Summary of the content on the page No. 1
®
Tempest Hot Air Drying System
Installation Instructions
Ryobi 3302
Itek 3985
A.B. Dick 9985
X88-43
01/2001
Rev-B
2740
Summary of the content on the page No. 2
GENERAL INFORMATION Accel Graphic Systems provides parts and service through its ATTENTION ® authorized distributors and dealers. Therefore, all requests for TEMPEST DRYER parts and service should be directed to your local dealer. OWNER! The philosophy of Accel Graphic Systems is to continually improve all of its products. Written notices of changes and improvements are sent to Accel Graphic Systems' Dealers. If the operating characteristics or the appearance of your product differs from those d
Summary of the content on the page No. 3
GENERAL INFORMATION 220 VAC 50/60 HZ ELECTRICAL 20 AMP DEDICATED LINE REQUIREMENTS NEMA L620R RECEPTACLE The use of heat to accelerate drying may require more frequent IMPORTANT lubrication and/or use of a high temperature lubricant in the delivery of INFORMATION the press. Please consult your press manufacturer for specific recom- mendations. ® The Tempest Dryer contains high voltage and hot surfaces. Never SAFETY attempt to service or work on the unit unless the power is shut off and INFORMATI
Summary of the content on the page No. 4
GENERAL INFORMATION ® Although the technology behind the Tempest dryer was significant HOT AIR enough to be awarded the GATF Intertech Award, it is by no means VS INFRARED new. In fact, thermistors have been in use for many years. They WHAT MAKES were originally used in motors and other devices as a heat ® TEMPEST WORK controller and later used in refrigeration to turn compressors on and off. It is only in the last 10 years or so that thermistors have been used as a heater. Heat is generated by
Summary of the content on the page No. 5
GENERAL INFORMATION IR dryers use very high temperatures and a fixed amount of electricity. One of the drawbacks of using a very hot heat source is that heat wants to travel from a very high temperature to a very low temperature. In other words, the heat generated from an IR dryer will travel to the press wall and attempt to increase its temperature because it is cooler than the heat produced by the IR dryer. Because the thermistors used in the ® Tempest dryer use lower temperatures, the heate
Summary of the content on the page No. 6
6
Summary of the content on the page No. 7
INSTALLATION DISCONNECT THE POWER TO THE PRESS BEFORE BEGINNING INSTALLATION. 1 Remove the two large side covers over the main framework of the press (one at OPS and one at NOPS) and the NOPS cover at the delivery end of the press. For an easier installation, you may also want to remove the two guards on the delivery end of the press. NOTE: Do not cut the hose if the press is equipped with an Airtech sprayer. 2 Cut the sprayer hose about halfway between the hopper and the spray bar. A new hose
Summary of the content on the page No. 8
8
Summary of the content on the page No. 9
INSTALLATION Remove the chain guide (subject arrow) at the OPS & NOPS sides of the press. 4 Install the mounting bracket and new chain guide using M5 X 16MM cap head bolts and lock washers (subject arrow) as shown at the 5 OPS & NOPS. Leave the bolts loose so the position of the dryer can be moved up and down. The bolts thread into the same holes that held the original chain guides. 9
Summary of the content on the page No. 10
10
Summary of the content on the page No. 11
INSTALLATION Note: If the press is equipped with an Airtech sprayer, you must remove the spray bar from the dryer before installing it in the 6 press. To remove the spray bar from the dryer, remove the three screws on the top of the dryer. Set the dryer on the brackets with the cable exiting at the NOPS. Run the cable under the mounting bracket (subject arrow, left picture) and through the large hole in the side frame (subject arrow, lower picture) directly under the mounting bracket. Secure th
Summary of the content on the page No. 12
12
Summary of the content on the page No. 13
INSTALLATION Position the dryer so it clears the gripper opening mechanism on all three delivery gripper bars. The arm must clear both the top and 8 bottom of the dryer. The photo shows the arm clearing the top of the dryer (subject arrow). After positioning the dryer, tighten the bolts holding the mounting brackets to the press frame and the bolts holding the dryer to the mounting brackets. NOTE: If the press is equipped with an Airtech sprayer, pro- ceed to step 11. 9 Attach two hoses to the e
Summary of the content on the page No. 14
14
Summary of the content on the page No. 15
INSTALLATION Connect the two hoses together using the "Y" connector (left hand ® subject arrow). Connect the Tempest Spray line to the press spray 10 hopper line using the reducer (right hand subject arrow). Attach the exhaust fan/manifold assembly to the center of the delivery guard as shown. Make sure that the arrow on the fan is 11 pointing toward the guard (out of the press) and that the wires are routed toward the NOPS of the press. The top two screws go through the second slot down from t
Summary of the content on the page No. 16
16
Summary of the content on the page No. 17
INSTALLATION Attach the microswitch cable assembly to the microswitch's in- stalled in step 12. See diagram for proper connection. 13 Find a suitable location for the main Tempest electrical box on the NOPS of the press. Route the exhaust fan cable (this cable 14 has female pins in the connector on the end) into the delivery and connect it to the exhaust fan installed in a previous step. Route the impression signal cable (this cable has male pins in the connector on the end) through the press a
Summary of the content on the page No. 18
18
Summary of the content on the page No. 19
INSTALLATION Remove one of the two screws that attach the guard prop to the delivery guard on the NOPS. Install the supplied longer M4 screw 16 in its place and using the original nut secure the provided cable clamp (subject arrow) to the underside of the guard. Make sure you have the exhaust fan cable going through the clamp before securing it to the guard. Place the larger heat shield in the delivery as shown. 17 Place the small heat shield in the delivery and attach it to the larger shield, w
Summary of the content on the page No. 20
20