Resumo do conteúdo contido na página número 1
SHERWOOD INDUSTRIES IS AN ENVIRONMENTALLY RESPONSIBLE COMPANY
THIS MANUAL IS PRINTED ON RECYCLED PAPER
EG 33 Direct Vent
ZERO CLEARANCE
By SHERWOOD INDUSTRIES LTD.
OWNERS MANUAL
This appliance may be installed in
an after market permanently located
manufactured (mobile) home, where
not prohibited by local codes.
This appliance is only for use with
the type of gas indicated on the
rating plate. This appliance is not
convertible for use with other
Resumo do conteúdo contido na página número 2
SAFETY PRECAUTIONS FOR SAFE INSTALLATION AND OPERATION OF YOUR “ENVIROGAS” STOVE, PLEASE, CAREFULLY READ THE FOLLOWING INFORMATION: GENERAL • To prevent injuries do not allow anyone who is Installation and repair should be done by a qualified unfamiliar with the operation to use the stove. service person. The appliance should be inspected before use and at least annually by a qualified • Always keep the appliance area clear and free service person. More frequent cleaning may be o
Resumo do conteúdo contido na página número 3
TABLE OF CONTENTS Safety Precautions 2 Code Approvals 3 Assembly Instruction 3 Deciding where to locate your stove 4 Mobile Home Information 4 Installation 5-6 Mantle and Vent restrictions 7 Flue Collar Installation and Vent terminal clearances 8 Planning your installation 9-13 Installation of Log Sets and Embers 14 Operating Instructions 15 Maintenance and Technical 16 Trouble Shooting 17 Gas Line Connection 18 Electrical 19 Fuel Conversion 20 Warranty 21 Installation Data S
Resumo do conteúdo contido na página número 4
DECIDING WHERE TO LOCATE YOUR STOVE DIMENSIONS: Front Width: 36 5/8”/ 93 cm Rear Width: 36 5/8”/ 93 cm Height: 32 1/4”/ 82 cm Depth 13 11/16”/ 34.77 cm Shipping Weight: 132 lbs/59.9 kg CLEARANCES: A. Side wall to stove 2”/ 5 cm B. Rear wall to stove 1”/ 2.5 cm C. Floor to stove 0”/ 0 cm D. Corner clearance 1”/ 2.5 cm Maintain sufficient clearances for service and maintenance • The stove should be located out of traffic and away from fur
Resumo do conteúdo contido na página número 5
INSTALLATION: THIS UNIT HAS BEEN DESIGNED TO BE INSTALLED IN MANY LOCATIONS. BECAUSE THIS UNIT IS A ZERO CLEARANCE FIREPLACE IT MAY BE INSTALLED IN A WOOD FRAMED COMBUSTIBLE CHASE, AS SHOWN. FRAMING DIMENSIONS: WIDTH: 35 3/8” (89.85 CM) HEIGHT: 31 3/4” (80.65 CM) (INCLUDING FINISHED HEARTH HEIGHT) DEPTH: 13 3/4” (34.93 CM) NOTE: When preparing framing for this unit insure that the framing on the outside wall or ceiling will not interfere with the vent pipe. Framing must
Resumo do conteúdo contido na página número 6
Place the unit into the framed opening. Nail or screw the unit to the framing using the nailing flanges provided. MAKE SURE THAT THE UNIT IS LEVEL AND PLUMB BEFORE NAILING OR SCREWING TO THE FRAMING MEMBERS. ALSO INSURE THAT THE BOTTOM OF THE UNIT IS LEVEL WITH THE FINISHED HEARTH HEIGHT. Once the unit has been secured, install all venting according to local codes and guidelines and restrictions applied in this manual. Install gas line from either the right or left side of the unit. Gas
Resumo do conteúdo contido na página número 7
REQUIRED MANTLE CLEARANCES MAKE SURE THAT THE MANTLE INSTALLATION STAYS WITHIN THE SHADED AREA IN THE DIAGRAM PROVIDED. THE MAXIMUM ALLOWABLE MANTLE WIDTH IS 10” (25.4 CM) THE MINIMUM HEIGHT FROM THE TOP OF THE SURROUND PANEL TO A 10” (25.4 CM) WIDE MANTLE IS 11” (27.94 CM) VENT RESTRICTIONS: THIS SECTION IS DESIGNED TO SHOW THE MINIMUM AND MAXIMUM VENT LENGTHS FOR BOTH HORIZONTAL AND VERTICAL INSTALLATIONS WHEN VENTING THIS APPLIANCE YOU MUST STAY
Resumo do conteúdo contido na página número 8
FLUE COLLAR INSTALLATION THIS UNIT CAN BE VENTED THREE DIFFERENT WAYS: ( HORIZONTAL, VERTICAL/HORIZONTAL OR VERTICALLY) The flue collar has been installed on the rear of the appliance at the factory. It can used in this location or the flue collar can be installed on the top of the firebox for vertical installations. 1. Remove the 6 5/8” outer flue collar taking extra special care not damage the ceramic fiber gasketing material that has been glued to this component. 2. Remove the
Resumo do conteúdo contido na página número 9
These models have been tested and certified for use with SIMPSON DURAVENT DIRECT VENT TYPE “GS” PIPE FOR GAS STOVES. Kits are available for vertical venting or horizontal venting. It is recommended that a bead of RTV High Temperature Silicone be applied to each outer vent joint and MILPAC to each inner joint before installation. BEFORE BEGINNING THE INSTALLATION TAKE CARE TO ENSURE AN APPROPRIATE OUTSIDE LOCATION FOR THE VENT TERMINATION CAN BE ACCOMMODATED. FOLLOW THE VENT LENGTH DIAGR
Resumo do conteúdo contido na página número 10
When planning your installation, it will be necessary to select the proper length of vent pipe for your particular requirements. It is important to note when passing through a wall, the maximum allowable wall thickness is 10-inches (254 mm), 1 1/2” inches clearance to combustibles must be maintained. Select the amount of vertical rise desired for “vertical-to-horizontal” type installations. To determine the length of vent pipe required for vertical installations, measure the distance from the
Resumo do conteúdo contido na página número 11
