Resumo do conteúdo contido na página número 1
You can rely on
Installation & Service Instructions Gold HE A
Range
Condensing
Combination Boiler
These instructions include the Benchmark Commissioning
Checklist and should be left with the user for safe keeping.
© Baxi Heating UK Ltd 2008
Resumo do conteúdo contido na página número 2
Natural Gas Building Regulations and the Benchmark Commissioning Checklist Potterton Gold Combi 24 HE A o G.C.N 47 393 18 Building Regulations (England & Wales) require notification of Potterton Gold Combi 28 HE A o the installation of a heating appliance to the relevant Local G.C.N 47 393 19 Potterton Gold Combi 33 HE A Authority Building Control Department. From 1 April 2005 this o G.C.N 47 393 20 can be achieved via a Competent Persons Self Certification Scheme as an option to notifying the
Resumo do conteúdo contido na página número 3
Installer Notification Guidelines Choose Building Regulations Notification Route Competent Person's Building Control Self Certification Scheme Contact your relevant Local Install and Commission this Authority Building Control appliance to manufacturer's (LABC) who will arrange instructions an inspection or contact a government approved inspector Complete the Benchmark Checklist If you notify via CORGI Scheme, CORGI will then notify the relevant Local Authority Install and Commission this Buildin
Resumo do conteúdo contido na página número 4
Legislation IMPORTANT - Installation, Commissioning, Service & Repair This company declare that no substances harmful to health are contained in the appliance or used during appliance This appliance must be installed in accordance with the manufacturer’s instructions and manufacture. the regulations in force. Read the instructions fully before installing or using the appliance. The appliance is suitable only for installation in GB and IE and should be installed in accordance with the rules in fo
Resumo do conteúdo contido na página número 5
Safe Manual Handling General The following advice should be adhered to, from when first handling the boiler to the final stages of installation, and also during maintenance. Most injuries as a result of inappropriate handling and lifting are to the back, but all other parts of the body are vulnerable, particularly shoulders, arms and hands. Health & Safety is the responsibility of EVERYONE. There is no ‘safe’ limit for one man - each person has different capabilities. The boiler should be handle
Resumo do conteúdo contido na página número 6
CONTENTS Section Page 1.0 Introduction 7 2.0 General Layout 8 3.0 Appliance Operation 9 4.0 Technical Data 10 5.0 Dimensions and Fixings 11 6.0 System Details 12 7.0 Site Requirements 15 8.0 Flue Options 19 9.0 Plume Displacement 24 10.0 Installation 28 11.0 Commissioning 34 12.0 Completion 37 13.0 Servicing 38 14.0 Changing Components 40 15.0 Combustion Check 49 16.0 Electrical 50 17.0 Short Parts List 51 18.0 Fault Finding 52 Benchmark Checklist 58 6 © Baxi Heating UK Ltd 2008
Resumo do conteúdo contido na página número 7
1.0 Introduction 1.1 Description 1. The Potterton Gold Combi HE A is a fully automatic gas fired wall mounted condensing combination boiler. It is room sealed and fan assisted, and will serve central heating and Case Front Panel mains fed domestic hot water. 2. The boiler is set to give a maximum output of :- 24 models - 24 kW DHW 21 kW CH (Condensing) 28 models - 28 kW DHW 25.9 kW CH (Condensing) 33 models - 33 kW DHW 30.3 kW CH (Condensing) 3. It is designed for use on Natural Gas (G20). 4. T
Resumo do conteúdo contido na página número 8
2 3 4 5 AM 7 8 9 10 11 12 1 2.0 General Layout 2.1 Layout 23 1. Expansion Vessel 1 15 2. Automatic Air Vent 3. DHW Plate Heat Exchanger 22 4. Circulation Pump 5. Drain Off Point 14 6. Pressure Relief Valve 7. Optional Integral Timer Position 13 8. Central Heating System Pressure Gauge 21 9. PCB 16 10. Control Box 11. 3-Way Valve Assembly 20 12. Condensate Trap 13. Flame Sensing Electrode 14. Spark Electrode 15. Primary Heat Exchanger 16. Fan Assembly 17. On/Off/Reset Selector Switch 18. Central
Resumo do conteúdo contido na página número 9
3.0 Appliance Operation 1 Central Heating Circuit 3.1 Central Heating Mode (Fig. 2) 27 1. With a demand for heating, the pump circulates water through the primary circuit. 2 2. Once main burner ignites the fan speed controls the gas rate to maintain the heating temperature measured by the 3 4 7 temperature sensor. 26 20 5 6 3. When the flow temperature exceeds the setting temperature, a 3 minute delay occurs before the burner relights automatically (anti-cycling). The p
Resumo do conteúdo contido na página número 10
4.0 Technical Data 4.1 Gold Combi 24, 28 & 33 HE A Appliance Type C C C 13 33 53 NO Class 5 Inlet Pressure (Natural Gas - G20) x mbar 20 Appliance Category CAT I 2H Central Heating Primary Circuit Pressures Injector (Natural Gas - G20) Heat Input CH (Net) Max Min bar 7.5mm (24&28 model) 12mm(33 model) 24 model kW 20.5 7 Safety Discharge 3 Electrical Supply 230V~ 50H z Max Operating 2.5 28 model kW 24.7 9 (Appliance must be connected to an Min Operating 0.5 33 model kW 28.9 9.7 earthed supply
Resumo do conteúdo contido na página número 11
