Streszczenie treści zawartej na stronie nr. 1
Heat-N-Glo Fireplace
Installers Guide
Models:
U.S. Patents 4,793,322; 4,875,464; 5,000,162 and Patents Pending
Canadian Patent 1,297,746
6000 GDVFL
A.G.A. Design Certified/CGA Certified and
6000 XLS
Underwriters Laboratories Listed. See
Approvals Tabel on Page 1.
READ THIS MANUAL BEFORE INSTALLING
WARNING
OR OPERATING THIS APPLIANCE. THIS
IF THE INFORMATION IN
INSTALLERS GUIDE MUST BE LEFT WITH
THESE INSTRUCTIONS IS
NOT FOLLOWED EXACTLY, A APPLIANCE FOR FUTURE REFERENCE.
FIRE OR EXPLOSION MA
Streszczenie treści zawartej na stronie nr. 2
SAFETY AND WARNING INFORMATION HEAT-N-GLO GAS FIREPLACE PRODUCTS LIMITED 10 YEAR WARRANTY In order to presumptively establish the dates to which your HEAT-N-GLO Limited 10 Year Warranty runs, you Highway 13, Savage, MN 55378, within 60 days of the date of fireplace installation. If you fail to do so, you must mail the completed warranty card to HEAT-N-GLO FIREPLACE PRODUCTS, INC., 6665 West The warranty exclusions and limitations of liability are effective upon installation of the fireplace. m
Streszczenie treści zawartej na stronie nr. 3
Safety and Warning Information......................i Section 1: Approvals and Codes..................... 1 Approval Listings and Codes................................ 1 Appliance Certification...................................... 1 Installation Codes ............................................... 1 High Altitude Installations................................ 1 Table of Section 2: Getting Started ................................ 2 Contents Introducing the Heat-N-Glo Gas Fireplaces........ 2 Pre
Streszczenie treści zawartej na stronie nr. 4
Approval Listings Appliance Certification The Heat-N-Glo fireplace models discussed in this and Codes Installers Guide have been tested to certification standards and listed by the applicable laboratories. CERTIFICATION MODEL LABORATORY TYPE STANDARD 1 6000GDVFL A.G.A./CGA Direct Vent ANSI Z21.50CGA2.22 and Decorative Approvals Underwriters and Codes Laboratories 6000XLS A.G.A./CGA Direct Vent ANSI Z21.44/IR#41/CAN1-2.19 and Wall Furnace Underwriters Laboratories Installation Codes
Streszczenie treści zawartej na stronie nr. 5
Introducing the Heat-N-Glo direct vent gas fireplaces are designed to operate with all combustion air siphoned from outside Heat-N-Glo of the building and all exhaust gases expelled to the Gas Fireplaces outside. The information contained in this Installers Guide, unless noted otherwise, applies to all models and gas control systems. 2 Gas fireplace diagrams, including the dimensions, are shown in this section. Getting Started Pre-installation This gas fireplace and its components are tested and
Streszczenie treści zawartej na stronie nr. 6
When planning a fireplace installation, its necessary to determine: Where the unit is to be installed. The vent system configuration to be used. Gas supply piping. Electrical wiring. Framing and finishing details. Whether optional accessoriesdevices such as a fan, wall switch, or remote controlare desired. If the fireplace is to be installed on carpeting or tile, or on any combustible material other than wood flooring, the fireplace should be installed on a metal or wood panel tha
Streszczenie treści zawartej na stronie nr. 7
