Streszczenie treści zawartej na stronie nr. 1
Link 1000
Owner’s Guide
Streszczenie treści zawartej na stronie nr. 2
About Xantrex Xantrex Technology develops, manufactures, and markets advanced power electronic products. The company’s products convert raw electrical power from any source into high-quality power required by electronic and electrical equipment. Trademark Xantrex is a registered trademark of Xantrex International Other trademarks, registered trademarks, and product names are the property of their respective owners and are used herein for identification purposes only. Notice of Copyright Link
Streszczenie treści zawartej na stronie nr. 3
Contents Contents 1 Introducing Link 1000 Introducing the Link 1000- - - - - - - - - - - - - - - - - - - - - - - - - - - - 2 Inverter/Charger Control Functions - - - - - - - - - - - - - - - - - - - - 2 Monitoring Functions - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 2 Reading the Link 1000 Control Panel - - - - - - - - - - - - - - - - - - - - 4 Where to go From Here - - - - - - - - - - - - - - - - - - - - - - - - - - - - 6 2 Installing the Link 1000 Planning the Installation - - -
Streszczenie treści zawartej na stronie nr. 4
Contents Maintenance- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 18 Disconnecting the Inverter/Charger - - - - - - - - - - - - - - - - - - - 18 3 Setting up the Link 1000 About Link 1000 Settings - - - - - - - - - - - - - - - - - - - - - - - - - - - 20 Probable Changes - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 20 Possible Changes - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 20 Other Settings - - - - - - - - - - - - - - - - - - - - - - -
Streszczenie treści zawartej na stronie nr. 5
Contents F10 Select Battery Type - - - - - - - - - - - - - - - - - - - - - - - - - 33 F11 Turn on Second Battery Voltage Sense - - - - - - - - - - - - 33 F12 Number of Overload Conditions Experienced - - - - - - - 33 F13 Number of Inverter Low Battery Shutdowns - - - - - - - - 33 F14 Test Control Panel Display - - - - - - - - - - - - - - - - - - - - 34 F15 Display Software Revision Number - - - - - - - - - - - - - - 34 F16 Turn on Active Temperature Compensation - - - - - - - - 34 4 Using th
Streszczenie treści zawartej na stronie nr. 6
Contents A Specifications Control Panel: Electrical Specifications- - - - - - - - - - - - - - - - - - 52 Control Panel: Physical Specifications - - - - - - - - - - - - - - - - - - 52 Default Settings- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 53 B Product and System Information Warranty - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 56 Disclaimer - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 58 Product - - - - - - -
Streszczenie treści zawartej na stronie nr. 7
Figures Link 1000 Control Panel - - - - - - - - - - - - - - - - - - - - - - - - - - - 4 System Overview (Wiring)- - - - - - - - - - - - - - - - - - - - - - - - - 12 Display Panel and Mounting Plate - - - - - - - - - - - - - - - - - - - - 13 Link 1000 Mounting Plate - - - - - - - - - - - - - - - - - - - - - - - - - -14 BATTERY STATUS Light Bar - - - - - - - - - - - - - - - - - - - - - 37 vii
Streszczenie treści zawartej na stronie nr. 8
viii
Streszczenie treści zawartej na stronie nr. 9
Introducing Link 1000 Chapter 1 describes: • The Link 1000’s control and monitoring functions • The features on its control panel 1
Streszczenie treści zawartej na stronie nr. 10
Introducing the Link 1000 Introducing the Link 1000 The Link 1000 gives you complete remote control of the Freedom 458, Freedom, and Freedom Marine Inverter/ Chargers. It also lets you monitor the performance of your battery power system. Inverter/Charger Control Functions From the Link 1000 control panel, you can: • Turn the invert function on and off • Start or end an equalization cycle • Activate the Power Share feature. This automatically lowers the charger’s output to prevent AC breakers
Streszczenie treści zawartej na stronie nr. 11
Introducing the Link 1000 • The time remaining in your battery before it is completely discharged • Which charging stage the batteries are in (Bulk, Acceptance, Float, or Equalization) • Battery history including: • Present charge efficiency • The number of deep cycles the battery has had • The deepest level of discharge • The average level of discharge 3
Streszczenie treści zawartej na stronie nr. 12
