Streszczenie treści zawartej na stronie nr. 1
TITAN SINGLE™
INSTALLATION & OPERATING GUIDE
BUNN-O-MATIC CORPORATION
POST OFFICE BOX 3227
SPRINGFIELD, ILLINOIS 62708-3227
PHONE: (217) 529-6601 FAX: (217) 529-6644
To ensure you have the latest revision of the manual or to obtain the illustrated parts catalog, please visit
the Bunn-O-Matic website, at www.bunn.com. This is absolutely FREE, and the quickest way to obtain
the latest catalog and manual updates. Contact Bunn-O-Matic Corporation at 1-800-286-6070 to obtain a
paper copy of
Streszczenie treści zawartej na stronie nr. 2
BUNN-O-MATIC COMMERCIAL PRODUCT WARRANTY Bunn-O-Matic Corp. (“BUNN”) warrants equipment manufactured by it as follows: 1) Airpots, thermal carafes, decanters, GPR servers, iced tea/coffee dispensers, MCP/MCA pod brewers thermal servers and Thermofresh servers (mechanical and digital)- 1 year parts and 1 year labor. 2) All other equipment - 2 years parts and 1 year labor plus added warranties as specified below: a) Electronic circuit and/or control boards - parts and labor for 3 years. b) C
Streszczenie treści zawartej na stronie nr. 3
USER NOTICES Carefully read and follow all notices in this manual and on the equipment. All labels on the equipment should be kept in good condition. Replace any unreadable or damaged labels. WARNING HAZARDOUS VOLTAGE DISCONNECT FROM POWER SOURCE BEFORE REMOVING! 12559.0003 #00986.0000 #00658.0000 Optional Field Wiring 120/208 V, 40.1 A, 8200 W 1PH, 3-Wire + GND, 50/60HZ 29710.0015 #37881.0000 Optional Field Wiring As directed in the International Plumbing Code of the International Code Co
Streszczenie treści zawartej na stronie nr. 4
ELECTRICAL REQUIREMENTS WARNING - If the power cord is ever damaged, it must be replaced by the manufacturer or its service agent with a special cord available from the manufacturer or its service agent in order to avoid a hazard. Refer to Data Plate on the Brewer, and local/national electrical codes to determine circuit requirements. TO MACHINE WHI WHI N N BLU BLU L1 L2 L3 N L3 L3 RED RED L2 L2 FROM POWER SOURCE BLK BLK FOR SINGLE PHASE OPERATION L1 L1 MOVE BLU WIRE INTO TERMINAL BLOCK WITH BL
Streszczenie treści zawartej na stronie nr. 5
CE REQUIREMENTS • This appliance must be installed in locations where it can be overseen by trained personnel. • For proper operation, this appliance must be installed where the temperature is between 5°C to 35°C. • Appliance shall not be tilted more than 10° for safe operation. • An electrician must provide electrical service as specified in conformance with all local and national codes. • This appliance must not be cleaned by water jet. • This appliance is not intended for use by persons (incl
Streszczenie treści zawartej na stronie nr. 6
OPERATING CONTROLS B C G E ENABLE READY TO BREW ON / OFF WATER TEMP: 200° BREW LARGE BREW SMALL P3894 F D H A. MAIN ON/OFF SWITCH This switch, located under the brewer in front of the right rear leg, turns power on and off to all components in the brewer. B. ON/OFF SWITCH (ENABLE BREW) Pressing the "ON/OFF" switch will alternately turn the brew components on and off. Pressing this switch during the brew cycle will interrupt the brew cycle, stopping the flow of water. Pressing this switch dur
Streszczenie treści zawartej na stronie nr. 7
INITIAL SET-UP 1. Insert an empty funnel into the funnel rails of the brew 205° F (96.1° C) station. 2. Place an empty server under the funnel. 3. Connect the brewer to the power source. Make sure the ON/OFF (Enable Brew) switch is ON (LED will be lit). 4. Water will flow into the tank and stop when the tank is filled to its capacity. Display will show PLEASE WAIT... TANK FILLING until tank is filled with water. 5. Wait approximately twenty-five minutes for the water in the tank to heat to
Streszczenie treści zawartej na stronie nr. 8
COFFEE BREWING Fold over top 1. Begin each brew cycle with a clean empty brew funnel. edge of filter 2. Insert a BUNN filter into the funnel. NOTE: The funnels are equipped with 4 wire loops that can be folded over top edge of filter if desired, to prevent filter from folding in during the brew cycle. 3. Pour the fresh coffee into the filter and level the bed of grounds by gently shaking. 4. Slide the funnel into the funnel rails until it stops. 5. Place an empty server under the funnel. 6.
Streszczenie treści zawartej na stronie nr. 9
CLEANING 1. The use of a damp cloth rinsed in any mild, nonabrasive, liquid detergent is recommended for cleaning all surfaces on Bunn-O-Matic equipment. Do NOT clean this equipment with a water jet device. 2. Check and clean each sprayhead. The sprayhead holes must always remain open. NOTE: Any buildup on the sprayhead may restrict water flow, and impact your coffee brewing. For consis- tently great coffee, clean sprayheads weekly. Upon visual inspection it may appear that light passes throug