Step 1 The diagram below shows space and clearance requirements for locating a fireplace within a room. Locating the Fireplace 3 Installing the Fireplace Figure 2. Fireplace Dimensions, Locations, and Space Requirements Clearance Requirements The top, back, and sides of the fireplace are defined by stand-offs. Minimum Clearances from the Fireplace to Combustible Materials Glass Back of Sides of Top of Front Floor Fireplace Fireplace Fireplace Ceiling 36 inches 0 1/2 inch 1/2 inch 3-1/2 inches 31
Streszczenie treści zawartej na stronie nr. 8
Minimum Clearances from the Vent Pipe to Combustible Materials For Vertical For Horizontal Sections Sections At Wall Firestops Top Bottom Sides Top Bottom Sides 3 inches 1 inch 1 inch 1 inch 2-1/2 inches 1/2 inch 1 inch (75 mm) (25 mm) (25 mm) (25 mm) (63.7 mm) (13 mm) (25 mm) For minimum clearances, see the direct vent termination clearance diagrams on pages 19 and 21 in this section. Step 2 Fireplace framing can be built before or after the fireplace is set in place. Framing should be position
Streszczenie treści zawartej na stronie nr. 9
Step 3 A. Vent System Approvals These appliances are approved to use D-series direct Installing the vent pipe components and terminations. Approved Vent System vent system components are labeled for identification. NO OTHER VENTING SYSTEMS OR COMPONENTS MAY BE USED. Detailed installation instructions are included with each vent termination kit and should be used in conjunction with this Installers Guide. The drawing below shows vent system components and terminations. Identifying Vent Compone
Streszczenie treści zawartej na stronie nr. 10
DV-45D DV-90D 67/16 65/32 81/2 8/12 11 5/8 11 1/16 73/8 57/8 61/2 51/16 85/8 85/8 11 15/16 DV-48D DV-36D 47 3/4 35 3/4 6-7/16" 6-5/32" (164 mm) (156 mm) 8-1/2" (216 mm) 8-1/2" 11-5/8" 11-1/16" (216 mm) (295 mm) 7-3/8" 5-7/8" (281 mm) 6-1/2" (187 mm) (149 mm) 5-1/16" (165 mm) (129 mm) 8-5/8" (220 mm) 8-5/8" 11-15/16" (220 mm) (303 mm) 47-3/4" (1.2 m) 35-3/4" (908 mm) DV-12D DV-09D DV-06D 11-3/4" 11 3/4 8-3/4" (298 mm) 8 3/4 5-3/4" (222 mm) 5 3/4 (146 mm) NOTE: PIPES OVERLAP 1 3/8 INCHES (
Streszczenie treści zawartej na stronie nr. 11
HORIZONTAL VENTING H Kit No. Max. Run DVK-01D DVK-01TRD 24" (610 mm) Figure 6. Corner Installation Models 6000XLS, and 6000GDVFL are tested and approved to use 45° elbows in corner installations. However, 90° elbows will result in better performance. 8
Streszczenie treści zawartej na stronie nr. 12
VENTING WITH ONE (1) 90° ELBOW 1´ MIN. (305 mm) 2´ MAX. (610 mm) 2´ MIN. (610 mm) 4´ MAX. (1.22 m) 3´ MIN. (914 mm) 6´ MAX. (1.86 m) 4´ MIN. (1.22 m) 8´ MAX. (2.48 m) 40´ MAX. (12.4 m) 8´ MAX. (2.48 m) Figure 7. Venting with One 90° Elbow 9
Streszczenie treści zawartej na stronie nr. 13
VENTING WITH TWO (2) 90° ELBOWS V H H + H 1 1´ MIN. (305 mm) 2´ MAX. (610 mm) 6´ MAX. (1.86 m) 2´ MIN. (610 mm) 4´ MAX. (1.22 m) 12´ MAX. (3.72 m) 3´ MIN. (914 mm) 6´ MAX. (1.86 m) 18´ MAX. (5.58 m) 4´ MIN. (1.22 m) 8´ MAX. (2.48 m) 24´ MAX. (7.74 m) 20´ MAX. (6.2 m) 8´ MAX. (2.48 m) 24´ MAX. (7.74 m) (20´ (6.2 m) CANADA) Figure 8. Venting with Two 90° Elbows 10
Streszczenie treści zawartej na stronie nr. 14
VENTING WITH THREE (3) 90° ELBOWS 1´ MIN. (305 mm) 2´ MAX. (610 mm) 5´ MAX. (1.52 mm) 2´ MIN. (610 mm) 4´ MAX. (1.22 m) 10´ MAX. (3.1 m) 3´ MIN. (914 mm) 6´ MAX. (1.86 m) 15´ MAX. (4.65 m) 4´ MIN. (1.22 m) 8´ MAX. (2.48 m) 20´ MAX. (6.2 m) 8´ MAX. (2.48 m) 20´ MAX. (6.2 m) NOTE: V + V, MAX. 40´ (12.4 m) VENTING WITH THREE (3) 90° ELBOWS 1´ MIN. (305 mm) 2´ MAX. (610 mm) 5´ MAX. (1.52 mm) 2´ MIN. (610 mm) 4´ MAX. (1.22 m) 10´ MAX. (3.1 m) 3´ MIN. (914 mm) 6´ MAX. (1.86 m) 15´ MAX. (4.65 m) 4´ MIN
