Southbend HEAVY DUTY COUNTERLINE HDG-48 user manual

User manual for the device Southbend HEAVY DUTY COUNTERLINE HDG-48

Device: Southbend HEAVY DUTY COUNTERLINE HDG-48
Category: Cooktop
Manufacturer: Southbend
Size: 3.46 MB
Added : 6/25/2013
Number of pages: 48
Print the manual

Download

How to use this site?

Our goal is to provide you with a quick access to the content of the user manual for Southbend HEAVY DUTY COUNTERLINE HDG-48. Using the online preview, you can quickly view the contents and go to the page where you will find the solution to your problem with Southbend HEAVY DUTY COUNTERLINE HDG-48.

For your convenience

If looking through the Southbend HEAVY DUTY COUNTERLINE HDG-48 user manual directly on this website is not convenient for you, there are two possible solutions:

  • Full Screen Viewing - to easily view the user manual (without downloading it to your computer), you can use full-screen viewing mode. To start viewing the user manual Southbend HEAVY DUTY COUNTERLINE HDG-48 on full screen, use the button Fullscreen.
  • Downloading to your computer - You can also download the user manual Southbend HEAVY DUTY COUNTERLINE HDG-48 to your computer and keep it in your files. However, if you do not want to take up too much of your disk space, you can always download it in the future from ManualsBase.
Southbend HEAVY DUTY COUNTERLINE HDG-48 User manual - Online PDF
Advertisement
« Page 1 of 48 »
Advertisement
Print version

Many people prefer to read the documents not on the screen, but in the printed version. The option to print the manual has also been provided, and you can use it by clicking the link above - Print the manual. You do not have to print the entire manual Southbend HEAVY DUTY COUNTERLINE HDG-48 but the selected pages only. paper.

Summaries

Below you will find previews of the content of the user manuals presented on the following pages to Southbend HEAVY DUTY COUNTERLINE HDG-48. If you want to quickly view the content of pages found on the following pages of the manual, you can use them.

Abstracts of contents
Summary of the content on the page No. 1

IMPORTANT FOR FUTURE REFERENCE
Please complete this information and retain this
manual for the life of the equipment:
Model #: ___________________________
Serial #: ___________________________
Date Purchased: ____________________
OPERATOR’S MANUAL
Heavy Duty Counterline
Griddle Models Charbroiler Models Open Top Models
HDG-24 HDG-24E HDC-24 HDCL-24 HDO-12 HDO-24SU
HDG-36 HDG-36E HDC-36 HDCL-36 HDO-24 HDO-36SU
HDG-48 HDG-48E HDC-48 HDCL-48 HDO-36
HDG-60 HDG-60E



! WARNING
Improp

Summary of the content on the page No. 2

HEAVY DUTY COUNTERLINE SAFETY PRECAUTIONS Before installing and operating this equipment, be sure everyone involved in its operation is fully trained and aware of precautions. Accidents and problems can be caused by failure to follow fundamental rules and precautions. The following symbols, found throughout this manual, alert you to potentially dangerous conditions to the operator, service personnel, or to the equipment. This symbol warns of immediate hazards that will result in severe in

Summary of the content on the page No. 3

HEAVY DUTY COUNTERLINE TABLE OF CONTENTS Congratulations! You have purchased one of the finest pieces of commercial cooking equipment on the market. You will find that your new equipment, like all Southbend equipment, has been designed and manufactured to meet the toughest standards in the industry. Each piece of Southbend equipment is carefully engineered and designs are verified through laboratory tests and field installations. With proper care and field maintenance, you will experience

Summary of the content on the page No. 4

SPECIFICATIONS HEAVY DUTY COUNTERLINE SPECIFICATIONS NOTICE Installation must comply with National Fuel Gas Code, ANSI Z223.1, Natural Gas Installation Code, CAN/CGA-B149.1, or the Propane Installation Code, CAN/CGA-B149.2, as applicable. Local codes regarding installation vary greatly from one area to another. The National Fire Protection Association, Inc. states in its NFPA 96 latest edition that local codes are the “authority having jurisdiction” when it comes to installation requirem

