E132 thru 3E134, 3E460 thru 3E462, Dayton Installation, Operation, Maintenance and Parts Manual 5VD57 thru 5VD66, 3VH34 thru 3VH37 ® Dayton High Intensity Heaters 1.0 Safety. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3 Safety Symbols . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3 Applications . . . . . . . . . . . . . . . . . . . . .
Resumo do conteúdo contido na página número 3
! Dayton Installation, Operation, Maintenance and Parts Manual Models 3E132 thru 3E134, 3E460 thru 3E462, 5VD57 thru 5VD66, 3VH34 thru 3VH37 1.0 Safety ! WARNING Improper installation, adjustment, alteration, service or maintenance can cause property damage, E serious injury or death. Read and understand, the installation, operating and maintenance N instructions thoroughly before installing or servicing this equipment. Only trained, qualifi
Resumo do conteúdo contido na página número 4
! 3E132 thru 3E134, 3E460 thru 3E462, Dayton Installation, Operation, Maintenance and Parts Manual 5VD57 thru 5VD66, 3VH34 thru 3VH37 ® Dayton High Intensity Heaters Clearance to Combustibles ! WARNING ! CAUTION Signs shall be posted specifying the Improperly connected gas lines may result maximum permissible stacking height in in serious injury and death, explosion, E order to maintain clearances to poisonous fumes, toxic gases, N combustibles. asphyxiation. Connect gas lines in G accor
Resumo do conteúdo contido na página número 5
Dayton Installation, Operation, Maintenance and Parts Manual Models 3E132 thru 3E134, 3E460 thru 3E462, 5VD57 thru 5VD66, 3VH34 thru 3VH37 Chart 1.1 - Clearance to Combustibles in Inches (see Figure 1.1) Model No. BTU/H Gas Type Voltage Sides Back Top Below/Front 3E132 30,000 Natural 120V 30 18 28 72 3E460 30,000 Propane 120V 30 18 28 72 5VD61 30,000 Natural 24V 30 18 28 72 E 5VD62 30,000 Propane 24V 30 18 28 72 N G 3E133 60,000 Natural 120V 3
Resumo do conteúdo contido na página número 6
3E132 thru 3E134, 3E460 thru 3E462, Dayton Installation, Operation, Maintenance and Parts Manual 5VD57 thru 5VD66, 3VH34 thru 3VH37 ® Dayton High Intensity Heaters Standards, Certifications and Governmental Regulations The installation of this heater must comply with all applicable local, state and national specifications, regulations and building codes (contact the local building inspector and/or fire marshall for guidance) before installing the heater system. In the absence of local codes, t
Resumo do conteúdo contido na página número 7
Dayton Dayton Installation, Operation, Maintenance and Parts Manual Models 3E132 thru 3E134, 3E460 thru 3E462, 5VD57 thru 5VD66, 3VH34 thru 3VH37 Figure 1.2 - Heater Dimensions DIM. “C” E N G L I S H DIM. “A” DIM. “B” SIDE VIEW FRONT/REAR Chart 1.2 - Heater Dimensions HEATER WIDTH HEATER DEPTH RAYHEAD(S) WIDTH HANGING MODEL BTU/H DIM “A” DIM “B” DIM “C” WEIGHT ” ” 12 3/4 14 1/4 5” 18 lbs. 30,000 ” ” ” 60,000 19 1/8 15 1/4 11 1/2 27 lbs. ” ” 2
Resumo do conteúdo contido na página número 8
3E132 thru 3E134, 3E460 thru 3E462, Dayton Installation, Operation, Maintenance and Parts Manual 5VD57 thru 5VD66, 3VH34 thru 3VH37 ® Dayton High Intensity Heaters Safety Signs and Labels It is important to provide warnings to alert individuals to Safety warning labels must be maintained on the potential hazards and safety actions. ANSI Z83.19a and the infra-red heater. Illustrations of the safety labels, National Fuel Gas Code require you to post a sign “specifying and their locations, ar
Resumo do conteúdo contido na página número 9
! Dayton Installation, Operation, Maintenance and Parts Manual Models 3E132 thru 3E134, 3E460 thru 3E462, 5VD57 thru 5VD66, 3VH34 thru 3VH37 2.0 Installation ! ! CAUTION WARNING This heater cannot be used in a building with an Read and understand, the uninsulated roof or condensation problems can occur. E installation, operating and N maintenance instructions thoroughly G before installing or servicing this Factory recommended mounting he
Resumo do conteúdo contido na página número 10
3E132 thru 3E134, 3E460 thru 3E462, Dayton Installation, Operation, Maintenance and Parts Manual 5VD57 thru 5VD66, 3VH34 thru 3VH37 ® Dayton High Intensity Heaters Chart 2.1 - Recommended Mounting Heights and Distances for “Total Area” Heating Mounting Heights Dim. A Distance Distance Distance Between Between Between 30º Angle 30º Angle Heaters Heater Rows Heater Parabolic Standard BTU/H Input Reflector (ft.) Dim. B (ft.) Dim. C (ft.) and Wall (ft.) Reflector (ft.) E 30,000 12-14 12-15 8-30 1
Resumo do conteúdo contido na página número 11
Dayton Installation, Operation, Maintenance and Parts Manual Models 3E132 thru 3E134, 3E460 thru 3E462, 5VD57 thru 5VD66, 3VH34 thru 3VH37 Chart 2.2 - Recommended Mounting Heights and Distances for “Spot” Heater Location E N G L I 10’ 12’ 14’ 16’ 18’ 20’ S Cold/Drafty 10’ x 10’ 100 9’ 4’ 10’ H 30,000 Average 12’ x 12’ 144 10’ 12’ 5’ 12’ BTU/H Protected/Insul. 14’ x 14’ 196 12’ 14’ 6’ 14’ Cold/Drafty 16’ x16’ 256 12’ 14’ 6’ 16’ 60,000 Average 1
