Summary of the content on the page No. 1
Cisco Service Control Engine 1000 2xGBE
Quick Start Guide
Release 3.1
May 2007
Americas Headquarters
Cisco Systems, Inc.
170 West Tasman Drive
San Jose, CA 95134-1706
USA
http://www.cisco.com
Tel: 408 526-4000
800 553-NETS (6387)
Fax: 408 527-0883
Customer Order Number:
Text Part Number: OL-7822-06
Summary of the content on the page No. 2
THE SPECIFICATIONS AND INFORMATION REGARDING THE PRODUCTS IN THIS MANUAL ARE SUBJECT TO CHANGE WITHOUT NOTICE. ALL STATEMENTS, INFORMATION, AND RECOMMENDATIONS IN THIS MANUAL ARE BELIEVED TO BE ACCURATE BUT ARE PRESENTED WITHOUT WARRANTY OF ANY KIND, EXPRESS OR IMPLIED. USERS MUST TAKE FULL RESPONSIBILITY FOR THEIR APPLICATION OF ANY PRODUCTS. THE SOFTWARE LICENSE AND LIMITED WARRANTY FOR THE ACCOMPANYING PRODUCT ARE SET FORTH IN THE INFORMATION PACKET THAT SHIPPED WITH THE PRODUCT AND ARE IN
Summary of the content on the page No. 3
CONTENTS CHAPTER 1 Prepare for Installation 1-1 Information About Preparing for Installation 1-1 Site Preparation and Unpacking 1-1 Tools and Parts 1-2 Prepare for Rack-Mount Installation 1-2 Workbench or Tabletop Installation 1-2 CHAPTER 2 Rack-Mount the SCE 1000 2-1 The SCE 1000 Mounting Brackets 2-1 Attach the Brackets to the SCE 1000 2-2 Installing the Crossrail Supports (Four-post rack only) 2-3 Assemble the Crossrail Supports 2-3 Attach the Crossrail Supports to the Rack 2-4 Mount the Syst
Summary of the content on the page No. 4
Contents EXAMPLE: 4-8 Step 4: Configuring Time Settings 4-8 EXAMPLE: 4-10 Step 5: Configuring the DNS Settings 4-10 EXAMPLE: 4-11 Step 6: Configuring the RDR Formatter Destination 4-12 EXAMPLE: 4-12 Step 7: Configuring Access Control Lists (ACLs) 4-12 Information About Access Control Lists 4-12 Examples 4-15 Step 8: Configuring SNMP 4-16 EXAMPLE: 4-19 Step 9: Configuring the Topology-Dependent Parameters 4-20 About the Topology-Dependent Parameters 4-20 Examples 4-21 Step 10: Completing and Savi
Summary of the content on the page No. 5
Contents EXAMPLE 2: 6-4 CHAPTER 7 Installing a Service Control Application 7-1 Advanced Configuration of the SCE Platform 7-1 Loading and Activating a Service Control Application 7-1 CHAPTER 8 Troubleshoot Startup Problems 9-1 SCE 1000 Operational Status 9-1 Identifying Startup Problems 9-3 CLI Commands for Troubleshooting 9-3 Cisco Service Control Engine 1000 2xGBE Quick Start Guide OL-7822-06 v
Summary of the content on the page No. 6
Contents Cisco Service Control Engine 1000 2xGBE Quick Start Guide vi OL-7822-06
Summary of the content on the page No. 7
CH A P T E R 1 Prepare for Installation This section contains warnings, information about tools and parts, site preparation information, and information for workbench or tabletop installation and rack-mount installation. This warning symbol means danger. You are in a situation that could cause bodily injury. Before you work on any equipment, be aware of the hazards involved with electrical circuitry and be familiar with standard practices for preventing accidents. To see translations of th
Summary of the content on the page No. 8
Chapter 1 Prepare for Installation Workbench or Tabletop Installation Tools and Parts Use the following list of tools and parts as a checklist for preparing for installing the SCE 1000 platform: Appropriate cables to connect the SCE 1000 to the network and console terminal Tape measure (optional) Level (optional) Number 1 Phillips screwdriver Number 2 Phillips screwdriver 1/4-inch flat-blade screwdriver 1/4-inch hex wrench Grounding kit (shipped with the SCE 1000) 12
Summary of the content on the page No. 9
Chapter 1 Prepare for Installation Workbench or Tabletop Installation An adequate chassis ground (earth) connection exists for the SCE 1000 platform. The SCE 1000 platform has at least 2 inches (5 cm) of clearance at each side and at least 5 inches (12.7 cm) of clearance at the rear to allow proper air flow. Step 1 Remove the adhesive strips from the four rubber feet and affix the feet onto the four marked locations on the bottom panel of the unit. Step 2 Place the SCE 1000 platform
Summary of the content on the page No. 10
Chapter 1 Prepare for Installation Workbench or Tabletop Installation Cisco Service Control Engine 1000 2xGBE Quick Start Guide 1-4 OL-7822-06
Summary of the content on the page No. 11
CH A P T E R 2 Rack-Mount the SCE 1000 This section provides information for rack-mounting the SCE 1000 platform. The SCE 1000 Mounting Brackets Attach the Brackets to the SCE 1000 Installing the Crossrail Supports (Four-post rack only) Mount the System to the Rack The SCE 1000 Mounting Brackets There are two standard types of equipment racks, and the appropriate brackets for each are provided in the enclosed kit. 19” rack with front rack posts — the mounting kit includes two mou
