INSTALLATION / USER MANUAL
Digital Energy LP 11U
Uninterruptible Power Supply
5-6-8-10 kVA
GE Digital Energy
General Electric Company Telephone +41 (0)91 / 850 51 51
CH - 6595 Riazzino (Locarno) Fax +41 (0)91 / 850 51 44
Switzerland Website www.gedigitalenergy.com
LP 11U UPS Technology for the Digital World. ver 3.0 - US
Streszczenie treści zawartej na stronie nr. 2
Streszczenie treści zawartej na stronie nr. 3
Digital Energy LP Series g OPERATING MANUAL Digital Energy LP 5/6/8/10-11U UPS LX-DOC File: OPM_LPU_11U_5K0_10K_1US_V030 Manual version 3.0 Software version R2.11 INSTALLATION / USER MANUAL Digital Energy LP 11U Uninterruptible Power Supply 5-6-8-10 kVA Preface We thank you for selecting a General Electric Digital Energy LP Series Uninterruptible Power Supply (UPS) and recommend that you read these instructions carefully before installation and start-
Streszczenie treści zawartej na stronie nr. 4
Digital Energy LP Series g CONTENTS 1 IMPORTANT SAFETY INSTRUCTIONS.....................................4 1.1 Save these instructions 1.2 General 1.3 Installation 1.4 Storage 1.5 Batteries 2 INTRODUCTION .........................................................................6 2.1 Description 2.2 Warranty 3 FUNCTIONAL EXPLANATION....................................................7 3.1 Principles of Operation 3.2 Normal Conditions 3.3 Utility Failure 3.4 A
Streszczenie treści zawartej na stronie nr. 5
Digital Energy LP Series g 6 INTERFACING FEATURES......................................................35 6.1 RS232/Contact Interface 6.2 Emergency Shutdown 6.3 Relay Card (optional) 6.4 SNMP Interface (optional) 7 OPTIONAL FEATURES.............................................................36 7.1 Extended Runtime 7.2 Plug-in Cards 7.3 RPA-Facility (Redundant Parallel Architecture) 7.4 PDM: Power Distribution Module 7.5 Seismic Anchors 8 MAINTENANCE.........
Streszczenie treści zawartej na stronie nr. 6
Digital Energy LP Series g 1 - Important Safety Instructions 1.1 Save these instructions This manual contains important instructions that should be followed during installation and maintenance of the UPS and batteries. It also gives all necessary information about the correct use of the UPS. Full understanding and compliance of the safety instructions and warnings contained in this manual are the ONLY CONDITION to avoid any dangerous situation during installation, operat
Streszczenie treści zawartej na stronie nr. 7
Digital Energy LP Series g • It is important that the unit has adequate ventilation. Maintain air movement around and through the unit. Do not block the air vents. • Avoid placing the unit in direct sunlight or near heat sources. • Do not plug household appliances such as electric heaters, toasters or vacuum cleaners into the UPS. The UPS output is intended to be used only for electronic loads such as computers and telecommunications equipment. • Use insulated copper input and outpu
Streszczenie treści zawartej na stronie nr. 8
Digital Energy LP Series g 2 - Introduction 2.1 Description More than ever before, today's advanced electronic equipment, with complex integrated circuits and other sensitive electronics, needs a stable and continuous AC power supply to operate correctly. While the power coming from the wall outlet is often unreliable, a GE Digital Energy LP-U UPS provides the security of completely uninterrupted power. A compact, truly on-line system, the LP-U UPS protects your equipm
Streszczenie treści zawartej na stronie nr. 9
Digital Energy LP Series g 3 - Functional Explanation 3.1 The Principles of Operation The UPS stores electric energy in batteries. This allows the UPS to supply output power even when the incoming utility power is cut off completely. Energy is stored as Direct Current (DC), while input and output energy must be Alternating Current (AC). Therefore the UPS contains an input converter (AC to DC) and an output converter (DC to AC). (fig.2) 3.2 Normal Conditions Under norm
Streszczenie treści zawartej na stronie nr. 10
Digital Energy LP Series g 3.4 Automatic Bypass Switch If the output converter is unable to deliver the demanded output power because of overload or overtemperature, the automatic bypass switch will automatically transfer the load to the utility. When the situation is corrected the UPS will switch back to normal operation, i.e. the load is tranferred back to the output converter. Though the automatic bypass switch is shown as a simple mechanical switch in figures 2-5, the transfers a
Streszczenie treści zawartej na stronie nr. 11
Digital Energy LP Series g 4 - Installation 4.1 Transport NOTE: Transport the UPS only in upright position. Check for sufficient floor and elevation loading capacity. Move the UPS in its original package to the final destination room. Do not stack other package on top. 4.2 Unpacking Cut the two wrapping bands, and remove the shipping box. Loosen the four bolts with which the UPS is fixed to the pallet. Remove the UPS from the pallet. BE CAREFUL! Pay attention to
