Streszczenie treści zawartej na stronie nr. 1
LIMITED WARRANTY Goldline warrants its Aqua Rite, Aqua Rite Pro, Aqua Trol, Aqua
Logic and Pro Logic products (products with Goldline part numbers starting with AQ-RITE-
, AQ-RT-PRO, AQ-TROL-, AQ-LOGIC-, AQL-P-, AQL-PS-, AQL-CL-, PL-P-, PL-PS-,
and HPC-2) to be free from defects in material or workmanship, under normal use and
service:
For three years from the date of the initial system installation on private, residential
swimming pools within the USA or Canada and one year from the date of ini
Streszczenie treści zawartej na stronie nr. 2
IMPORTANT SAFETY INSTRUCTIONS When using this electrical equipment, basic safety precautions should always be followed, including the following: Failure to follow instructions may result in injury. READ AND FOLLOW ALL INSTRUCTIONS 1. Goldline Model GVA-24 must be installed by qualified personnel in compliance with all applicable electrical codes. 2. Disconnect electrical power before servicing unit. Replace all screws and covers before reconnecting unit to electric power. 3. WARNING: To reduce
Streszczenie treści zawartej na stronie nr. 3
Description 5. The toggle switch on the bottom of the valve actuator can be used to verify if the The GVA-24 Goldline Valve Actuator rotates 2-port and 3 port valves automatically. new adjustment is correct (flip between ON1 and ON2). Use it with the Aqua Logic system or GL-235 Solar Controller to automate pool/spa operation, solar heating, cleaner operation, water features, or a variety of other uses. 6. Replace cover and handle and tighten screws and Locking Knob. The industry standard configu
Streszczenie treści zawartej na stronie nr. 4
Using the chart below to determine correct cam setting using standard clock posi- Mounting Instructions tions. Refer to the "Cam Adjustment" section in this manual to change upper and If the valve is plumbed with Port 2 as the common port and the main body of the lower cam positions if necessary. actuator is mounted over Port 2 (standard mounting), there is no need to adjust the actuator cams. PORT GVA PORT WHERE WHERE MOUNTING CAM SETTING 1. Remove Locking Knob and handle. Set aside for reins