Summary of the content on the page No. 12
Cisco SCE 1000 Series 2xGBE PWR A PWR B STATUS BYPASS LINK RX TX LINK RX TX MNG 1 MNG 2 CONSOLE AUX RX MM TX RX MM TX LINK/ 10/100/ LINK/ 10/100/ ACTIVE 1000 ACTIVE 1000 GBE-1 SUB LINE NET Chapter 2 Rack-Mount the SCE 1000 Attach the Brackets to the SCE 1000 Figure 2-2 Mounting Bracket for 4-post Racks The SCE 1000 mounts to the two front rack posts with brackets that attach to the front of the SCE 1000 The inside width between the two posts or mounting strips (left and right) must be
Summary of the content on the page No. 13
Cisco SCE 1000 Series 2xGBE PWR A PWR B STATUS BYPASS LINK RX TX LINK RX TX MNG 1 MNG 2 CONSOLE AUX RX MM TX RX MM TX LINK/ 10/100/ LINK/ 10/100/ ACTIVE 1000 ACTIVE 1000 GBE-1 SUB LINE NET Chapter 2 Rack-Mount the SCE 1000 Installing the Crossrail Supports (Four-post rack only) Figure 2-4 Attaching the Mounting Brackets (2-post) 1 2 To install the rack-mount brackets on the SCE 1000 chassis, complete the following steps: Before installing the SCE 1000 in the rack, you must first install
Summary of the content on the page No. 14
Chapter 2 Rack-Mount the SCE 1000 Mount the System to the Rack Figure 2-5 Assembling the Slider Brackets 1 2 3 Step 2 Make sure that they are oriented so that both crossrails will support the SCE 1000 when they are attached to the rack. Attach the Crossrail Supports to the Rack Step 1 Align the crossrail supports with the side of the rack, parallel to the floor. Figure 2-6 Attaching the Crossrails to the Rack 1 2 3 Insert and tighten two screws to the front posts or mounting strips o
Summary of the content on the page No. 15
Cisco SCE 2000 Series PW R A PW R B STATUS BYPASS 4xGBE LINK RX TX LINK RX TX LINK RX TX LINK RX TX LI M/N1G 0/ 1 100/ LI M /N1G 0/ 1 2 00/ CONSO LE AUX RX MM TX RX MM TX RX MM TX RX MM TX AC T N IK VE 1000 AC T N IK VE 1000 GBE- 1 GBE- 2 S UB LINE NET S UB LINE /CAS CA DE NET Cisco SCE 1000 Series 2xGBE PWR A PWR B STATUS BYPASS LINK RX TX LINK RX TX MNG 1 MNG 2 CONSOLE AUX RX MM TX RX MMTX LINK/ 10/100/ LINK/ 10/100/ ACTIVE 1000 ACTIVE 1000 GBE-1 SUB LINE NET Chapter 2 Rack-Mount the SCE
Summary of the content on the page No. 16
Cisco SCE 1000 Series 2xGBE PWR A PWR B STATUS BYPASS LINK RX TX LINK RX TX MNG 1 MNG 2 CONSOLE AUX RX MM TX RX MM TX LINK/ 10/100/ LINK/ 10/100/ ACTIVE 1000 ACTIVE 1000 GBE-1 SUB LINE NET Chapter 2 Rack-Mount the SCE 1000 Mount the System to the Rack A rack with both front and back posts will have the crossrail supports installed. Slide the SCE 1000 onto these crossrails and push it all the way back. Step 4 While keeping the brackets flush against the posts or mounting strips, align the
Summary of the content on the page No. 17
BYPASS 1 IN POWER B OK IN POWER A OK CH A P T E R 3 Connect the Power Supply Units This section provides information for grounding the SCE 1000 platform and connecting the AC or DC power supply units. Connect the Chassis Ground, page 3-1 Connecting the Power, page 3-2 Connect the Chassis Ground Figure 3-1 Grounding the Unit (AC) 1 2 Cisco Service Control Engine 1000 2xGBE Quick Start Guide OL-7822-06 3-1 210421
Summary of the content on the page No. 18
BYPASS 1 IN POWER B OK IN POWER A OK Chapter 3 Connect the Power Supply Units Connecting the Power Figure 3-2 Grounding the Unit (DC) 1 2 A Grounding kit is provided with each SCE 1000. Use this Grounding kit to properly ground the SCE 1000 chassis. When installing the unit, the chassis ground connection must always be made first and disconnected last. Step 1 On the rear panel of the SCE 1000, locate the chassis grounding connector (refer to the appropriate figure for an AC- or DC-power
Summary of the content on the page No. 19
BYPASS 1 IN POWER BOK IN POWER A OK Chapter 3 Connect the Power Supply Units Connecting the Power Connect the DC-Input Power Supply Unit Figure 3-3 Connecting the DC Power Before completing any of the following steps, and to prevent short-circuit or shock hazards, ensure that power is removed from the DC circuit. To ensure that all power to the power supply unit is OFF, locate the circuit breaker on the panel board that services the DC circuit, switch the circuit breaker to the OFF
Summary of the content on the page No. 20
BYPASS 1 IN POWER B OK IN POWER A OK Chapter 3 Connect the Power Supply Units Connecting the Power Step 7 Look at the IN and OK LEDs on the power supply unit and the corresponding Power LED on the front panel. If the DC-input power supply unit is operating properly, these LEDs will be glowing green. Step 8 Ensure that the power supply is properly aligned and the installation screw is tightened. Connect the AC-Input Power Supply Unit Step 1 Plug the AC-input power cable into the AC-in