Resumo do conteúdo contido na página número 1
KOBE Brand Range Hood
Model No.: CH0030SQB (30”)
CH0036SQB (36”)
CH0042SQB (42”)
CH0048SQB (48”)
CH-100 SERIES – 18” HEIGHT
INSTALLATION INSTRUCTIONS
AND OPERATION MANUAL
Resumo do conteúdo contido na página número 2
{THIS PAGE LEFT PURPOSELY BLANK}
Resumo do conteúdo contido na página número 3
- READ AND SAVE THESE INSTRUCTIONS - CONTENTS IMPORTANT SAFETY INSTRUCTIONS.................................................................................... 1 COMPONENTS OF PACKAGE ................................................................................................. 3 INSTALLATION ......................................................................................................................... 4 UNDER THE CABINET INSTALLATION ..............................
Resumo do conteúdo contido na página número 4
IMPORTANT SAFETY INSTRUCTIONS - PLEASE READ THIS SECTION CAREFULLY BEFORE INSTALLATION - WARNING: TO REDUCE THE RISK OF FIRE, ELECTRIC SHOCK OR PERSONAL INJURY, OBSERVE THE FOLLOWING: 1) Installation and electrical wiring must be done by qualified professionals and in accordance with all applicable codes and standards, including fire-rated construction. 2) When cutting or drilling into wall or ceiling, be careful not to damage electrical wiring or other hidden utilities. 3) Duc
Resumo do conteúdo contido na página número 5
What to Do In The Event Of a Range Top Grease Fire • SMOTHER FLAMES with a close fitting lid, cookie sheet, or metal tray, and then turn off the burner. KEEP FLAMMABLE OR COMBUSTIBLE MATERIAL AWAY FROM FLAMES. If the flames do not go out immediately, EVACUATE THE AREA AND CALL THE FIRE DEPARTMENT or 911. • NEVER PICK UP A BURNING PAN – You May Get Burned. • DO NOT USE WATER, including wet dishcloths or towels – a violent steam blast will result. • Use an extinguisher ONLY if: a) You h
Resumo do conteúdo contido na página número 6
COMPONENTS OF PACKAGE (Must keep all material for returns or refunds) RANGE HOOD BOX KOBE Range Hood – 1 Warranty Registration Card –1 Instructions Manual – 1 Baffle Filter - 2 (30”, 36”, 42”) - 3 (48”) Stainless Steel Spacer - 2 (30”) DUCT COVER KIT (Sold Separately) - 2 (36”) - 3 (42”) Option Of: - 2 (48”) Oil Tunnel – 1 Model No. CH0030DC-12 for 30” hood KOBE Duct Cover – 1 Ducting T
Resumo do conteúdo contido na página número 7
INSTALLATION PLEASE READ ENTIRE INSTRUCTION BEFORE PROCEEDING Calculation before Installation To calculate installation, please refer to Table 1. (All calculation in inches.) - FOR UNDER THE CABINET - TABLE 1 A = Height of Floor to Ceiling B = Height of Floor to Counter Top (Standard: 36”) C = Height of Counter Top to Hood Bottom (Recommended 27” to 30”) [(A – B) – (D + E)] D = Height of Hood E = Height of the Cabinet - FOR WALL MOUNT (WITH OPTIONAL DUCT
Resumo do conteúdo contido na página número 8
SAFETY WARNING HOOD MAY HAVE VERY SHARP EDGES; PLEASE WEAR PROTECTIVE GLOVES IF REMOVING ANY PARTS FOR INSTALLING, CLEANING OR SERVICING. NOTE: USING ELECTRICAL SCREWDRIVERS MAY CAUSE DAMAGE TO THE HOOD. Installation Table of Contents UNDER THE CABINET INSTALLATION................................................................................6 Preparation Before Installation................................................................................................6 Hood Inst
Resumo do conteúdo contido na página número 9
UNDER THE CABINET INSTALLATION Preparation Before Installation NOTE: TO AVOID DAMAGE TO YOUR HOOD, PREVENT DEBRIS FROM ENTERING THE VENT OPENING. • Decide the location of the venting pipe from the hood to the outside. Refer to Figure 1. • A straight, short vent run will allow the hood to perform more efficiently. • Try to avoid as many transitions, elbows, and long run as possible. This may reduce the performance Figure 1 of the hood. • Temporari
Resumo do conteúdo contido na página número 10
