Greenheck Fan 470654 user manual

User manual for the device Greenheck Fan 470654

Device: Greenheck Fan 470654
Category: Gas Heater
Manufacturer: Greenheck Fan
Size: 2.51 MB
Added : 4/9/2014
Number of pages: 36
Print the manual

Download

How to use this site?

Our goal is to provide you with a quick access to the content of the user manual for Greenheck Fan 470654. Using the online preview, you can quickly view the contents and go to the page where you will find the solution to your problem with Greenheck Fan 470654.

For your convenience

If looking through the Greenheck Fan 470654 user manual directly on this website is not convenient for you, there are two possible solutions:

  • Full Screen Viewing - to easily view the user manual (without downloading it to your computer), you can use full-screen viewing mode. To start viewing the user manual Greenheck Fan 470654 on full screen, use the button Fullscreen.
  • Downloading to your computer - You can also download the user manual Greenheck Fan 470654 to your computer and keep it in your files. However, if you do not want to take up too much of your disk space, you can always download it in the future from ManualsBase.
Greenheck Fan 470654 User manual - Online PDF
Advertisement
« Page 1 of 36 »
Advertisement
Print version

Many people prefer to read the documents not on the screen, but in the printed version. The option to print the manual has also been provided, and you can use it by clicking the link above - Print the manual. You do not have to print the entire manual Greenheck Fan 470654 but the selected pages only. paper.

Summaries

Below you will find previews of the content of the user manuals presented on the following pages to Greenheck Fan 470654. If you want to quickly view the content of pages found on the following pages of the manual, you can use them.

Abstracts of contents
Summary of the content on the page No. 1

Part #470654
VSU Make-Up Air Unit
®®
with Direct-Fired Gas Heater
Installation, Operation and Maintenance Manual Installation, Operation and Maintenance Manual
Please r Please read and save these instructions. Read car ead and save these instructions. Read carefully befor efully before attempting to assemble, install, operate or maintain the e attempting to assemble, install, operate or maintain the
pr product described. Pr oduct described. Protect yourself and others by observing all safety in

Summary of the content on the page No. 2

Receiving Inspection and Maintenance during Storage Upon receiving the product check to make sure all items While in storage, inspect fans once per month. Keep a are accounted for by referencing the bill of lading to record of inspection and maintenance performed. ensure all items were received. Inspect each crate for If moisture or dirt accumulations are found on parts, shipping damage before accepting delivery. Notify the the source should be located and eliminated. At each carrier if any

Summary of the content on the page No. 3

Table of Contents General Safety Information ....................1 Receiving, Handling and Storage ...............2 Product Overview ............................4 Subassembly Overview: Filter Section / Vertical Mounting Stand ..........4 Optional Service Platform .....................4 Burner, Blower and Control Center Overview ......5 Burner Subassembly .......................6 Control Center ............................6 Dampers ...................................6 Installation Concre

Summary of the content on the page No. 4

Product Overview Subassemblies The model is a vertically-configured make-up air unit Filter Section / Vertical Mounting Stand designed for outdoor installations. It contains a highly The filter section of the unit is factory installed in the efficient direct-fired gas burner to provide a heat source mounting stand and shipped ready for installation on for the building or to simply temper the air. The unit is the concrete mounting pad. Each filter unit has a large designed to provide suffic

Summary of the content on the page No. 5

Burner, Blower and Control Center Section The blower section of the unit consists of one motor and The burner section, blower section and control center either one or two forward curved blowers. It is the top- of the unit are all combined into one assembly which most assembly in the unit. If two blowers are used, their is installed in the field on top of the filter and stand drive shafts are connected and driven by a single motor. section. The burner section is the lowest part of the Supp

Summary of the content on the page No. 6

Dampers There are four locations where optional dampers may be found. An optional motorized intake damper may be located horizontally on the bottom of the burner section. A patented passive control damper may be found adjacent to the burner opening plates if a VAV is ordered and a motorized damper may be installed vertically on the side of the burner section if recirculating air mode is chosen. In addition, an outlet damper may be shipped with the unit for field installation. Optional Fi