5.0 Dimensions and Fixings Dimensions A 780mm E At least 1.5° G B 345mm C 450mm D 116mm Ø Min. A E 185mm (207mm for 80/125mm flue systems) F 145mm G 131mm B H 180mm 360° Orientation J 270mm H D C J Flue Ø 100mm F Tap Rail 32.5 mm Condensate Drain 65 mm 65 mm 65 mm 65 mm 65 mm Heating Heating Domestic Hot Gas Cold Water Pressure Relief Return Flow Water Outlet Inlet Inlet Valve (22mm) (22mm) (15mm) (22mm) (15mm) (15mm) 11 © Baxi Heating UK Ltd 2008
Resumo do conteúdo contido na página número 12
6.0 System Details 6.1 Information 1. The Potterton Gold Combi HE A Condensing Combination Boiler is a ‘Water Byelaws Scheme - Approved Product’. To comply with the Water Byelaws your attention is drawn to the following installation requirements and notes (IRN). a) IRN 001 - See text of entry for installation requirements and notes. b) IRN 302 - Byelaw 14. 2. Reference to the WRc publications, ‘Water fittings and materials directory’ and ‘Water supply byelaws guide’ give full details of byelaw
Resumo do conteúdo contido na página número 13
6.0 System Details 6.5 System Filling and Pressurising (Fig. 4) 1. A filling point connection on the central heating return Double Stop Stop Check pipework must be provided to facilitate initial filling and Valve Valve Valve pressurising and also any subsequent water loss replacement/refilling. A filling loop & instructions are provided with the boiler 2. The filling method adopted must be in accordance with all Temporary DHW CH Hose relevant water supply regulations and use approved Mains Ret
Resumo do conteúdo contido na página número 14
6.0 System Details 6.8 Domestic Hot Water Circuit (Fig. 7) 1. All DHW circuits, connections, fittings, etc. should be fully in accordance with relevant standards and water supply regulations. Other Tap Outlets 2. Your attention is drawn to: for GB: Guidance G17 to G24 and recommendation R17 to Boiler Expansion R24 of the Water Regulations Guide. Vessel for IE: the current edition of I.S. 813 “Domestic Gas Installations”. 3. A single check valve must be fitted as shown in Fig. 7 to Check preven
Resumo do conteúdo contido na página número 15
7.0 Site Requirements 5mm Min 450mm 5mm Min 7.1 Location 1. The boiler may be fitted to any suitable wall with the flue 200mm Min (300mm Min if passing through an outside wall or roof and discharging to using 80/125mm atmosphere in a position permitting satisfactory removal of flueing system) combustion products and providing an adequate air supply. The boiler should be fitted within the building unless otherwise protected by a suitable enclosure i.e. garage or outhouse. (The boiler may be fitte
Resumo do conteúdo contido na página número 16
7.0 Site Requirement Gas Service Cock 7.3 Ventilation of Compartments 1. Where the appliance is installed in a cupboard or compartment, no air vents are required. 2. BS 5440: Part 2 refers to room sealed appliances installed in compartments. The appliance will run sufficiently cool without ventilation. 7.4 Gas Supply 1. The gas installation should be in accordance with the relevant standards. In GB this is BS 6891. In IE this is the current edition of I.S. 813 “Domestic Gas Installations”. Fig.
Resumo do conteúdo contido na página número 17
50mm per metre of pipe run 2.5° Minimum fall 50mm per metre of pipe run 2.5° Minimum fall 50mm per metre of pipe run 2.5° Minimum fall 50mm per metre of pipe run 2.5° Minimum fall 7.0 Site Requirements 7.7 Condensate Drain Termination to an internal soil and Boiler vent pipe FAILURE TO INSTALL THE CONDENSATE DISCHARGE PIPEWORK CORRECTLY WILL AFFECT THE RELIABLE OPERATION OF THE BOILER The condensate discharge pipe MUST NOT RISE at any point along its length. There MUST be a fall of AT LEAST 2.5°
Resumo do conteúdo contido na página número 18
Terminal Position with Minimum Distance (Fig. 18) (mm) 7.0 Site Requirements a A Directly below an opening, air brick, opening windows, etc. 300 a B Above an opening, air brick, opening window etc. 300 7.8 Flue a C Horizontally to an opening, air brick, opening window etc. 300 D Below gutters, soil pipes or drain pipes. 25 E Below eaves. 25 NOTE: Due to the nature of the boiler a plume of water F Below balconies or car port roof. 25 vapour will be discharged from the flue. This should be G From
Resumo do conteúdo contido na página número 19
8.0 Flue Options 8.1 Horizontal Flue Systems 1. The standard flue is suitable only for horizontal termination applications. 2. All fittings should be fully engaged. The approximate engagement is 40mm. Apply soap solution to the seal on Y each fitting to aid assembly. X 3. Maximum permissible equivalent flue lengths are:- (60/100) (80/125) Horizontal Concentric 10 metres 20 metres 4. Any additional “in line” bends in the flue system must be taken into consideration. Their equivalent lengths are:
Resumo do conteúdo contido na página número 20
8.0 Flue Options Vertical 8.2 Twin & Vertical Flue Systems Flues (Twin Pipe) 1. Maximum permissible equivalent flue lengths are:- (60/100) (80/125) Vertical Concentric 10 metres 20 metres Y Vertical Twin Pipe 15 metres 2. Any additional “in line” bends in the flue system must be X taken into consideration. Their equivalent lengths are:- Concentric Pipes: 135° bend 0.5 metres 93° bend 1.0 metres Twin Flue Pipe 135° bend 0.25 metres 91.5° bend 0.50 metres Vertical The elbow supplied with the stan