Reading the Link 1000 Control Panel Reading the Link 1000 Control Panel The Link 1000 control panel lets you monitor the battery system and control the inverter/charger. Its features are described below. Further details are provided as you need them throughout the guide. 1 7 9 8 2 3 4 5 6 Figure 1 Link 1000 Control Panel 1 BATTERY STATUS light bar When the battery system is operating, the four LEDs in this light bar act like a “fuel gauge”. The LEDs light in different sequences and colors t
Streszczenie treści zawartej na stronie nr. 13
Reading the Link 1000 Control Panel 2, 3 Numeric display and display units. You can choose from four display units depending on the type of information you want to see: • Volts •Amps • Ah (Amp-hours) • Time Remaining The procedure for changing display units is given on page 36 along with an explanation of each display unit. Note: The numeric display also shows Error Codes. If an error occurs, the display alternates between the monitoring function you have selected and the Error Code. F
Streszczenie treści zawartej na stronie nr. 14
Reading the Link 1000 Control Panel 8 AC IN LED Indicates that AC power is present. 9 CHARGER STATUS LEDs: • CHG (Red): When this LED is on solid, the battery is in Bulk charge mode. When this LED is flashing, the battery is equalizing. • ACCEPT (orange): The battery is in Acceptance mode. • FLOAT (green): The battery is in Float mode. Where to go From Here • To install the Link 1000, see page 7. • To set up the Link 1000, see page 19. • To use the Link 1000, see page 35. • To call for techn
Streszczenie treści zawartej na stronie nr. 15
Installing the Link 1000 Chapter 2 gives: • An overview of the installation process • A list of installation tools and equipment • Installation procedures We recommend that you read the entire chapter so you can plan the installation and obtain all the materials you need before starting the installation. 7
Streszczenie treści zawartej na stronie nr. 16
Planning the Installation Planning the Installation Supplied Parts ❐ Link 1000 control panel and 4 mounting screws ❐ 500 amp precision shunt ❐ 25 foot RJ11 phone cable ❐ Owner’s guide Materials You Need to Supply Refer to Figure 2 on page 12. ❐ Wire harness to connect the Link 1000 control panel to the shunt and to the positive battery terminal. You can use 18AWG, twisted pair, for this wiring. You can also buy the harness from the dealer you bought the Link 1000 from or from West Marine. Co
Streszczenie treści zawartej na stronie nr. 17
Planning the Installation ❐ 2 strain reliefs (cable clamps) for the wires and phone cable coming out the back of the control panel ❐ Anti-corrosive spray ❐ High current shunt. If your starter current exceeds 500 amps for more than ten seconds, you will need a heavy duty (1000 amp) shunt instead of the 500 amp shunt that is supplied with the Link 1000. (You can also use a separate engine starting battery whose negative is connected directly to the engine.) The heavy duty shunt part number
Streszczenie treści zawartej na stronie nr. 18
Planning the Installation • The shunt sense leads must be 18AWG twisted pair wires. • Install fuses within seven inches (18cm) of the battery. Color-Coded Wiring To avoid confusion during installation, Xantrex recommends that you buy wires that have the same color coding as shown in Figure 2. Twisted Pair Wires If you wish, you can make your own twisted pairs by twisting together two wires with a twist every inch. If you make your own twisted pair, wrap tape around the wires every twelve or
Streszczenie treści zawartej na stronie nr. 19
Installing the Link 1000 Installing the Link 1000 Overview of Installation Steps Complete the installation in this order. Refer to Figure 2. 1. Mount the control panel (page 13). 2. Mount the shunt, and cable it to the negative battery terminal. Cable the load side of the shunt to the negative bus for DC loads (page 14). 3. Connect wires to the Link 1000 terminal block (page 15). 4. Connect wires from the terminal block to the shunt and to the battery’s positive terminal (page 16). 5. Install
Streszczenie treści zawartej na stronie nr. 20
Installing the Link 1000 Phone Cable Rear of Link 1000 Control Panel 12 345 678 Violet Cable System Negative Jacket 500A Gnd. Shunt Stud Red Black Blue Battery Load Side Side Green Orange 2 Amp Fuses Pos. Battery Distribution Inverter/Charger Engine Starter Negative Start Battery Neg. Distribution Figure 2 System Overview (Wiring) 12