Streszczenie treści zawartej na stronie nr. 1
Operation and Installation Instructions
Self-Contained Material Loader
(Compressed Air Venturi Type)
SVL-A, SVL-B, SVL-C, & SVL-D
SVL-B
SVL-A SVL-C
Bulletin No.: CV6-600
Part No.: 882.00685.00
Effective: 7/2007
SVL-A, SVL-B, SVL-C, & SVL-D Self-Contained Material Loaders - Venturi Style 1 of 49
Streszczenie treści zawartej na stronie nr. 2
The manufacturer retains all rights to change the information in these operating instructions at any time without notice. We assume no liability for any errors or direct or indirect damage resulting in context with these operating instructions. Copying, translation or publication in any form except for personal use of purchaser requires approval from the manufacturer. All rights reserved. SVL-A, SVL-B, SVL-C, & SVL-D Self-Contained Material Loaders - Venturi Style 2 of 49
Streszczenie treści zawartej na stronie nr. 3
Shipping Information Unpacking and Inspection You should inspect your equipment for possible shipping damage. Thoroughly check the equipment for any damage that might have occurred in transit, such as broken or loose wiring and components, loose hardware and mounting screws, etc. In the Event of Shipping Damage According to the contract terms and conditions of the Carrier, the responsibility of the Shipper ends at the time and place of shipment. Notify the transportation company’s local
Streszczenie treści zawartej na stronie nr. 4
Table of Contents Chapter 1: Safety Instructions ................................................... 6 1-1 How to Use This Manual .............................................................................................6 Safety Symbols Used in this Manual.....................................................................6 1-2 Explanations and Information......................................................................................7 1-3 For Your Safety .......................
Streszczenie treści zawartej na stronie nr. 5
CHAPTER 6: TECHNICAL DATA............................................. 10 * Optional 230 V, AC, PE, 50/60 Hz.....................................................................................10 6-1 Dimension Sheet .........................................................................................................10 6-2 Spare Parts Lists .......................................................................................................10 6-3 Quick Start Guide –SVL Self Conta
Streszczenie treści zawartej na stronie nr. 6
Chapter 1: Safety Instructions 1-1 How to Use This Manual Use this manual as a guide and reference for installing, operating, and maintaining your loading system. The purpose is to assist you in applying efficient, proven techniques that enhance equipment productivity. This manual covers only light corrective maintenance. No other maintenance should be undertaken without first contacting a service engineer. The Functional Description section outlines models covered, standard features,
Streszczenie treści zawartej na stronie nr. 7
DANGER! DANGER indicates an imminently hazardous situation that, if not avoided, will result in death or serious injury. WARNING! WARNING indicates a potentially hazardous situation or practice that, if not avoided, could result in death or serious injury. Caution! CAUTION indicates a potentially hazardous situation or practice that, if not avoided, may result in minor or moderate injury or in property damage. 1-2 Explanations and Information Various terms and designations are used
Streszczenie treści zawartej na stronie nr. 8
1-3 For Your Safety How to Use This Manual • Please read this manual carefully before initial operation. Understanding the instructions and equipment will help to avoid injuries as well as damage to equipment. If you have questions, contact the manufacturer. • The operators of this unit must be at least 16 years old. • Store this manual near the site of the machine so that it is readily available to the operators. Faulty operation may lead to accidents! • The manual in provided on a C
Streszczenie treści zawartej na stronie nr. 9
• Observe the safety instructions for the connected units. Maintenance Responsibility • Before beginning maintenance work: Assign a supervisor. Inform all other responsible operating personnel. Turn off the main power supply.(If required) Set all compressed air lines on the unit at zero pressure. Repair work should ONLY be done by qualified personnel. • ALWAYS turn off the main supply for all electrical work to avoid risk of death or injury. • NEVER operate on a unit that is part
Streszczenie treści zawartej na stronie nr. 10
