Streszczenie treści zawartej na stronie nr. 1
Coin- Operated Commercial
Tumble Action Washer
Installation Instructions and
Use and Care Guide
P/N 134778000 (0706) Made in USA
Streszczenie treści zawartej na stronie nr. 2
TABLE OF CONTENTS Important Safety Instructions..........................................3 Unpacking.......................................................................6 Installation..................................................................6-7 Pre-Installation Requirements.......................................4 Electrical Requirements.................................................4 Coin slide installation................................................7-9 Meter case instructions...
Streszczenie treści zawartej na stronie nr. 3
Grounding type Grounding type wall receptacle wall receptacle Do not use or mix Avoid fire Do not under liquid chlorine bleach with hazard or electrical shock. Do not under any any circumstances circumstances cut, remove, cut, remove, other household chemicals Do not use an adaptor plug or bypass or bypass the grounding the grounding prong such as toilet cleaners, rust or extension cord or prong from this plug. from this plug. removers, acid or products remove grounding prong containing ammoni
Streszczenie treści zawartej na stronie nr. 4
DRAIN REQUIREMENTS PRE-INSTALLATION REQUIREMENTS Models equipped with drain pump: Tools Required for Installation: 1. 1/4 in. nut driver 1. Drain MUST be capable of eliminating 17 gals (64.3 L) per 2. 3/8 in. socket with ratchet. minute. 3. 3/8 in. open end wrench. 4. 7/16 in. socket with ratchet. 2. A standpipe diameter of 1-1/4 in. (3.18 cm) minimum. 5. 9/16 in. open end wrench. 3. The standpipe height above the floor should be: 6. Channel-lock adjustable pliers. 7. Carpenter’s level. ELECTRIC
Streszczenie treści zawartej na stronie nr. 5
ROUGH-IN DIMENSIONS 17 < > (43.2) POWER CORD SIDE inch (cm) 43/8 (11.2) > < ^ 8 (20.4) v WATER INLETS UNDER COUNTER BACK inch (cm) (Figure 1). 5 5
Streszczenie treści zawartej na stronie nr. 6
UNPACKING 1. Cut the shipping carton along the dotted line along the base of the unit. 2. While in the carton carefully lay the washer on its back side. 3. Removethe styrofoam base. 4. Carefully return the washer to an upright position and remove the carton. 5. Carefully move the washer to within 4 feet (122cm) of the final location. 6. Remove the following from the back side of the washer: 3 bolts, 3 yellow plastic spacers, 2 or 3 metal "P" clamps. 9. Remove the large styrofoam block located u
Streszczenie treści zawartej na stronie nr. 7
11.Be sure you have read the "Important Safety Instructions" 5. On machines equipped with drain pump, form before operating this washer. a U shape on the end of the drain hose, with the hose pointed toward the drain. 12.Run the washer through a complete cycle. Check for water leaks and proper operation. NOTE: If the drain hose is placed in a standpipe without forming a U shape, a siphoning action 13. Keep these instructions for future reference. could occur. There must be an air gap aroun
Streszczenie treści zawartej na stronie nr. 8
STEP 6 STEP 3 Set new vend price by adding or removing the appropriate Remove coin slide from coin chute: block-out keys and/or dime inserts according to th Table Unhook and remove the coin slide return spring. (see FIGURE 2). of Vend Prices Turn coin slide mechanism upside down. (see FIGURE 7). Remove coin slide stop by taking out two screws to the chute bottom FIGURE 7 (see FIGURE 3). TABLE OF VEND PRICE (2) Slide Stop VEND COIN SLOTS PRICE Screws 1 2 3 4 5 6 7 8 FIGURE 3
Streszczenie treści zawartej na stronie nr. 9
7 Meter Case Instructions Change coin sizing block: Remove two screws that hold upper coin chute cover. INSTRUCTIONS TO CHANGE THE NUMBER OF COIN SLIDE Remove cover (see FIGURE 9). INSERTIONS TO START APPLIANCE. FIGURE 9 1. Disconnect power from machine. Anti-Cheat (2) Upper Coin 2. Remove meter-case service door. (Fig.1) Gate Chute Cover Remove Screws meter-case service door (2) Coin Sizing Shaft and Block Screws cam assembly FIGURE 1 Coin Sizing 3. Turn Shaft & Cam Assembly in a
Streszczenie treści zawartej na stronie nr. 10
REPLACEMENT PARTS If replacement parts are needed for your dryer, contact the source where you purchased your dryer, or call Frigidaire at 1-866-738-1640. For coin box parts, call 1-800-221-0982, Greenwald Industries. Destroy the carton and plastic bags after the washer is unpacked. Children might use them for play. Cartons covered with rugs, bedspreads, or plastic sheets can become airtight chambers causing suffocation. Place all materials in a garbage container or make materials inaccessible
Streszczenie treści zawartej na stronie nr. 11
V8 Coin Chute Parts List 20-3000 20-3020 V8 Parts List DESCRIPTION REQ. 20-3020 20-3000 DESCRIPTION REQ. 20-3020 20-3000 DESCRIPTION REQ. 20-3020 20-3000 ———————————————————————————— ———————————————————————————— ———————————————————————————— 31 COIN SIZING BLOCK varies 20-3007 20-3007 1 SCREW (METRIC) 2 00-9724 00-7924 16 SPRING
Streszczenie treści zawartej na stronie nr. 12
NEW VEND PRICE ____________________________________________________________ Order required parts using this tear-off. Block-out keys will be Order Form shipped to you at no charge. Follow product information To change vend price, detach and mail the lower portion to: instructions. Customer Service Department Quantity____________________________________________________ Greenwald Industries Inc. 212 Middlesex Ave. Existing Vend Price_________________________________________ Chester, CT 06412 Nam