Streszczenie treści zawartej na stronie nr. 1
Redring Hotbox Boiler
Models L318 and LP330
User and Installer Instructions
Please keep these instructions safe, should you move house,
please hand them over to the next occupier.
COMPLIANT TO : BS EN 60335-2, BS EN 55014-2 and BS EN 50081-1
Page 1 of 13
Streszczenie treści zawartej na stronie nr. 2
Redring Hotbox Boiler THE HALOGEN BOILER, L318, LP330 HALOGEN POWERED WALLMOUNTED BOILER USER&INSTALLERS INSTRUCTIONS PLEASE KEEP THESE INSTRUCTIONS SAFE. SHOULD YOU MOVE HOUSE, PLEASE HAND THEM OVER TO THE NEXT OCCUPIER. 1. Introduction The Halogen Boiler is a wall-mounted appliance, suitable for installation onto small sealed heating systems. It incorporates all the components for sealed system requirements, these include, pressure gauge, pressure relief valve
Streszczenie treści zawartej na stronie nr. 3
Overall Dimensions & Minimum Clearances Clearances Operational Maintenance mm 5 5 Side Top mm 200 200 Bottom mm 200 200 Front mm 5 500 3. Installation Requirements Statutory Requirements The installation should also be in accordance with the relevant recommendations in the current editions of the following British Standards: BS 7074: Pt 1 Expansion vessels and ancillary equipment for sealed water systems BS 5449 Forced circulation hot water systems for do
Streszczenie treści zawartej na stronie nr. 4
If the boiler is to be placed in a cupboard this cupboard should not be used as a storage cupboard. Ventilation should be provided as detailed below. Ventilation This boiler does not require a purpose provided air ventilation in the room, however it does require room air to circulate through the boiler to ensure the convection heat output performance is maintained. If the boiler is installed in an enclosure or small cupboard, there must be an equivalent ventilation free area in th
Streszczenie treści zawartej na stronie nr. 5
Example: 30L system total capacity requires an expansion vessel capacity of 30 x 0.0833 = 2.5 litres with a 0.5 bar vessel charge and system cold fill pressure. Filling Point The heating system must be provided with a suitable filling mechanism to both complete the initia l fill and top up the system if necessary. The filling device must comply with Water Supply (water fittings) Regulations and the local Water Authority Regulations. Refer to BS 5376: for guidance. Typical Syste
Streszczenie treści zawartej na stronie nr. 6
Location Before installing the boiler check that the chosen location is suitable, ensuring a dequate clearance is available for both installation and servicing. The appliance must be mounted on a flat vertical wall. Prepare the Appliance Remove the front panel by unscrewing the two screws at the bottom of the case. Rotating the case forwards at the bottom 10 mm and lifting it off in an upward direction. Preparing the Wall Using the diagrams earlier in these instructions, or the ap
Streszczenie treści zawartej na stronie nr. 7
Allow the heating system to reach operating temperature and then examine for water leaks. Turn off the boiler and drain whilst still hot. Refill and vent the heating system ensuring all air is cleared from the system and the cold fill pressure is set at the design pressure. The pressure gauge should be at 0.5 bar. Set the indicator on the pressure gauge to co-inside with this initial cold fill pressure. Allow the appliance to operate to its maximum temperature to ensure corre
Streszczenie treści zawartej na stronie nr. 8
Replacing a bulb • Remove the lid from the bulb box, remove the faulty bulb and replace with a new bulb. Do not touch the bulb with bare fingers, as this will reduce the life of the bulb. Use clean tissue paper or similar to hold the bulb. • Check that the bulb is seated correctly on the contacts. • Replace the top of the bulb box, locating it onto the pins provided. Replacing a bulb temperature limit thermostat • The bulb temperature limit thermostat can only be replaced as a co
Streszczenie treści zawartej na stronie nr. 9
Replacing the expansion vessel • Isolate the boiler using the appliance isolation valves on the flow and return connections to the boiler. • Remove the expansion vessel from the pipe work. • Refit a replacement expansion vessel in reverse order using a recognised method of sealing the threaded joint. • Open the isolation valves, ensure the system cold fill pressure is correct, there are no water leaks and the system is correctly vented of all air. Replacing the pressure relief valve
Streszczenie treści zawartej na stronie nr. 10
Fault Finding Chart If the radiators do not get hot or do not reach the boiler flow operating temperature follow the guide below to establish the possible cause. Page 10 of 13
Streszczenie treści zawartej na stronie nr. 11
9. Wiring Diagram Page 11 of 13
Streszczenie treści zawartej na stronie nr. 12
10. Spare Parts Information Item Part Number Description Quantity 1 300 W linear halogen bulb Model dependant 97392070. 2 Hot box replacement head 1 97392071. 3 Pressure relief valve 1 97392072. 4 Pressure gauge 1 97392073. 5 Control thermostat 1 97392074. 6 Limit Thermostat Model dependant 97392075. 7 Overheat thermostat 1 97392076. 8 Water Pump 1 97392077. 9 2lt Expansion Vessel 1 97392078. 10 Neon Indicator 1 97392079. 11 Air Vent 1 97392080. 12 Rocker switch 1
Streszczenie treści zawartej na stronie nr. 13
GUARANTEE Terms and Conditions for UK & ROI (outside UK & ROI contact your local distributor) We, Applied Energy Products Limited, guarantee this product for domestic use only, for the period of 12 months from the date of purchase. Within the guarantee period we will resolve, free of charge, any manufacturing defects in the product resulting from faulty workmanship or material on condition that:- a) The appliance has been correctly installed in accordance with our instructions and