Streszczenie treści zawartej na stronie nr. 1
Installation
Instructions
If you have questions, call 800-GE-CARES or visit our website at: www.monogram.com
27" and 30"
Warming Drawers
Models:
ZKD910
ZTD910
Streszczenie treści zawartej na stronie nr. 2
Before you begin – Read these instructions completely and carefully. IMPORTANT – Save these instructions for local inspector’s use. IMPORTANT – OBSERVE ALL GOVERNING CODES AND ORDINANCES. Note to Installer – Be sure to leave these instructions with the Consumer. Note to Consumer – Keep these instructions with your Owner’s Manual for future reference. CAUTION WARNING This appliance must be properly grounded. See “Electrical Supply”, page 4. Cet appareil doit être correctement mis à la terre. Cons
Streszczenie treści zawartej na stronie nr. 3
Design Information Warming Drawer ZTD910 The warming drawers may be installed Models 30” Wide model directly into a wall or wall oven cabinetry, Available ZKD910 or below a countertop. 27” Wide model Product 27" 23-1/4" Dimensions Drawer 10-1/2" 9" Open A 1" 26" Including Handle Dimension A ZTD910 30” ZKD910 26-3/4” ZXD27B, ZXD30B – This kit provides for the JXPN2 – Warming drawer pan kit. This kit Accessories installation of a custom front panel on 27" includes supports and one full size and on
Streszczenie treści zawartej na stronie nr. 4
Design Information Warming Drawer • The drawer may be installed below a • Electrical power cord is located on the right Advance countertop, a cooktop, a single or double side of the warming oven. Locate the outlet Planning oven and side by side using 2 drawers. within reach of the 56" long power cord in • The warming drawer can be installed below an adjacent cabinet, within 42" of the right approved cooktops. Allow 2" min. clearance side or 16" from the left side of the cutout. from bottom of c
Streszczenie treści zawartej na stronie nr. 5
Installation Preparation Warming Drawer • Place carton on a flat surface. • Remove all packing materials and tape. Remove • Open one end of the carton and lift off • Locate package containing 4 wood screws Packaging the top piece. and set aside. • Lift the warmer up and out of the carton. Parts provided: and Parts • Place the drawer on top of the shipping • 4 Wood Screws carton to protect the drawer front and the finished flooring. Install Electrical Outlet 42" Max. 2x4 or 2x2 Installation From
Streszczenie treści zawartej na stronie nr. 6
Design Information Warming Drawer 23-1/2" Min. NOTE: Additional clearance between Installation Inside cutouts may be required. Check to be sure that oven supports above the Below Warming Drawer location does not Wall Ovens obstruct the required interior 23-1/2” depth and 9-1/4” height. INSTALLATION BELOW A Oven Cutout SINGLE OVEN 2x2 or 2x4 2" Min. Anti-Tip Block Against Rear Wall, 9" From Floor to 9" Allow 5/8" Bottom of 9-1/4" Overlap on Block All Sides 23-1/4" 10-1/2" A 1" Min. Above Toekick
Streszczenie treści zawartej na stronie nr. 7
Installation Warming Drawer 2"x 4" or 2"x 4" or Provide Equivalent Runners Equivalent Runners Cabinet Support 23-1/2" 23-1/2" 22" 25" 27" 30" IMPORTANT: When installed below a single or double oven, • The support must be level and rigidly check to be sure that any oven supports above the cutout do not mounted, flush with the bottom edge of obstruct the 23-1/2” required depth of the warming drawer cutout. the cutout. – There is no way to level the drawer once • A 2" min. clearance between oven a
Streszczenie treści zawartej na stronie nr. 8
NOTE: While performing installations described in this book, safety glasses or goggles should be worn. ® For Monogram local service in your area, call 1.800.444.1845. NOTE: Product improvement is a continuing endeavor at General Electric. Therefore, materials, appearance and specifications are subject to change without notice. Pub. No. 49-8937-2 Dwg. No. 164D3333P167 09-04 JR Printed in the United States