Resumo do conteúdo contido na página número 12
Dayton Dayton ! ! 3E132 thru 3E134, 3E460 thru 3E462, Dayton Installation, Operation, Maintenance and Parts Manual 5VD57 thru 5VD66, 3VH34 thru 3VH37 ® Dayton High Intensity Heaters Heater Mounting ! ! WARNING ! WARNING Failure to maintain minimum clearance Improper suspension of the infra-red to combustibles may result in fire and/ heater may result in collapse and being E or explosion, property damage, serious crushed. Always suspend from a N injury or death. Always maintain permanent p
Resumo do conteúdo contido na página número 13
Dayton Dayton Dayton Installation, Operation, Maintenance and Parts Manual Models 3E132 thru 3E134, 3E460 thru 3E462, 5VD57 thru 5VD66, 3VH34 thru 3VH37 Figure 2.4 Heater Orientation Manifold control box must be located towards the lower end of the heater (towards the floor). E N G L Spark electrode must be I in lower right corner. S H Angled at Mount Heater Level 20˚ - 35˚ from horizontal FRONT VIEW SIDE VIEW Figure 2.5 • Gas Connection
Resumo do conteúdo contido na página número 14
Dayton ! 3E132 thru 3E134, 3E460 thru 3E462, Dayton Installation, Operation, Maintenance and Parts Manual 5VD57 thru 5VD66, 3VH34 thru 3VH37 ® Dayton High Intensity Heaters Ventilation ! ! CAUTION WARNING Improper ventilaton may result in Ventilate enclosed spaces and buildings property damamge, health problems, according to national, state, provincial E carbon monoxide poisoning, injury or and local codes. Failure to provide N death. adequate ventilation may result in G equipment malfu
Resumo do conteúdo contido na página número 15
! Dayton Installation, Operation, Maintenance and Parts Manual Models 3E132 thru 3E134, 3E460 thru 3E462, 5VD57 thru 5VD66, 3VH34 thru 3VH37 Gas Supply Important! Before connecting the gas supply to the ! WARNING infra-red heater(s): • Check that the gas piping and service has the capacity to handle the load of all heaters being E installed, as well as any other gas appliances being N connected to the supply line. G Improperly connected ga
Resumo do conteúdo contido na página número 16
! 3E132 thru 3E134, 3E460 thru 3E462, Dayton Installation, Operation, Maintenance and Parts Manual 5VD57 thru 5VD66, 3VH34 thru 3VH37 ® Dayton High Intensity Heaters ! To connect the gas: This heater must be installed and serviced by trained gas ! installation and service personnel only. WARNING Failure to install, operate or service this The installation of this heater must conform with local appliance in the approved manner may building codes or, in the absence of such codes, the E resul
Resumo do conteúdo contido na página número 17
Dayton Installation, Operation, Maintenance and Parts Manual Models 3E132 thru 3E134, 3E460 thru 3E462, 5VD57 thru 5VD66, 3VH34 thru 3VH37 Electrical Control systems are initiated by either 120 VAC or ! WARNING 24 VAC. The 120 VAC systems can be used directly from a 120 VAC line. On 24 VAC systems, transformers Electric Shock Hazard. must be used to supply power of sufficient VA rating for Field wiring to the heater must be single or mul
Resumo do conteúdo contido na página número 18
3E132 thru 3E134, 3E460 thru 3E462, Dayton Installation, Operation, Maintenance and Parts Manual 5VD57 thru 5VD66, 3VH34 thru 3VH37 ® Dayton High Intensity Heaters Wiring Diagrams Figure 2.9 - 24 V Schematic (5VD57 thru 5VD66) • Direct Spark Ignition E N • VA Draw: 12 G L • Amps: .48 I • Potted Circuit S Board H (sold separately) Figure 2.10 - 120 V Schematic (3E132 thru 3E134, 3E460 thru 3E462, 3VH34 thru 3VH37) • Direct Spark Ignition • VA Draw: 12 • Amps: .10 • Potted Circuit Board
Resumo do conteúdo contido na página número 19
! Dayton Installation, Operation, Maintenance and Parts Manual Models 3E132 thru 3E134, 3E460 thru 3E462, 5VD57 thru 5VD66, 3VH34 thru 3VH37 3.0 Operation Upon satisfactory completion of the electrical supply ! WARNING and purging of the gas supply line to the heater(s), follow the lighting instructions on the heater’s rating Do not atempt to ignite heater by hand. label to put the heater into operation. Failure to comply could result in
Resumo do conteúdo contido na página número 20
! 3E132 thru 3E134, 3E460 thru 3E462, Dayton Installation, Operation, Maintenance and Parts Manual 5VD57 thru 5VD66, 3VH34 thru 3VH37 ® Dayton High Intensity Heaters 4.0 Maintenance ! WARNING It is recommended that the following become a standard yearly procedure to obtain maximum operating Use protective glasses when cleaning efficiency and trouble free operation. the heater. E During long periods of non-usage, remove or cover N heater with a polyethylene bag and shut off gas supply. G Di