Summary of the content on the page No. 7

Installation Concrete Slab Burner/Blower Section The first step in unit installation is to pour a concrete Use a crane and a spreader bar hooked to the factory slab capable of holding the unit weight as a base. The lifting lugs (shown below) to lift and center the unit onto slab should have a proper gravel drainage bed. the filter stand section. The sections should be caulked together. Spreader Bar Concrete Slab Dimensions Housing Size A B C D E 20 64 64 42 40 40 30 77 76 42 52 53 40 78 135

Summary of the content on the page No. 8

Complete Installation Installation of Optional Service Platform A typical horizontal discharge installation is shown. Gas and/or electrical lines can be connected at this time. For upblast units, a duct elbow may be needed to turn the ductwork into the building. Follow proper ductwork methods recommended by AMCA to make this elbow to minimize duct losses. TOOLS REQUIRED • (2) 9/16 in. sockets or wrenches • Drill with 7/16 in. drill bit and 5/16 in. drill bit • A crane or forklift is recommen

Summary of the content on the page No. 9

Assembly 6. Facing the control panel side of the unit, find the center of the housing and drill a (7/16 in.) hole 1. Position platform base as shown below in Figure A through the housing and support stand (3/8 in.) with the grate side up. above the form line as shown in Figure C. 2. Attach the left and right handrails to the platform base with (3/8 in. x 3/4 in.) hex head bolts and (3/8 in.) hex nuts as shown in Figure A. Use six bolts and 3/8 inch nuts on each rail. 3. Raise the platfo

Summary of the content on the page No. 10

Installation of Electrical Wiring must be compatible with the ratings on the nameplate, IMPORTANT supply power voltage, phase and amperage. Consult Before connecting power to the unit, read and ANSI/NFPA 70 and CSA C22.1 for proper conductor understand the following instructions and wiring sizing. diagrams. Complete wiring diagrams are attached on Connect the Main Power the inside of the control center door(s). Connect the main power lines to the disconnect switch IMPORTANT and main groun

Summary of the content on the page No. 11

Installation of Direct Gas Piping Determine the Supply Gas Requirements IMPORTANT The unit’s direct gas nameplate states the requirements All gas piping must be installed in accordance for the gas being supplied to the unit. The direct gas with the latest edition of the National Fuel Gas nameplate is located on the outside of the unit on the Code ANSI/Z223.1 and any local codes that may control center side. apply. In Canada, the equipment shall be installed Minimum gas pressure for in ac

Summary of the content on the page No. 12

Connect the Supply Gas Line Installation of Building Pressure A manual shut off valve (gas cock), 1/8 in. plugged test Control (optional) port and 6 in. drip leg must be installed prior to the gas Mount Pressure Tap train. The valve and the test port must be accessible for the connection of a test gauge. Supply gas connections Using the factory provided bracket, mount the pressure must be made by a qualified installer and are not tap to the outside of the furnished by manufacturer. unit.

Summary of the content on the page No. 13

Start-Up - Checklist Unit Model Number _______________________________ Start-Up Direct Gas (Pilot Ignition) – refer to (e.g. VSU-H20) Start-Up - Direct Gas section for further detail. o Check supply gas pressure Unit Serial Number _______________________________ (e.g. 10111000) ________ Maximum ________ Minimum Start-Up Date _______________________________ ________ Actual Start-Up Personnel Name __________________________ o Check Pilot Gas Pressure Start-Up Company _____________

Summary of the content on the page No. 14

Start-Up - Blower Check for Vibration WARNING Check for unusual noise, vibration or overheating of the Check the housing, blower, and ductwork for any bearings. Reference the Troubleshooting section for foreign objects before running the blower. corrective actions. WARNING IMPORTANT Disconnect and lock-out all power and gas before Excessive vibration may be experienced during performing any maintenance or service to the unit. the initial start-up. Left unchecked, it can cause a Failure to

