Resumo do conteúdo contido na página número 1
InfraStruXure™
Installation and Start-Up
Large Data Centers
415 and 200V Input
Resumo do conteúdo contido na página número 2
This manual is available in English on the enclosed CD.
Resumo do conteúdo contido na página número 3
About this Manual This manual is intended for APC Field Service Engineers or APC-trained installers of an InfraStruXure system for large data centers. It covers basic installation and start-up. For information about installing specific components in your InfraStruXure system, see the documentation included with each component. Before installing or operating any component, refer to the safety instructions in the component’s manual. The illustrations of products in this manual may vary slightly
Resumo do conteúdo contido na página número 4
Resumo do conteúdo contido na página número 5
Contents Safety ......................................................................1 Overview . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1 Save these instructions . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1 Safety symbols used in this manual . . . . . . . . . . . . . . . . . . . 1 Cross-reference symbols used in this manual . . . . . . . . . . . . . 1 Warnings . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Resumo do conteúdo contido na página número 6
Ensure Total Power Off . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12 Connect the Power Source to the PDU . . . . . . . . . . . . . . . . . . . 13 Access the PDU Main Input switch . . . . . . . . . . . . . . . . . . . 13 Attach conduit to the PDU for the input conductors . . . . . . . 13 Install a circuit breaker . . . . . . . . . . . . . . . . . . . . . . . . . . . 15 Route the input conductors to the main input circuit switch . 15 Torque specifications and tools required . . .
Resumo do conteúdo contido na página número 7
Configuration.........................................................33 Configure the InfraStruXure Manager . . . . . . . . . . . . . . . . . . . 33 Appendix A—System Operation .............................35 How to Apply Power to the System . . . . . . . . . . . . . . . . . . . . . 35 How to Ensure Total Power Off . . . . . . . . . . . . . . . . . . . . . . . . 36 InfraStruXure Site Planning, Installation, Start-Up v
Resumo do conteúdo contido na página número 8
Resumo do conteúdo contido na página número 9
Safety Overview Save these instructions This manual contains important instructions that must be followed during installation, operation, and maintenance of the InfraStruXure System. Safety symbols used in this manual Indicates an electrical hazard, which, if not avoided, could result in injury or death. Indicates a hazard, which, if not avoided, could result in personal injury or damage to product or other property. Indicates a potential hazard which could result in damage to product or othe
Resumo do conteúdo contido na página número 10
Warnings Installation/Maintenance Only a certified electrician can do following: • Connect the PDU to its power source • Install a customer-specified, hard-wired power cable Only a certified electrician or an APC Field Service Engineer can perform maintenance of the PDU. When connecting the PDU to utility, a circuit breaker must be installed to protect the PDU against short-circuit current. Determine the type of circuit breaker that you need to install: Input Voltage Circuit Breaker Size 200V
Resumo do conteúdo contido na página número 11
Site Preparation Dimensions InfraStruXure PDU Shielding Partitions 120mm With trough: 2243mm 580mm Shielding Trough Without trough: 2058mm 185mm 580mm 597mm 871mm NetShelter VX Seismic Enclosure Base Enclosure Shielding Partitions 120mm 580mm Shielding Trough 2070mm 185mm 580mm 1072mm 597mm InfraStruXure Site Planning, Installation, Start-Up 3
Resumo do conteúdo contido na página número 12
Site Preparation: Dimensions NetShelter VX Enclosure Base Enclosure 597mm Shielding Partitions 597mm 122mm 2070mm Shielding Trough 183mm 597mm 1071.9mm 4 InfraStruXure Site Planning, Installation, Start-Up
Resumo do conteúdo contido na página número 13
Space Considerations Study the figures below to determine your space requirements for installing the InfraStruXure PDU, Symmetra PX UPS, and XR Battery Enclosure. Consult your local and national codes for additional requirements. >300mm 300 Ceiling Clearance >600mm Rear Clearance >1000mm Front Clearance InfraStruXure Site Planning, Installation, Start-Up 5
Resumo do conteúdo contido na página número 14
Weight Considerations Use the “Maximum Packaged” weights to determine what methods you will use to move equipment into your data center. Use the “Maximum Unpacked” weights to ensure that the floor and subfloor can support the total weight of the configuration. If you are placing equipment on a raised floor, consult the flooring manufacturer for loading requirements before installing equipment. For assistance in planning your configuration, call APC Customer Support in Japan at the number lis
Resumo do conteúdo contido na página número 15
Heat Output Consider the heat dissipation ratings of equipment to determine cooling requirements. Additional cooling equipment may be required. Heat output of the InfraStruXure PDU is shown below. InfraStruXure PDU Heat Output 200V input 3496 BTU/hr (1.025kW) 415V input 3746 BTU/hr (1.098kW) InfraStruXure Site Planning, Installation, Start-Up 7
Resumo do conteúdo contido na página número 16
Electrical Requirements and Specifications Procedures requiring a licensed electrician A licensed electrician must connect utility power. The following procedures require a licensed electrician: • connection of utility conductors • installation of a 200- or 100-amp circuit breaker • connection to the main input switch • connection to a branch circuit To connect utility power, see the utility connection instructions included with your documentation. See also Electrical requirements 200V Input 4
Resumo do conteúdo contido na página número 17
Basic Installation Procedure This section provides the basic steps that you need to perform when installing InfraStruXure power and rack components. Follow the references provided with each step for detailed instructions. Do not begin installing your InfraStruXure system without an APC Field Service Engineer present. 1. Unpack the components according to the unpacking instructions included on the outside of the packaging or in the installation manual included with the component. Make sure tha
Resumo do conteúdo contido na página número 18
Site Preparation: Basic Installation Procedure 6. Connect the power source to the PDU. A licensed electrician must connect the power source. See page 13 for detailed instructions. 7. Connect user contact inputs and output relays to the user connection plate. See page 17 for detailed instructions. 8. Install Shielding Troughs, Shielding Partitions, and Cable Ladders. For instructions, see the manuals included with your Shielding Troughs, Shielding Partitions, and Cable Ladders. See also 9. Insta
Resumo do conteúdo contido na página número 19
Installation Procedures Join Adjacent Enclosures and Bolt Enclosures to the Floor Join adjacent enclosures To join NetShelter VX Enclosures, see the installation manual included with your enclosures. See also Bolt Enclosures to the Floor Proper anchoring hardware must be in place before starting this procedure. To bolt the PDU and enclosures to the floor, follow these steps for each enclosure: 1. Remove the front and rear skirts on the enclosure. 2. Insert two bolts through each plate and the
Resumo do conteúdo contido na página número 20
Ensure Total Power Off 1. Set the main input switch on the PDU to OFF. 2. Open (turn OFF) the main output circuit breaker on the PDU. 3. Set the power source circuit breaker to OFF. 12 InfraStruXure Site Planning, Installation, Start-Up