Streszczenie treści zawartej na stronie nr. 15
B. Installing Vent Components 1. Attach the First Vent Component to the Starting Collars To attach the first vent component to the starting collars of the fireplace: Apply a 3/8 inch (9.5 mm) bead of stove cement around the 5 inch (127 mm) fireplace starting collar. Make sure that the fireplace rope gasket supplied with the fireplace seals between the first 8-5/8 inch (219 mm) vent component and the outer fireplace wrap. Lock the vent components into place by sliding the concentric pipe s
Streszczenie treści zawartej na stronie nr. 16
WARNING ENSURE THAT THE FIBERGLASS ROPE GASKET SUPPLIED WITH THE FIREPLACE SEALS BETWEEN THE FIRST VENT COMPONENT AND THE OUTER FIREPLACE WRAP. If the installation is for a termination cap attached directly to the fireplace, skip to the sections, Install Firestops and Vent Termination. 2. Continue Adding Vent Components To continue adding vent components in accordance with the pre-planned vent system configuration: Ensure that each succeeding vent component is securely fitted and locked into t
Streszczenie treści zawartej na stronie nr. 17
For Vertical Runs - The vent system must be supported every eight (8) feet (2.4 m) above the fireplace flue outlet by wall brackets. To install support brackets for vertical runs: Attach wall brackets to the vent pipe and secure the wall bracket to the framing members with nails or screws. Use wall brackets to WALL BRACKET support vertical runs every 8 feet (2.4 m) above the fireplace flue outlet. WALL STUD 8 FT. (2.4 m) FLUE FLUE OUTLET OUTLET 1 INCH MIN. 1 INCH MIN. (25.4 mm) (25.4 mm) Figur
Streszczenie treści zawartej na stronie nr. 18
Position the firestops on both sides of the hole previously cut and secure the firestops with nails or screws. The heat shields of the firestops MUST BE placed towards the top of the hole. Continue the vent run through the firestops. 1. Cut the 12-inch by 12" 12" 12-inch hole. (305 (305 mm) mm) 12" 12" (305 (305 mm) mm) 1" (25.4 mm) VENT PIPE Figure 13. 12" x 12" Hole and Vent Pipe 2. Position the firestops. TRIM HEA TRIM HEAT T HEAT SHIELD SHIELD IF T SHIELD IF TO OO O 3. Place the heat s
Streszczenie treści zawartej na stronie nr. 19
Drill a hole or drive a nail through this centerpoint. Check the floor above for any obstructions, such as wiring or plumbing runs. Reposition the fireplace and vent system, if neces- sary, to accommodate the ceiling joists and/or obstructions. Cut an 11-inch X 11-inch (280 mm X 280 mm) hole through the ceiling, using the centerpoint previously marked. Frame the hole with framing lumber the same size as the ceiling joists. 1. Cut the 11-inch by 11-inch hole. 11" (280 mm) 11" (280 mm) 2
Streszczenie treści zawartej na stronie nr. 20
If the area above the ceiling IS an attic, position and secure the firestop on top of the previously framed hole. This shows an attic NAILS (4 REQUIRED) installation. 1. Keep insulation away from the vent pipe at least 1 inch (25 mm). RAFTER CEILING CEILING FIRESTOP Figure 17. Attic Firestop C. Vent Termination For Horizontal Terminations - To attach and secure the termination to the last section of horizontal vent: Rotate and interlock the ends as described at the beginning of the Installing