Summary of the content on the page No. 5

SPECIFICATIONS HEAVY DUTY COUNTERLINE SPECIFICATIONS CLEARANCES ! WARNING There must be adequate clearance between units and adjacent construction. Clearance must also be provided for servicing and for operation. Measure back clearance from rear of 2" stand-off brackets. Minimum Clearances from COMBUSTABLE construction: Griddle Models Open Top Models Sides 12" 10" Back 8" 7" Minimum Clearances from NON-COMBUSTABLE construction: Griddle Models Charbroiler Models Open Top Models

Summary of the content on the page No. 6

SPECIFICATIONS HEAVY DUTY COUNTERLINE Figure 2 DIMENSIONS OF GRIDDLE MODELS 1.5" 24.0" 30.0" Top View Width (see table below) 31.5" 16.0" 15.1" 11.0" 10.0" 5.4" 2.0" 2.8" 29.4" Side View Front View Model Width Number and Size of Burners Total BTU HDG-24 & HDG-24E 24" 2 @ 30,000 60,000 HDG-36 & HDG-36E 36" 3 @ 30,000 90,000 HDG-48 & HDG-48E 48" 4 @ 30,000 120,000 HDG-60 & HDG-60E 60" 5 @ 30,000 150,000 CONSTRUCTION OF GRIDDLE MODELS The front, sides, and 5" riser are all stainles

Summary of the content on the page No. 7

SPECIFICATIONS HEAVY DUTY COUNTERLINE SPECIFICATIONS Figure 3 DIMENSIONS OF CHARBROILER MODELS 1.5" 21.5" 30.0" Top View Width (see table below) 31.5" 16.0" 15.1" 11.0" 10.0" 5.3" 2.0" 2.8" 29.4" Front View Side View Model Width Number and Size of Burners Total BTU HDC-24 & HDCL-24 24" 4 @ 20,000 80,000 HDC-36 & HDCL-36 36" 6 @ 20,000 120,000 HDC-48 & HDCL-48 48" 8 @ 20,000 160,000 CONSTRUCTION OF CHARBROILER MODELS The front, top-rail sides, and 5" riser are all stainless steel.

Summary of the content on the page No. 8

SPECIFICATIONS HEAVY DUTY COUNTERLINE Figure 4 DIMENSIONS OF OPEN TOP MODELS 3.9" 2.0" 24.4" Top View Width (see table below) 15.3" 2.8" 11.0" 9.0" 6.3" Front View Side View Model Width Number and Size of Burners Total BTU HDO-12 12.25" 2 @ 26,000 52,000 HDO-24 & HDO-24SU 24.5" 4 @ 26,000 104,000 HDO-36 & HDO-36SU 36.625" 6 @ 26,000 156,000 CONSTRUCTION OF OPEN TOP MODELS The front, top-rail sides, and 5" riser are all stainless steel. The rear and bottom panels are aluminized s

Summary of the content on the page No. 9

INSTALLATION HEAVY DUTY COUNTERLINE INSTALLATION INSTALLATION NOTICE Installation must comply with National Fuel Gas Code, ANSI Z223.1, Natural Gas Installation Code, CAN/CGA-B149.1, or the Propane Installation Code, CAN/CGA-B149.2, as applicable. These installation procedures must be followed by qualified personnel or warranty will be void. Local codes regarding installation vary greatly from one area to another. The National Fire Protection Association, Inc. states in its NFPA 96 lates

Summary of the content on the page No. 10

INSTALLATION HEAVY DUTY COUNTERLINE Step 2a: Installation on Countertop Legs To install the appliance using countertop legs, do the following: 1. Locate the box of four legs shipped with the appliance (if countertop legs were ordered). 2. Raise the appliance about 6" so that the legs can be screwed into the bottom near the corners. Lift the appliance only from the ends, never from the middle! Support the lifted appliance so that it will not fall while you are attaching the legs. 3. Scre

Summary of the content on the page No. 11

INSTALLATION HEAVY DUTY COUNTERLINE INSTALLATION Step 2b: Installation Directly on a Non-Combustible Countertop Surface The appliance may be installed directly onto a flat NON-COMBUSTIBLE surface, as follows: 1. Place the appliance in the position that it will be used. Lift the appliance only from the ends, never from the middle! 2. Connect the gas supply (see Step 4 on page 18), then return to this procedure. 3. Check that the appliance is in the position you want it to be in. 4. Seal t

