Resumo do conteúdo contido na página número 1
SG-1 Service Gateway System
User Manual
Document Number: SG1-UM-8500-03
Resumo do conteúdo contido na página número 2
REVISION HISTORY The Revision History provides a summary of any changes in this manual. Please make sure you are using the latest revision of this manual. June 30, 2006 Revision Release Date Revisions Made 01 January 26, 2005 Initial Release 02 August 5, 2005 Revisions to various first-level and second-level commands. Addition of new Appendix: “SG-1 Vendor Specific Attributes.” 03 June 30, 2006 Software Upgrade. This manual is available online at ADC’s website (www.adc.com/documentationlibrar
Resumo do conteúdo contido na página número 3
Table of Contents About This Manual ..........................................................................................................xi Introduction ...............................................................................................................................xi Organization ..............................................................................................................................xi Intended Audience ....................................................
Resumo do conteúdo contido na página número 4
Table of Contents June 30, 2006 Chapter 5: Using the Command Line Interface ........................................................... 5-1 Configuring the SG-1 ............................................................................................................... 5-1 Logging On ............................................................................................................................... 5-1 Logging Off ....................................................................
Resumo do conteúdo contido na página número 5
June 30, 2006 Table of Contents Appendix B: Redirection Server .................................................................................B-1 ORUP Commands ...................................................................................................................B-3 Service Name Commands .......................................................................................................B-4 TFTP Commands ............................................................................
Resumo do conteúdo contido na página número 6
Table of Contents June 30, 2006 vi SG1-UM-8500-03
Resumo do conteúdo contido na página número 7
List of Figures Figure 1-1. SG-1 10U .......................................................................................................... 1-2 Figure 2-1. Straight-Through and Cross-Over Cable Pin-Outs ........................................... 2-3 SG1-UM-8500-03 vii
Resumo do conteúdo contido na página número 8
List of Figures June 30, 2006 viii SG1-UM-8500-03
Resumo do conteúdo contido na página número 9
List of Tables Table 1-1. Packing List .........................................................................................................1-4 Table 1-2. System Installation Notes .................................................................................... 1-4 Table 1-3. Possible SG-1 Options ........................................................................................ 1-6 Table 2-1. RJ-45 Pin-Outs ..........................................................................
Resumo do conteúdo contido na página número 10
List of Tables June 30, 2006 x SG1-UM-8500-03
Resumo do conteúdo contido na página número 11
ABOUT THIS MANUAL INTRODUCTION This manual applies to ADC's Service Gateway (SG) system, hereafter referred to as "SG-1." This document includes an overview of the platform, installation procedures, and an SG-1 commands reference. ORGANIZATION This manual includes the following chapters: Chapter Description Chapter 1: Overview Details features and pre-installation requirements for the SG-1 platform, including site requirements for power and cabling. Chapter 2: Installation Provides detailed pr
Resumo do conteúdo contido na página número 12
About This Manual June 30, 2006 CONVENTIONS The following style conventions and terminology are used throughout this guide. Element Meaning Bold font Text that you must input exactly as shown (e.g., type 1 for card 1), menu buttons (e.g., ACCEPT SHELF OPTIONS) or menu screen options (e.g., ALARMS screen) that you must select Italic font Variables that you must determine before inputting the correct value (e.g., Password ) Monospace font References to screen prompts (e.g., Invalid Password...Tr
Resumo do conteúdo contido na página número 13
1 Chapter OVERVIEW The SG-1 is a service creation platform optimized for delivering differentiated services to residential, mobile, and private subscribers. The SG-1 enables service providers to offer attractive new services that can be selected dynamically and automatically by their wireless, dial-up and broadband users. The SG-1 can provide services over existing infrastructure, integrating smoothly with leading network access servers, RADIUS servers, databases, and billing systems. The SG-
Resumo do conteúdo contido na página número 14
Chapter 1: Overview June 30, 2006 The SG-1 comprises two types of system chassis: 1U and 10U. The 1U chassis (or Mini System Chassis) has 2 service creation slots and 1 power supply slot built into the chassis. The 10U chassis (or Full-Size System Chassis) has 16 service creations slots and 4 power supply slots for load sharing redundancy (see Figure 1-1). Figure 1-1. SG-1 10U BEFORE YOU BEGIN Before installing the SG-1 chassis and its associated modules, it is important to prepare for install
Resumo do conteúdo contido na página número 15
June 30, 2006 Chapter 1: Overview • Identify any required procedures and tests. • On an equipment plan, make a preliminary decision that locates each of the SG-1 chassis that you plan to install. • Read this manual, whether you are replacing or adding a SG-1 chassis that is being installed. • Verify the list of replaceable parts for the installation (screws, bolts, washers, and so on) so that the parts are identified (see Table 1-1 on page 1-4). • Check the required tools list to make sure the
Resumo do conteúdo contido na página número 16
Chapter 1: Overview June 30, 2006 Table 1-1. Packing List Catalog/Part Item Number SG-1 Service Gateway System Chassis SG-1 Service Gateway System User Manual SG-1 Service Gateway System Installation Kit • Ten (10) 6-32 x 3/16 screws: • Two (2) 8-32 x 5/16 screws: • Eight (8) 12-24 x 3/8 screws: • Two (2) mounting brackets • One (1) #6 ground cable • DB9/RJ45 “F” connector Table 1-2. System Installation Notes Notes: 1-4 SG1-UM-8500-03
Resumo do conteúdo contido na página número 17
June 30, 2006 Chapter 1: Overview REQUIRED TOOLS AND EQUIPMENT The following tools are required to install the SG-1 chassis: • Grounding or ESD-preventive wrist strap • No. 2 Phillips-head screwdriver • Multimeter (for continuity testing) • Wire stripper • Wire-wrap tool • Box cutter • #26 AWG wire SPECIFIC SG-1 CHASSIS INSTALLATION REQUIREMENTS The SG-1 chassis dimensions are: • Height of 17.50 inches (44.4 cm) (10U) • Width of 19.0 inches (44.8 cm) without rack adapters attached to the left a
Resumo do conteúdo contido na página número 18
Chapter 1: Overview June 30, 2006 Table 1-3. Possible SG-1 Options If you want to add: Then: SG-1 chassis Consider installing the first chassis in the top position of a rack to allow for further expansion below it. Fast Ethernet Port Add a Rear I/O card on the corresponding rear slot of an SCC that Fast Ethernet access is desired. Service Creation Cards: VRRP Use an SCC of the same type in any slot (1 through 16). Consider placing cards participating in functional groups in adjacent slots
Resumo do conteúdo contido na página número 19
June 30, 2006 Chapter 1: Overview Chassis Ground and Power Cabling The recommended cabling to ground the SG-1 chassis is 6 AWG (minimum) stranded copper wire. For the SG-1 chassis, the recommended cabling is 14 AWG (1.88 mm diameter) stranded copper or 14 AWG (1.628 mm diameter) solid wire to connect the DC terminal block to the facility provided power. For the SG-1 chassis power cable, use one of the following: • PC US for North America • PC EURO for Europe • PC UK for the United Kingdom Netwo
Resumo do conteúdo contido na página número 20
Chapter 1: Overview June 30, 2006 1-8 SG1-UM-8500-03