Chapter 2: Installation 2-1 General Information Unpack all parts of the single conveyor unit and make sure that every thing is available: • One material receiver with level sensor • Correct type of mounting flange (direct mount, bin mount, or sight glass mount) • Control assembly (one per venturi) • One venturi assembly (wand or grinder/take-off) • One section of vinyl flexible hose with two hose clamps (per venturi) • One length compressed-air poly tubing (per venturi) • Operati
Streszczenie treści zawartej na stronie nr. 11
Figure 2.2: SVL-B Parts OR Shown with optional sight glass assembly Figure 2.3: SVL-C Parts OR OR Shown with optional sight glass assembly SVL-A, SVL-B, SVL-C, & SVL-D Self-Contained Material Loaders - Venturi Style 11 of 49
Streszczenie treści zawartej na stronie nr. 12
2-2 Installing the Material Receiver The self contained material loader can be installed directly on the processing machine. Make sure that all connections are tight so that the conveying performance is not impaired. The material receiver is equipped with a mounting flange. Depending on the position, drill the holes for fastening the conveyor hopper to the processing machine. One of 2 standard bolt patters may be used, sight glass or bin mounted.(as shown in fig. 2.4) Mount the mat
Streszczenie treści zawartej na stronie nr. 13
Sight Glass Mounting Flange SVL-A, SVL-B, SVL-C, & SVL-D Self-Contained Material Loaders - Venturi Style 13 of 49
Streszczenie treści zawartej na stronie nr. 14
Figure 2.5: Flange Mount Figure 2.7: Sight Glass Mount to Digital Dosing Feeder Figure 2.6: Sight Glass Mount Figure 2.8: Standard Mount for SF-1 Feeder Note: Optional cover adapters may be required. SVL-A, SVL-B, SVL-C, & SVL-D Self-Contained Material Loaders - Venturi Style 14 of 49
Streszczenie treści zawartej na stronie nr. 15
2-3 Installing the Control Assembly Install the control assembly at a freely accessible site. Check the length of the connection cable and the length of the supplied hoses to the venturi assemblies. During installation of equipment, check the length of the air supply lines. In some cases, longer air supply lines may be required. Figure 2.9: Control Assembly and Mounting Bracket Shop Air To Venturi Assembly Control Mounting Bracket SVL-A, SV
Streszczenie treści zawartej na stronie nr. 16
2-4 Connecting the Compressed Air Supply Before connecting the compressed air supply, check the following: Check compressed air piping for correct installation and assembly. Check the fittings, length and quality of the hose connections for agreement with requirements. Check all compressed air lines for leakages. Supply clean, dry (non-lubricated) compressed air with 70-90 psi (5-6 bar) system pressure. The air should be free of oil and water. 1. Find the compressed air hos
Streszczenie treści zawartej na stronie nr. 17
2-5 Connecting Material Lines Typical SVL Loader installations use flex hose to connect the loader to the venturi. Caution! The material hose should be as straight as possible. Avoid loops and S-curves in flexible hose. This can hurt conveying performance. 1. Attach flex hose over the inlet stub of the loader. Secure the hose with the provided hose clamp. The hose should fit over the inlet stub at least 1 inch. Position the hose clamp at least ¼ inch from the end of the inlet.
Streszczenie treści zawartej na stronie nr. 18
SVL-C (Two inlet) Installation Any SVL loader may be equipped for “ratio” or proportioning loading so that two materials (usually virgin and regrind) may be loaded simultaneously. The equipment for this function consists of a “Y” tube and coupler that is installed on the inlet stub of the loader, two controls (one for each component,) a pick-up device (feed tube), a second venturi and both compressed air lines and material hoses. If included at the time of original purchase, all of thes
Streszczenie treści zawartej na stronie nr. 19
2-6 Electrical Connection The operating voltage is 115 or 230 VAC, AC, PE, 50/60 Hz. Special voltages available by request. The connected load is approximately 2 Watts. The connection is made using a main connector. A separate protection of the socket is not necessary. Connect the plug of the sensor cable to the control unit. Plug the main connector into a corresponding socket. Make sure all equipment is properly grounded. WARNING! Check with the local electricity board fo
Streszczenie treści zawartej na stronie nr. 20
Chapter 3: Functional Description 3-1 Operational Summary Once the control switch(s) is turned on, the SVL loader uses a solid state sensor to determine if material is needed at the material destination (hopper, bin, sight glass, etc.) If the sensor “sees” material, the loader will remain in an “at rest” mode with its solenoid de-energized and no compressed air flowing. Once the material level drops (typically due to process consuming material) and the SVL sensor no longer “sees” ma