FIG-11 FIG-12 FIG-13 FIG-14 NOTES: (1) The four wood screws provided should be replaced with the appropriate fasteners for stucco, brick, concrete, or other types of siding. (2) For buildings with vinyl siding, a vinyl siding standoff (950), should be installed between the vent cap and the exterior wall FIG-12. Attach the vinyl siding standoff to the horizontal termination. The vinyl siding standoff prevents excessive heat from possibly melting the vinyl siding mat
Resumo do conteúdo contido na página número 12
VERTICAL INSTALLATION STEP 1. Check the instructions for required clearances (air spaces) to combustibles when passing through ceilings, walls, roofs, enclosures, attic rafters , or other nearby combustible surfaces. Do not pack air spaces with insulation. STEP 2. Set the gas appliance in the desired location. Drop a plumb bob down from the ceiling to the position of the appliance flue exit, and mark the location where the vent will penetrate the ceiling. Drill a small hole at this poi
Resumo do conteúdo contido na página número 13
NOTES: (1) If an offset is necessary in the attic to avoid obstructions, it is important to support the vent pipe every 3 feet, to avoid excessive stress on the elbows, and possible separation. Wall straps are available for this purpose. FIG-18 (2) When ever possible, use 45° degree elbows instead of 90° degree elbows. The 45° degree elbow offers less restriction to the flow of flue gases and intake air. NOTES: (1) For multi story installations. A ceiling firestop (part 963) is requir
Resumo do conteúdo contido na página número 14
INSTALLATION OF LOGSET and EMBERS INSTALLING THE GLOWING EMBERS and LOGSET REMOVING AND INSTALLING THE BRICK PANELS Open the door. Remove the log set. A bag of ceramic fiber embers is provided for use on the front burner ember tray. STEEL PANEL: Undo the two screws located in the top two corners of the firebox. Tilt forward at top corners and pull out. Installation is the reverse. CAUTION: Use only the type of ember material supplied with this appliance. Due to the irregular siz
Resumo do conteúdo contido na página número 15
OPERATING INSTRUCTIONS FOR YOUR SAFETY READ BEFORE OPERATING WARNING: IF YOU DO NOT FOLLOW THESE INSTRUCTIONS EXACTLY, A FIRE OR EXPLOSION MAY RESULT CAUSING PROPERTY DAMAGE, PERSONAL INJURY OR LOSS OF LIFE. A) This appliance is equipped with a pilot, which must be • If you cannot reach your gas supplier, call the fire lit by hand by following these instructions exactly. department. B) BEFORE LIGHTING smell all around the appliance C) Use only your hand to push in or turn the gas con
Resumo do conteúdo contido na página número 16
ROUTINE MAINTENANCE and TECHNICAL Periodically check to ensure that your system is clean. CLEARANCES MUST BE SUFFICIENT TO ALLOW ACCESS FOR MAINTENANCE AND SERVICE Periodically check the pilot and burner. Check to see that all the burner ports are clean and clear. Check the pilot Depending upon the amount of use, cleaning should be head for blockage. Check to ensure the pilot flame is blue required no more than two or three times per season. with no yellow tips. REMOVING BURNER CO
Resumo do conteúdo contido na página número 17
TROUBLE SHOOTING Problem Possible Cause Solution Spark will not light the pilot after Defective piezo igniter Check connections to igniter repeated pressing of spark igniter -If igniter connections are good but there is no spark-replace igniter Broken spark electrode -Check for broken ceramic insulation replace, electrode if broken Miss-aligned spark electrode -If spark is not arcing from the electrode to pilot- adjust by loosening screws on pilot base. Adjust and re- tighten Pilo
Resumo do conteúdo contido na página número 18
GAS LINE CONNECTION WARNING: Only persons licensed to work with gas piping may make the necessary gas connections to this appliance. GAS LINE CONNECTION • This stove is equipped with a 3/8” female NPT thread located on the right hand side of the gas valve. Consult your local authorities codes or the CAN/CGA B 149 (1 or 2) installation code in Canada, or in the USA gas installations follow either local codes or the current edition of the National Fuel Gas Code ANSI Z223.1. • The efficie
Resumo do conteúdo contido na página número 19
ELECTRICAL The ENVIROGAS EG 22.Z/CLEARANCE .DV. will operate with no external power supply. These models have a Millivolt gas control which uses the pilot flame to generate enough electricity to operate the main burner. The appliance when installed, must be electrically connected and grounded in accordance with local codes or in the absence of local codes, with the current CSA C22.1 CANADIAN ELECTRICAL CODE. Part 1, SAFETY STANDARDS FOR ELECTRICAL INSTALLATIONS, or THE NATIONAL ELECTRICAL
Resumo do conteúdo contido na página número 20
FUEL CONVERSION “Warning” This conversion kit shall be installed by a qualified service technician in accordance with the manufacturer’s instructions and all applicable codes and requirements of the authority having jurisdiction. If the information in these instructions is not followed exactly, a fire, explosion or CO poisoning may result. The qualified service agency is responsible for the proper installation of this kit. The installation is not proper or complete until the operation o