Resumo do conteúdo contido na página número 1
Please keep these instructions safe.
Should you move house, please hand
them over to the next occupier.
Baxi Combi Instant 105e
Gas Fired Wall Mounted Combination Boiler
User’s Operating
Instructions
Resumo do conteúdo contido na página número 2
Natural Gas Baxi Combi Instant 105e o G.C.N 47 075 09 Baxi UK Limited is one of the leading manufacturers of domestic heating products in the UK. Our first priority is to give a high quality service to our customers. Quality is designed into every Baxi product - products which fulfil the demands and needs of customers, offering choice, efficiency and reliability. To keep ahead of changing trends, we have made a The boiler meets the requirements of Statutory Instrument commitment to develop ne
Resumo do conteúdo contido na página número 3
STANDARD SCOPE B.S. 6891 Gas Installation. 1.0 Warnings B.S. 5440: Pt 1 Flues. B.S. 5440: Pt 2 Air Supply. B.S. 5546 Installation of hot water supplies 1.1 Safe Installation for domestic purposes. B.S. 7074 Expansion vessels and ancillary 1. The appliance is suitable for installation only in equipment for sealed water systems. G.B. and I.E. and should be installed in B.S. 5449 Forced circulation hot water systems. accordance with the rules in force. For Ireland B.S. 6798 Installation of gas fire
Resumo do conteúdo contido na página número 4
4 3 2.0 Introduction 2.1 Introduction 1. Your Baxi Combi Instant 105e is a gas fired, room sealed, powered flue combination boiler, providing central heating for your home and mains fed domestic hot water to taps and shower. It is fully automatic and does not have a pilot light. 2. Priority is given to the hot water mode - when a hot water tap is turned on the supply of heat to the central heating circuit is interrupted. 2.2 Instant Domestic Hot Water 1. The boiler expansion vessel incorporate
Resumo do conteúdo contido na página número 5
4 4 3 3 3.0 Operating the Boiler 3.1 Operating the Boiler 1. Ensure that the electricity and gas supplies are turned on. Check that the central heating pressure is between 0.5 and 1.0 bar (Fig. 4). 2. Turn the On/Off/Reset selector switch either anti-clockwise from the off position (Fig. 6) to both central heating and domestic hot water or 6 7 8 9 10 11 clockwise to domestic hot water only. 30° 40° 50° 60° 70° 80° 3. In either position the green power on indicator ( ) will illuminate (Fig.
Resumo do conteúdo contido na página número 6
3.0 Operating the Boiler 3.2 Temperature Control 1. Central Heating: The central heating hot water flow temperature can be adjusted between 30° C (± 5° C) minimum and 85° C (± 5° C) maximum. 2. Turn the control knob clockwise to increase the temperature (Fig. 9). 3. In normal winter usage we recommend that the central heating temperature be set at maximum. 4. Domestic Hot Water Pre-Heat: To enjoy optimum performance of the boiler the pre-heat control should be set fully clockwise to the ON Fig.
Resumo do conteúdo contido na página número 7
3.0 Operating the Boiler Pump/Low Pressure Neon Air Flow 3.4 Safety Thermostat Monitor Neon Sensor Fault Neons Safety 1. Your Baxi Combi Instant 105e is fitted with an Thermostat additional safety device, which shuts down the Neon boiler in the event of the system or the boiler overheating. The safety thermostat neon ( ) will 30° 40° 50° 60° 70° 80° light in this instance (Fig. 14). 2. To reset: Turn the selector fully anti-clockwise against the spring pressure to the reset position ( ) a
Resumo do conteúdo contido na página número 8
4 4 4 4 3 3 3 3 3.0 Operating the Boiler Pressure Gauge 3.9 Central Heating System Pressure 2 1. The water pressure in the central heating system is indicated by the pressure gauge. bar 2. With the system cold and the boiler not Fig. 18 operating the pressure should be between 0.5 Normal Pressure (when cold) and 1.0 bar. During operation the pressure should not exceed 2.5 bar, and will normally be between 1.0 and 2.0 (Figs. 18 & 19). 2 3. A pressure of 3 or greater indicates a fault. The safety
Resumo do conteúdo contido na página número 9
4.0 Clearances and Check List 5mm Min 450mm 5mm Min 4.1 Clearances around the Boiler (Figs. 23 & 24) 1. The minimum clear spaces needed around 200mm Min the boiler measured from the casing are as follows: Top - 200mm Bottom - 200mm Both sides - 5mm Front - 5mm (In Operation) - 450mm (For Servicing) 2. These areas must not be obstructed in any way. Blocking the clearance spaces may result in the boiler overheating and damage 780mm may occur. 3. The gas burning compartment of your boiler is comple
Resumo do conteúdo contido na página número 10
5.0 Cleaning, Spares & Guarantee 5.1 Cleaning the Outercase The painted panels should be wiped with a damp cloth and then dried completely. DO NOT USE ABRASIVE CLEANING AGENTS. 5.2 Spare Parts IMPORTANT - Only a competent person should be used to service or repair this boiler. 1. Any repairs to the boiler will usually be the responsibility of the Installer during the guarantee period after which spare parts may be obtained through approved Baxi stockists if required. 2. Quote the appliance name,
Resumo do conteúdo contido na página número 11
Baxi UK Limited manufacture a comprehensive range of products for the domestic heating market. Gas Central Heating Boilers (Wall, Floor and Fireside models). Independent Gas Fires. Renewal Firefronts. Gas Wall Heaters. Solid Fuel Fires. If you require information on any of these products, please write, telephone or fax to the Sales Department. 11
Resumo do conteúdo contido na página número 12
o Comp N 248742 - Iss 1 - 2/01 After Sales Service 08706 096 096 Baxi UK Limited Brownedge Road Bamber Bridge Preston Lancashire PR5 6SN www.baxi.com 921.892.1