Resumo do conteúdo contido na página número 1
®
Guardian Easytrack System
Installation
3-Post Assembly
&
Model 93000
Instruction
Manual
Resumo do conteúdo contido na página número 2
2 Introduction TABLE OF CONTENTS Introduction .......................................................................................... 2 Important Safeguards.............................................................................. 3 Requirements ......................................................................................... 4 Before You Begin ................................................................................... 5 Kit Contents & Part Numbers ........................
Resumo do conteúdo contido na página número 3
Important Safeguards 3 IMPORTANT SAFEGUARDS Do not operate this equipment without first reading and understanding this manual. Should you be unable to understand the warnings, cautions and instructions, contact our technical support or your local dealer before attempting to use this equipment– otherwise injury or damage may result. Important information is highlighted by these terms: WARNING– Notices as used in the manual apply to hazards or unsafe practices which could result in serious bodily
Resumo do conteúdo contido na página número 4
4 Requirements REQUIREMENTS Failure to meet requirements listed below could result in serious bodily harm. Ceiling Requirements • Install to a rigid ceiling (must have a framework above it). • Must have a maximum of 24" (610mm) between the trusses in the ceiling. • Ceiling must be made of wood or 1/2"(12.7mm) sheet rock or thicker. • Ensure ceiling and floor are clear of any dust, grease, water or any foreign substance. A build-up of nicotine, grease or water on the ceiling will affect the inte
Resumo do conteúdo contido na página número 5
8" [200 mm] 74.8" – 124.5" [1900 – 3160 mm] Before You Begin 5 BEFORE YOU BEGIN Read "Requirements" and “Important Safeguards” before attempting to assemble the 36" Easytrack System. 1. Survey the room where you plan to install the Easytrack System. Make sure the room meets all the specifi- cations outlined in "Requirements". Figure 2 Figure 1 2. Use the measurements below to determine the best place to put the Easytrack System: a. Over a bed - approx. 36-40" (915-1020 mm) from the head of the
Resumo do conteúdo contido na página número 6
6 Assembly of 3-Post System EASYTRACK 3-POST SYSTEM KIT CONTENTS & PART NUMBERS (Figure 6) Description Part # Qty 1 Pivoting extendable 1 2 4 rail w/standard trolley 900-0850 1 3 16 2 Extendable rail 5 w/swivel trolley 900-0800 1 15 3 Pivot post ?? 1 6 4 Post top for pivot post N/A 4 5 Standard post 900-0500 2 14 6 Blue locking handle N/A 3 7 7 Round blue cap 900-0720 3 8 Allen key 900-3280 1 9 Clip-on level 900-0600 1 8 10 Top plate 900-0400 3 13 11 Round foot plate 900-0350 3 9 12 Blue plas
Resumo do conteúdo contido na página número 7
Assembly of 3-Post System 7 5. Take the pivot post out of the box and the post top for pivot post. Insert the post top into the post until it snaps into place (Figure 9). 6. Take top plate and clip-on level out of the box. Place the clip-on level onto the post at approximately waist height (Figure 10). 7. Place the post onto the foot plate and press down to tighten. Pay Figure 9 Figure 10 attention to the shape of the post and foot plate before pressing down onto the foot plate. 8. Place the t
Resumo do conteúdo contido na página número 8
8 Assembly of 3-Post System 12. Once the bubble is in the center of the clip-on level, continue to tight- en ONLY until the red zone at the top of the post is no longer visible (Figures 16-A & B). Red zone must not be visible for the post to be safely secured. o not over-tighten the post. Figure 16-A Figure 16-B Tighten only until red zone disap- pears. Over-tightening post may cause damage to the ceiling. 13. Remove the level from the post by sliding it up off the bottom portion of the post. Sl
Resumo do conteúdo contido na página número 9
Assembly of 3-Post System 9 b. Find the end stopper from inside the top of the rail. The top por- tion is the section without the small trolley in it (Figure 20). c. Using the Allen key provided, loosen the stopper in the upper portion of the rail and slide it out of the rail (Figure 21). 20. Place the end of the rail with the hooks onto the pivot post (Figure 22). Figure 21 Figure 20 NOTE– Tilt the rail upward (45°) to latch the rail onto the post. 21. Extend the rail and thread the wheels of t
Resumo do conteúdo contido na página número 10
10 Disassembly of 3-Post System BEFORE USING THE EASYTRACK SYSTEM GO THROUGH THE FOLLOWING CHECKLIST: Make sure the red zone on top of all posts are not visible. Make sure the posts are straight. (Did you use the clip-on level?) Make sure the rail is locked into place (see step 15) and that it looks level. Make sure the stopper is snug (see step 22b). Make sure the pivoting rail slides smoothly from side to side. Check your installation against Figure 27. Is the blue locking handle
Resumo do conteúdo contido na página número 11
8" [200 mm] 74.8" – 124.5" [1900 – 3160 mm] Specifications / Maintenance 11 NOTE– Metal pins cannot be pressed in when there is downward pressure on them. Pressure must be released to press in pins. 14. Remove the post from the foot plate by stepping on both sides with your feet and pulling the post up. 15. Place all pieces into a box or bag to protect them from dust and/or damage. 16. Repeat steps 11-16 for the second and third posts. NOTE– Put the level and the Allen key with the rest of the E
Resumo do conteúdo contido na página número 12
12 Maintenance Upon receipt of your Easytrack System: 1. Make sure you received all components listed in Figure 6. 2. Inspect all parts for possible damage in transit. 3. Ensure all components are in working order. 4. Arrange for repair/replacement of any faulty parts. 5. Keep a log of any repair/replacement required. Before each use of the Easytrack System: 1. Make sure posts are straight. If they do not appear straight, use level to check. If posts are not straight, remove rail (see Disassemb
Resumo do conteúdo contido na página número 13
Troubleshooting 13 TROUBLESHOOTING PROBLEM CORRECTION 1. Trolley moves substantially on its own when 1. Are posts, straight? Use level (see assembly instructions step 11). the Easytrack System is fully assembled. 2. Are the rails secured to the posts? Press up on the rail to make sure that the rail is latched onto the post. 3. Is the ceiling level? An uneven ceiling will make the rail uneven. See "Requirements" section in manual. 2. Extended rail comes completely apart during 1. Rail has bee
Resumo do conteúdo contido na página número 14
14 Easytrack Products & Accessories EASYTRACK PRODUCTS & ACCESSORIES Easytrack 2-Post System........................................................................... 92000 Easytrack 4-Post System........................................................................... 94000 Easytrack 2-Post with Tub Bracket ............................................................. 92001 Easytrack 3-Post with Tub Bracket ............................................................. 93001 Easytrack Portabl
Resumo do conteúdo contido na página número 15
Warranty 15 WARRANTY This warranty is extended only to the original purchaser/user of Sunrise products. Sunrise Medical Inc. warrants its products to be free from defects in material under normal use and service and will, within the periods stated below, from the date of purchase. If within such warranty period any such product shall be proven to be defective, such product shall be repaired or replaced at Sunrise Medical's option. This warranty does not include any labor or shipping charges
Resumo do conteúdo contido na página número 16
Distributed by: Sunrise Medical 7477 East Dry Creek Parkway Longmont, Colorado 80503 (800) 333-4000 In Canada (800) 263-3390 Printed in Canada © 2001 Sunrise Medical 10.01 900-0610 Rev. A