Ductwork Installation 8. Use 8” round steel pipe (follow building codes in your area) to connect the ducting transition on the hood to the ductwork above. Use duct tape to make all joints secure and air tight. Refer to Figure 5. Wiring to Power Supply S AF E T Y W AR N I N G RISK OF ELECTRICAL SHOCK. THIS RANGE HOOD Figure 5 MUST BE PROPERLY GROUNDED. MAKE SURE THIS IS DONE BY QUALIFIED ELECTRICIAN IN ACCORDANCE WITH ALL APPLICABLE NATIONAL
Resumo do conteúdo contido na página número 11
14. Turn power ON in control panel. Check all lights and fan operation. 15. Make sure to leave this manual for the homeowner Figure 8 8
Resumo do conteúdo contido na página número 12
WALL MOUNT INSTALLATION ***Follow these installations only if installing with an optional duct cover: Preparation Before Installation NOTE: TO AVOID DAMAGE TO YOUR HOOD, PREVENT DEBRIS FROM ENTERING THE VENT OPENING. • Decide the location of the venting pipe from the hood to the outside. Refer to Figure 9. • A straight, short vent run will allow the hood to perform more efficiently. • Try to avoid as many transitions, elbows, and long
Resumo do conteúdo contido na página número 13
mark the leveling point of the hood. Position two mounting screws (not included) on the wall, leaving 1/8” away from the wall. Refer to Figure 13 WALL 2. Align hood-mounting bracket to the two screws on the wall and hook hood into place. Tighten screws to secure hood to the wall. 3. For safety purpose, pre-drilled mounting holes are provided through the back of the hood. For a more secure installation, use as many mounting holes as needed to secure from the inside of hood (screws
Resumo do conteúdo contido na página número 14
Duct Cover Installation 5. Use 8” round steel pipe (follow building codes in your area) to connect the ducting transition on the hood to the ductwork above. Use duct tape to make all joints secure and air tight. Refer Figure 15. Slide the duct cover onto the hood. 6. Use 3/16” x 3/8” screws (included) to attach duct cover to hood. Figure 15 Final Assembly CAUTION: Install heating lamps last. 7. Drop oil tunnel into recess
Resumo do conteúdo contido na página número 15
OPERATING INSTRUCTIONS This KOBE hood is equipped with four electronic controls with a 10-second standby startup & 30- second delay shutoff, powerful centrifugal squirrel cage with baffle filters, bright 12-volt 20-watt halogen lights, and heating lamp sockets (lamps not included). The four electronic controls are Light Control, Speed Control A, Speed Control B and the Power Control (On/Off). Refer to Figure 18.
Resumo do conteúdo contido na página número 16
MAINTENANCE SAFETY WARNING NEVER PUT YOUR HAND INTO AREA HOUSING THE FAN WHILE THE FAN IS OPERATING. For optimal operation, clean range hood and all baffle/spacer/filter/oil tunnel/oil container regularly. To Clean Hood Surface CAUTION: NEVER USE ABRASIVE CLEANERS, PADS, OR CLOTHS. *** Regular care will help preserve the appearance of the hood. 1. Use only mild soap or detergent solutions. Dry surfaces using soft cloth. 2. If hood looks splotchy (stainless steel hood
Resumo do conteúdo contido na página número 17
To Replace Light Bulb CAUTION: HALOGEN LIGHT UNIT MAY BE HOT! WAIT UNTIL UNIT IS COOL. 1. Make sure all controls are off, and range hood is unplugged. 2. Place a flat-head screwdriver between light cover and housing to remove cover . 3. Gently pull defective bulb straight out and discard. Light bulbs should be 12
Resumo do conteúdo contido na página número 18
SPECIFICATIONS MODEL / SIZE CH0030SQB / 30“ CH0036SQB / 36“ CH0042SQB / 42“ CH0048SQB / 48“ COLOR #304 Commercial Grade Stainless Steel CONSUMPTION / AMPERE 900W / 8A VOLTAGE 120V 60Hz NUMBER OF MOTORS 1 DESIGN 18 Gauge Seamless / Satin Finish FAN TYPE: CENTRIFUGAL Squirrel Cage EXHAUST Top Transition Rectangular to 8” Round x 1 CONTROLS Electronic Control (4 Buttons) – 10-Second Standby Startup 30-Minute Delay Shutoff HALOGEN LIGHTS 30” / 36” - 12V20W x 2 42”
Resumo do conteúdo contido na página número 19
MEASUREMENTS & DIAGRAMS All ( ) are in millimeter. All inch measurements are converted from millimeters. Inch measurements are estimated. - FOR UNDER THE CABINET - MODEL NO: CH0030SQB CH0036SQB CH0042SQB CH0048SQB 16
Resumo do conteúdo contido na página número 20
- FOR UNDER THE CABINET – (Cont.) 17