Streszczenie treści zawartej na stronie nr. 1
You can rely on
Installation & Service Instructions Heatmax
Combi HE
Range
Condensing
Combination Boiler
These instructions include the Benchmark Commissioning
Checklist and should be left with the user for safe keeping.
© Baxi Heating UK Ltd 2012
Streszczenie treści zawartej na stronie nr. 2
Natural Gas Building Regulations and the Benchmark Commissioning Checklist Potterton Heatmax Combi 24 HE o G.C.N 47-393-27 Building Regulations (England & Wales) require notification of Potterton Heatmax Combi 28 HE o the installation of a heating appliance to the relevant Local G.C.N 47-393-28 Potterton Heatmax Combi 33 HE Authority Building Control Department. From 1 April 2005 this o G.C.N 47-393-29 can be achieved via a Competent Persons Self Certification Scheme as an option to notifying th
Streszczenie treści zawartej na stronie nr. 3
Installer Notification Guidelines Choose Building Regulations Notification Route Competent Person's Building Control Self Certification Scheme Install and Commission this Contact your relevant Local appliance to manufacturer's Authority Building Control instructions (LABC) who will arrange an inspection or contact a government approved inspector Complete the Benchmark Checklist If you notify via the ‘Gas Safe Register’, the register will issue the Building Regulations Install and Commission thi
Streszczenie treści zawartej na stronie nr. 4
Legislation IMPORTANT - Installation, Commissioning, Service & Repair This company declare that no substances harmful to health are contained in the appliance or used during appliance This appliance must be installed in accordance with the manufacturer’s instructions and manufacture. the regulations in force. Read the instructions fully before installing or using the appliance. The appliance is suitable only for installation in GB and IE and should be installed in accordance with the rules in fo
Streszczenie treści zawartej na stronie nr. 5
Safe Manual Handling General The following advice should be adhered to, from when first handling the boiler to the final stages of installation, and also during maintenance. Most injuries as a result of inappropriate handling and lifting are to the back, but all other parts of the body are vulnerable, particularly shoulders, arms and hands. Health & Safety is the responsibility of EVERYONE. There is no ‘safe’ limit for one man - each person has different capabilities. The boiler should be handl
Streszczenie treści zawartej na stronie nr. 6
CONTENTS Section Page 1.0 Introduction 7 2.0 General Layout 8 3.0 Appliance Operation 9 4.0 Technical Data 10 5.0 Dimensions and Fixings 11 6.0 System Details 12 7.0 Site Requirements 15 8.0 Flue Options 21 9.0 Plume Displacement 25 10.0 Installation 29 11.0 Commissioning 34 12.0 Completion 36 13.0 Servicing 37 14.0 Changing Components 39 15.0 Setting the Gas Valve 48 16.0 Electrical 49 17.0 Short Parts List 50 18.0 Fault Finding 51 19.0 Pages for Notes 57 Benchmark Checklist 58 6 © Baxi Heating
Streszczenie treści zawartej na stronie nr. 7
1.0 Introduction 1.1 Description 1. The Potterton Heatmax Combi HE is a fully automatic gas fired wall mounted condensing combination boiler. It is room sealed and fan assisted, and will serve central heating and Case Front Panel mains fed domestic hot water. 2. The boiler is set to give a maximum output of :- 24 models - 24 kW DHW 21 kW CH (Condensing) 28 models - 28 kW DHW 25.9 kW CH (Condensing) 33 models - 33 kW DHW 30.3 kW CH (Condensing) 3. It is designed for use on Natural Gas (G20). 4.
Streszczenie treści zawartej na stronie nr. 8
2.0 General Layout 2.1 Layout 23 1. Expansion Vessel 1 15 2. Automatic Air Vent (Pump) 3. DHW Plate Heat Exchanger / Automatic Bypass 22 4. Circulation Pump 5. Drain Off Point 14 6. Pressure Relief Valve 7. Optional Integral Timer Position 13 8. Central Heating System Pressure Gauge 21 9. PCB 16 10. Control Box 11. 3-Way Valve Assembly 20 12. Condensate Trap 13. Flame Sensing Electrode 14. Spark Electrode 28 15. Primary Heat Exchanger 16. Fan Assembly 17. On/Off/Reset Selector Switch Knob 18. Ce
Streszczenie treści zawartej na stronie nr. 9
3.0 Appliance Operation 1 Central Heating Circuit 3.1 Central Heating Mode (Fig. 2) 1. With a demand for heating, the pump circulates water through the primary circuit. 2 2. Once main burner ignites the fan speed controls the gas rate to maintain the heating temperature measured by the 3 4 7 temperature sensor. 26 20 5 6 3. When the flow temperature exceeds the setting temperature
Streszczenie treści zawartej na stronie nr. 10
4.0 Technical Data 4.1 Heatmax Combi 24, 28 & 33 Appliance Type C C C 13 33 53 NO Class 5 Inlet Pressure (Natural Gas - G20) x mbar 20 Appliance Category CAT I 2H Central Heating Primary Circuit Pressures Injector (Natural Gas - G20) Heat Input CH (Net) Max Min bar 7.5mm (24&28 model) 12mm(33 model) 24 model kW 20.5 7 Safety Discharge 3 Electrical Supply 230V~ 50H z Max Operating 2.5 28 model kW 24.7 9 (Appliance must be connected to an Min Operating 0.5 33 model kW 28.9 9.7 earthed
Streszczenie treści zawartej na stronie nr. 11