Summary of the content on the page No. 12

Summary of the content on the page No. 13

INSTALLATION HEAVY DUTY COUNTERLINE INSTALLATION Step 2d: Installation on Floor Stand (24", 36", and 48" Models) The 24", 36", and 48" appliances may be installed on top of an optional floor stand (for 60" griddles, go to Step 2e on page 15). The floor stand is shipped in a separate crate and must be assembled, as follows: 1. Position the bottom-brace pieces on a flat surface, as shown in Figure 8 below. There are two bottom- side braces (items “A”), a bottom-front brace (item “B”), and an

Summary of the content on the page No. 14

Summary of the content on the page No. 15

Summary of the content on the page No. 16

INSTALLATION HEAVY DUTY COUNTERLINE Figure 11 J K P K I I H H P J L L N O M 7. Check the partially assembled stand to make sure that the legs are straight and that all corners are square. Now tighten all bolts, but do not over tighten. 8. If legs with casters were ordered, lift the stand and screw the caster assemblies into the bottom of the legs. The two casters with wheel-locks go on the front corner legs. After the stand is assembled, connect the required restraint to protect th

Summary of the content on the page No. 17

INSTALLATION HEAVY DUTY COUNTERLINE INSTALLATION Step 3: Attach Restraint for Appliances Mounted on Casters NOTICE For an appliance equipped with casters, (1) the installation shall be made with a connector that complies with the Standard for Connectors for Movable Gas Appliances, ANSI Z21.69 or Connectors for Moveable Gas Appliances, CAN/CGA-6.16, and a quick-disconnect device that complies with the Standard for Quick-Disconnect Devices for Use With Gas Fuel, ANSI Z21.41, or Quick Discon

Summary of the content on the page No. 18

INSTALLATION HEAVY DUTY COUNTERLINE 2. Install eye-bolt (item “F”) to a frame member on the rear of the appliance. After checking carefully behind the frame member for adequate clearance, drill a 1/4" hole through the frame member. 3. Thread hex nut (item “G”) and slide the washer (item “H”) onto the eye-bolt. Insert the eye-bolt through the 1/4" drilled hole and secure with a washer (item “H”) and nylon lock nut (item “I”). 4. Using the spring-loaded snap hooks, attach the restraining dev

Summary of the content on the page No. 19

INSTALLATION HEAVY DUTY COUNTERLINE INSTALLATION 5. Connect the vent line from the pressure regulator to the outdoors in accordance with local codes or, in the absence of local codes, with the National Fuel Gas Code, ANSI Z223.1, Natural Gas Installation Code, CAN/CGA-B149.1, or the Propane Installation Code, CAN/CGA-B149.2, as applicable. 6. Connect the gas inlet of the pressure regulator to the building’s supply system. No segment of the gas supply connection to the appliance should be s

Summary of the content on the page No. 20

INSTALLATION HEAVY DUTY COUNTERLINE Step 7: Final Installation Steps for Griddle Models This step applies only to the installation of griddle models. New griddles should be carefully tempered and cared for in order to avoid possible damage. To break in a new griddle, do the following: 1. Wipe the griddle surface clean. 2. Light all the griddle burners and turn them to 200°F for one hour. Then gradually bring each griddle up to frying temperature. 3. Spread three or four ounces of beef su


Alternative user manuals
# User manual Category Download
1 Southbend HDC-48 User manual Cooktop 0
2 Southbend HDCL-48 User manual Cooktop 2
3 Southbend HDG-60E User manual Cooktop 1
4 Southbend HDO-24 User manual Cooktop 1
5 Southbend HDG-24E User manual Cooktop 1
6 Southbend HDO-36SU User manual Cooktop 3
7 Southbend SGS-36E User manual Cooktop 1
8 Southbend SGS-24 User manual Cooktop 1
9 Southbend SGS-48E User manual Cooktop 1
10 Southbend SGS-60 User manual Cooktop 1
11 Southbend HDO-12 User manual Cooktop 2
12 Southbend HDCL-36 User manual Cooktop 1
13 Southbend HEAVY DUTY COUNTERLINE HDC-24 User manual Cooktop 0
14 Southbend HDO-36 User manual Cooktop 1
15 Southbend SGS-36 User manual Cooktop 1
16 AEG 34942G User manual Cooktop 19
17 AEG 231GR-M User manual Cooktop 8
18 AEG 34611C User manual Cooktop 3
19 Sony BM-575 User manual Cooktop 2
20 AEG FM600KM-B User manual Cooktop 2