Streszczenie treści zawartej na stronie nr. 12
Digital Energy LP Series g • Ensure that the total power requirement of the equipment to be protected does not exceed the rated output power of the UPS. (output power for your unit is indicated on the rating label on the rear panel). • When using the 120V split phase outputs make sure that the load per 120V output does not exceed half the rating. • The UPS may only be installed by trained personnel. The UPS must be grounded when in use: Connect the UPS to a single phase, three
Streszczenie treści zawartej na stronie nr. 13
Digital Energy LP Series g 4.5.1 Installation Procedures 4.5.1.1 Standard installation procedure: input voltage 208-240Vac, output voltage 120/208/220/230/240Vac. If a battery extension pack is to be installed, please proceed with section 4.5.5. If 2, 3 or 4 parallel operating units will be installed, please proceed with section 4.5.6. The numbers between (brackets) refer to figure 19 in section 5.1. 1. Mount the levellers: position A to fix the UPS to the floor, position B t
Streszczenie treści zawartej na stronie nr. 14
Digital Energy LP Series g 4.5.1.2 Installation procedure: input voltage 120Vac (optional, 5-6kVA only), output voltage 120/208/220/230/240Vac. If a battery extension pack is to be installed, please proceed with section 4.5.5. If 2, 3 or 4 parallel operating units will be installed, please proceed with section 4.5.6. The numbers between (brackets) refer to figure 19 and 20 in section 5.1. 1. Mount the levellers: position A to fix the UPS to the floor, position B to lift the cas
Streszczenie treści zawartej na stronie nr. 15
Digital Energy LP Series g 4.5.2 Available input voltages: hardware modifications The following input voltages are possible: 208, 240 Vac (see 4.5.2.1) and 120 Vac (see 4.5.2.2) 4.5.2.1 Input voltage 208 or 240Vac. 1. Input voltage is 208 Vac. This is the factory setting. Proceed with step 3. 2. Input voltage is 240Vac. In this case the bypass tap on the output transformer must be changed. Please refer to fig. 8 and 8a. Proceed as follows: 2.1 Remove the yellow wire B from f
Streszczenie treści zawartej na stronie nr. 16
Digital Energy LP Series g 4.5.2.2 Input voltage 120Vac (optional, 5/6kVA only). LP-U UPS equipped with an (optional) step-up transformer (5/6kVA models only) can be connected to an input voltage of 120Vac. 1. Connect the utility supply wires to terminals L, N and GND (equipment grounding conductor). See figure 10. Ground connection is essential! Figure 10. LP 5/6-11U: 120Vac Input terminals 2. For the output voltage proceed with 4.5.3. 4
Streszczenie treści zawartej na stronie nr. 17
Digital Energy LP Series g 4.5.3.2 Output voltage 120Vac split-phase 1. The factory setting of the output tap (208Vac) has to be changed to 240Vac. Please refer to fig. 12 and 12a. Proceed as follows: 1.1 Remove the yellow wire L from faston 67 (connect) and place this wire on faston 65 (park). 1.2 Remove the brown wire F from faston 66 (park) and place this wire on faston 67 (connect). Output tap factory setting: 208 Volt Output tap changed to 240 Volt (park) (park)
Streszczenie treści zawartej na stronie nr. 18
Digital Energy LP Series g 4.5.3.3 Output voltage 220/230/240Vac 1. The factory setting of the output tap (208Vac) has to be changed to 240Vac. Follow the procedure as described in section 4.5.3.2 steps 1.1 and 1.2. 2. Connect the load wires between the terminals 1 (L1) and 4 (N). Connect the ground wire to terminal 5. Ground connection is essential! Do not remove the link between terminals 2 and 3. See figure 14. Figure 14. LP 5/6/8/10-11U: 220/230/240 Vac output
Streszczenie treści zawartej na stronie nr. 19
Digital Energy LP Series g For LP 8/10kVA: 8. Remove all links between the terminals. 9. Split both the load wires and spread one wire over terminal 1-2 and the other over 3-4 respectively. 10. Connect the ground wire to terminal 5. Ground connection is essential! See figure 15a. 11. Return to either 4.5.1.1 step 5 or 4.5.1.2 step 5 Figure 15a. Output cable splitting for 8/10kVA 120V 2-wire 4.5.4 Input/output voltages: Software modification. NOTE: follow
Streszczenie treści zawartej na stronie nr. 20
Digital Energy LP Series g 4.5.5 Installation of GE Digital Energy LP-U battery extension pack(s) The numbers between (brackets) refer to figures 19-21 in section 5.1. Battery extension pack(s) are shipped with all materials necessary to connect them to the UPS. The pack(s) can be connected to the DC connector (15) at the rear panel of the UPS. Be sure to switch off the UPS before proceeding: be sure that the UPS can be switched off without causing damage to the load, and turn all c