Summary of the content on the page No. 15

Start-Up - Direct Gas Set-Up Optional Components IMPORTANT Adjust the settings on the optional components. See For proper unit function and safety, follow the start-up the unit’s specific wiring diagram located on the access procedure in the exact order that it is presented. door or the unit. IMPORTANT • Heating Inlet Air Sensor This start-up should begin after all of the installation Typical setting: 60-70ºF procedures and the blower start-up have been • Building Freeze Protection compl

Summary of the content on the page No. 16

Set the Burner Air Pressure Differential NOTE With the fan running and discharging 70ºF (21ºC) air, The pressure drop was set at the factory and may not connect a U-Tube manometer to the outer sensing need adjustment. probes (see below) and measure the static pressure across the burner. NOTE When required pressure is obtained, be sure to 9 Outer Sensing Probes reconnect the outer sensing probes. 8 IMPORTANT This process may need to be repeated until the proper 7 pressure is achieved. This

Summary of the content on the page No. 17

Set the Minimum Firing Rate IMPORTANT Disconnect and isolate one of the wires running to the Setting the maximum firing rate during mild weather modulating valve to send the unit to its minimum firing conditions may cause the high limit to trip out during rate. Set the minimum firing rate by adjusting the needle extreme conditions requiring manual resetting. valve indicated. NOTE After setting the minimum firing rate, shut off the pilot Gas trains are equipped with either separate to ensu

Summary of the content on the page No. 18

Set the Unit’s Operating Temperature Set the operating temperature. The operating Maxitrol SC25S: The SC25S is an analog signal temperature setting depends on which Maxitrol converter that will change a 0-10 VDC or a 4-20 mA controller is used. control signal provided by an owner supplied Building Management System into an output level capable of driving one or more modulating gas valves. The SC25S Maxitrol Series 14 – 8 Terminals: The Maxitrol also limits the minimum and maximum disch

Summary of the content on the page No. 19

Building Pressure Control — BLOWER Operation - VAV Units (optional) EXHAUST (OPTIONAL) a variable frequency drive is SUPPLY MAIN VALVES HEAT controlled according to input from NOTE a pressure sensing device. Blower Start-Up, as shown on page 14, should be DIRTY FILTERS Turn both knobs to the upper 70 performed before the blower is run. 75 65 80 (OPTIONAL) 60 85 90 55 most pressure setting. You may NOTE have to remove the outdoor pressure tap tubing. VAV systems For maintenance issues ass

Summary of the content on the page No. 20

Building Pressure Control — a Operation - Recirculating Units BLOWER EXHAUST (OPTIONAL) modulating spring return actuator SUPPLY (optional) MAIN VALVES is used to control the return air HEAT amounts. The return air damper NOTE modulates from fully open to fully DIRTY FILTERS 75 70 65 80 (OPTIONAL) 60 closed based on a signal from a 85 Blower Start-Up, as shown on page 14, should be 55 90 remote pressure sensing device. performed before the blower is run. Turn both knobs to the upper most PH


Alternative user manuals
# User manual Category Download
1 Greenheck Fan Modular Make-Up Air Unit DGX User manual Gas Heater 2
2 Allied Air Enterprises 506271-01 User manual Gas Heater 0
3 Blue Rhino ALL WEATHER WOVEN HEATER GWU9850F / 35554 User manual Gas Heater 2
4 Breckwell ECONOMY P22FSL User manual Gas Heater 0
5 Breckwell ECONOMY P22FSA User manual Gas Heater 0
6 Breckwell ECONOMY P22I User manual Gas Heater 1
7 Briggs & Stratton 32K400 User manual Gas Heater 2
8 Bryan Boilers CLM240WP User manual Gas Heater 2
9 Bryan Boilers CLM180WP User manual Gas Heater 0
10 Bryan Boilers CLM270WP User manual Gas Heater 1
11 Bryan Boilers CLM300WP User manual Gas Heater 0
12 Bryan Boilers CLM90WP User manual Gas Heater 0
13 Cannon CANTFS-03-NG User manual Gas Heater 0
14 Cannon CANTFS-03-LP User manual Gas Heater 0
15 Bryant 585A/YAC User manual Gas Heater 7