5.0 Dimensions and Fixings Dimensions A 780mm E At Least 1.5° G B 345mm C 450mm D 116mm Ø Min. A E 185mm (207mm for 80/125mm flue systems) F 145mm G 131mm B H 180mm 360° Orientation H ØD C Tube Ø 100mm F Tap Rail 32.5 mm Condensate Drain 65 mm 65 mm 65 mm 65 mm 65 mm Heating Heating Domestic Hot Gas Cold Water Pressure Relief Return Flow Water Outlet Inlet Inlet Valve (22mm) (15mm) (22mm) (15mm) (22mm) (15mm) 11 © Baxi Heating UK Ltd 2012
Streszczenie treści zawartej na stronie nr. 12
6.0 System Details 6.1 Information 1. The Potterton Heatmax Combi HE Condensing Combination IMPORTANT: If the boiler is installed at a high point in Boiler is a ‘Water Byelaws Scheme - Approved Product’. To comply with the Water Byelaws your attention is drawn to the system it is strongly recommended that Automatic the following installation requirements and notes (IRN). Air Vent Kit 720004701 is fitted. a) IRN 001 - See text of entry for installation requirements and notes. b) IRN 302 - B
Streszczenie treści zawartej na stronie nr. 13
6.0 System Details 6.5 System Filling and Pressurising 1. A filling point connection on the central heating return Double Stop Stop Check pipework must be provided to facilitate initial filling and Valve Valve Valve pressurising and also any subsequent water loss replacement/refilling. A filling loop & instructions are provided with the boiler. Temporary 2. The filling method adopted must be in accordance with all DHW CH Hose relevant water supply regulations and use approved Mains Return Inlet
Streszczenie treści zawartej na stronie nr. 14
6.0 System Details 6.8 Domestic Hot Water Circuit (Fig. 7) 1. All DHW circuits, connections, fittings, etc. should be fully in accordance with relevant standards and water supply regulations. Other Tap Outlets 2. Your attention is drawn to: for GB: Guidance G17 to G24 and recommendation R17 to Boiler Expansion R24 of the Water Regulations Guide. Vessel for IE: the current edition of I.S. 813 “Domestic Gas Installations”. 3. The Water Regulations recommendations for England and Check Wales prohi
Streszczenie treści zawartej na stronie nr. 15
7.0 Site Requirements 5mm Min 450mm 5mm Min 7.1 Location 1. The boiler may be fitted to any suitable wall with the flue 200mm Min passing through an outside wall or roof and discharging to (300mm Min if using 80/125mm atmosphere in a position permitting satisfactory removal of flueing system) combustion products and providing an adequate air supply. The boiler should be fitted within the building unless otherwise protected by a suitable enclosure i.e. garage or outhouse. (The boiler may be fit
Streszczenie treści zawartej na stronie nr. 16
7.0 Site Requirement 7.3 Ventilation of Compartments 1. Where the appliance is installed in a cupboard or compartment, no air vents are required. 2. BS 5440: Part 2 refers to room sealed appliances installed in compartments. The appliance will run sufficiently cool without ventilation. Gas Service Cock 7.4 Gas Supply 1. The gas installation should be in accordance with the relevant standards. In GB this is BS 6891. In IE this is the Fig. 10 current edition of I.S. 813 “Domestic Gas Installations
Streszczenie treści zawartej na stronie nr. 17
50mm per metre of pipe run 2.5° Minimum fall 50mm per metre of pipe run 2.5° Minimum fall Examples are shown of the following methods of termination:- i) to an internal soil & vent pipe 7.0 Site Requirements ii) via an internal discharge branch (e.g. sink waste) downstream of the trap iii) to a drain or gully iv) to a purpose made soakaway 7.7 Condensate Drain v) pumped into an internal discharge branch (e.g. sink waste) downstream of the trap FAILURE TO INSTALL THE CONDENSATE vi) pumped into an
Streszczenie treści zawartej na stronie nr. 18
50mm per metre of pipe run 2.5° Minimum fall 50mm per metre of pipe run 2.5° Minimum fall 7.0 Site Requirements 7.7 Condensate Drain (cont.) iii) Termination to a drain or gully 11. When discharging condensate into a soil stack or waste Boiler pipe the effects of existing plumbing must be considered. If soil pipes or waste pipes are subjected to internal pressure Pipe must terminate above fluctuations when WC's are flushed or sinks emptied then water level but below back-pressure may force water
Streszczenie treści zawartej na stronie nr. 19
50mm per metre of pipe run 2.5° Minimum fall 50mm per metre of pipe run 2.5° Minimum fall 50mm per metre of pipe run 2.5° Minimum fall v) pumped into an internal discharge branch (e.g. sink waste) downstream of the trap 7.0 Site Requirements Pipe must terminate above Sink 7.7 Condensate Drain (cont.) water level but below surrounding surface. Cut end at 45° 12. A boiler discharge pump is available, ‘MULTIFIT’ part no. 720648301. This pump will dispose of both condensate & high temperature water
Streszczenie treści zawartej na stronie nr. 20
Terminal Position with Minimum Distance (Fig. 18) (mm) 1 A Directly below an opening, air brick, opening 7.0 Site Requirements windows, etc. 300 1 B Above an opening, air brick, opening window etc. 300 1 C Horizontally to an opening, air brick, opening window etc. 300 7.8 Flue 2 D Below gutters, soil pipes or drain pipes. 25 (75) 2 E Below eaves. 25 (200) NOTE: Due to the nature of the boiler a plume of water 2 F Below balconies or car port roof. 25 (200) vapour will be discharged from the flue.