Resumo do conteúdo contido na página número 1
Read this
Quick Install
Guide
first…
Inserting System
Welcome
IMPORTANT - READ THIS FIRST
Follow the steps in
this booklet to install
before plugging in your system
your DI200
OfficeRight™.
IMPORTANT: If you
purchased the
optional second
sheet feeder, unpack
and position it on
the desktop
BEFORE you follow
these instructions.
Resumo do conteúdo contido na página número 2
step 1. Unpack a. Lift out the accessories and put them safely to one side b. Remove cardboard and foam packing Check that you have the following accessories: Sample paper and envelopes (test material) ® Bottle of E-Z Seal Power Cord
Resumo do conteúdo contido na página número 3
step 2. Locate a. Lift the machine by its handles and place onto the desk. See “SAFETY NOTICE!” below b. If you have the optional 2nd Sheet Feeder, position the machine onto the feeder now SAFETY NOTICE! • Lift the machine only by its lifting handles. • Lift correctly (bend knees and keep back straight). • The machine weighs about 38 lb. (17.5kg) We strongly recommend you get help to lift it.
Resumo do conteúdo contido na página número 4
step 3. Connect and turn on a. Connect power cord b. Turn machine ON. The power switch is on the back panel next to the power cord as shown here c. Display will show “READY” in a few seconds SAFETY NOTICE! • Locate the machine close to a power socket. • Use the power cord supplied. • See the DI200 OfficeRight™ Operating Guide for complete safety and connection information.
Resumo do conteúdo contido na página número 5
step 4. Fill moistener a. Slide moistener open ® b. Fill with E-Z Seal . Use the entire bottle supplied c. Slide moistener closed The moistener takes about five minutes to become fully wet and ready for use. Continue with the steps in this booklet in the meantime.
Resumo do conteúdo contido na página número 6
step 5. Load envelopes We’ve included test paper and envelopes so you can practice using the machine and check that it’s working OK… a. Fan envelopes and tap stack to align edges b. Place envelopes in feeder B c. Slide side guides until they just touch envelopes. If guides are too tight, envelopes may stall; if they are too loose, envelopes may skew Use test envelopes marked with the letter B. IMPORTANT: Always fan (aerate) envelopes before loading. Load envelopes RIGHT WAY UP and FACING YOU. S
Resumo do conteúdo contido na página número 7
step 6. Load sheets a. Fan sheets and tap stack to align edges b. Place sheets in feeder A1, FACE DOWN and BOTTOM EDGE FIRST c. Push backstop in until it just touches the stack of sheets Use test sheets marked with A1. Use Sheet Feeder A1 for sheets that need folding. IMPORTANT: Always fan (aerate) sheets before loading. Always load sheets FACE DOWN and BOTTOM EDGE FIRST.
Resumo do conteúdo contido na página número 8
step 7. Setup a. Repeatedly press button Menu / Enter no yes until only Feeder A1 lights green Feeder A2 Feeder A1 2nd Page b. Repeatedly press button until only c. Repeatedly Envelope Fdr B Envelope press button Insert Fdr C Seal Fold Only No Seal Fdr B lights until Seal green lights green Start Trial Piece Stop A green indicator shows that a feeder or function is selected. Repeatedly pressing the selection buttons (a, b and c above) steps through the feeders and options available on y
Resumo do conteúdo contido na página número 9
step 8. Run test job Menu / Enter no yes Feeder A2 Feeder A1 2nd Page Envelope Fdr B Insert Fdr C Seal Fold Only No Seal a. Press c. Press Stop Start Trial Piece Stop Trial Piece to stop button processing b. If Trial Piece is OK, press Start The trial piece will not be sealed so you can check the contents of the envelope. This is normal. The counter will show the number of items processed.
Resumo do conteúdo contido na página número 10
step 9. Congratulations! Your DI200 OfficeRight™ is now ready to use You’ll find your Oper- ating Guide here. Be sure to read it to get the most out of your DI200 OfficeRight™. This Quick Install Guide allows you to unpack and test the machine in the shortest possible time. The Operating Guide fully explains how to use your new system. It’s located in a slot in the top right hand cover of the machine as shown above.
Resumo do conteúdo contido na página número 11
Problems? Always Check Your Operating Guide First If you experience any problems installing your equipment, please refer to the Troubleshooting section in the Operating Guide furnished with your machine. Web Support You’ll find helpful answers to frequently asked questions at our web site. Please go to www.pitneybowes.com/support Phone Support If problems continue, technical assistance is readily available from the Pitney Bowes Customer Support Center. Before you call, please have the fol
Resumo do conteúdo contido na página número 12
One Elmcroft Road Stamford, Connecticut 06926-0700 www.pitneybowes.com Pitney Bowes Canada 2200 Yonge Street Suite 100 Toronto, Ontario M4S 3E1 1.800.672.6937 IMPORTANT - READ THIS FIRST before plugging in your system SV40189-QS Rev. A 9/02 © 2002 Pitney Bowes Inc. Printed in England *SV40189-QSREVA*