Summary of the content on the page No. 1
M
GG
RS
X
P
FF
G
T
E
N
T
L
RL
AP
L
T
D
AN
P
T
N
C
D
M
X
C
Q
D
K-5H52
C
J
Q
AF
F
AK
H
J-5H51
Description Assembly Letter Quantity Required Tools
Front Floor Panel J-5H51 1
Repeat Floor Panel K-5H52 2
1S84
Safety Glasses
Left Side Panel C 3
94.63"
Right Side Panel D 3
Left Back Panel E 1
Right Back Panel G 1
Left Front Panel H 1
Rubber Mallet
Right Front Panel J 1
Wall Connector Q 24
Left Door AK 1
Right Door AF 1
128.85"
Lock Hasp X 1
Window for Door LL 2
Phillips Screw Driver
Gasket for Door Win
Summary of the content on the page No. 2
Level construction site before beginning assembly of shed. A foundation may be FLOOR PLAN: constructed if desired. Size the construction site to fit the entire floor. Allow clearance for opening front and back doors. 1 OPTIONAL STEP: If desired, recessed anchor locations (8 places) can be used to anchor the shed floor to a foundation after Step 6. 39-7/8 [ 1014 ] 76" 4-1/1 8 1 4-1/8 4 [ 106 ]/8" [ 106 ] 4 /8" 3 3-3/4 3 [ 95/ ] 4" 7 127 /16" 128-7/87 128 [ 3273 ] /8" ANCHOR 127-1/8 1 [ 3
Summary of the content on the page No. 3
Using a utility knife, cut the long sides of each wall slot tab and then use a screwdriver to knock it out 6 places on Floor Panel (K-5H52) used in the MIDDLE position and 12 places on Floor Panel (K-5H52) used in the Back position. 3 ( ) K-5H52 BACK POSITION ( ) K-5H52 MIDDLE POSITION Place the Floor Panel (J-5H51) on the foundation. Connect two Repeat Floor Panels (K-5H52), install Screws (AA) 14 places. Optional Step: If desired, recessed anchor locations (8 places) can be used to secure the
Summary of the content on the page No. 4
1 1 2 2 Using a screwdriver, punch out the screw holes on the top of Left Side Panel (C) 2 places. Lubricate dovetails on Left Front Panel (H) 4 places with liquid soap. Connect Left Front Panel (H) into dovetails of Left Side Panel (C), engage snaps on Connect Left Side Panel (C) into Front Floor (J-5H51). bottom of Left Front Panel (H) into Front Floor (J-5H51). 5 6 Dovetail C Screw Holes C C H click J-5H51 J-5H51 click click Using a screwdriver, punch out the screw holes on the top of the L
Summary of the content on the page No. 5
1 1 2 2 Using a screwdriver, punch out the screw holes on the top of the Left Side Panel (C) Install Wall Connectors (Q) 5 places. 2 places. Align lap joint between Left Side Panels. 9 10 Connect Left Side Panel (C) into Repeat Floor (K-5H52). C Q C C C C C C C K-5H52 click Lubricate dovetails on Left Back Panel (E) 4 places with liquid soap. Repeat Steps 8-13 to assemble right side of shed. Continue to Step 15. Connect Left Back Panel (E) into dovetails on Left Side Panel (C), engage snaps on
Summary of the content on the page No. 6
1 1 2 2 2 Engage lap joint between Left Back Panel (E) and Right Back Panel (G) and Lubricate dovetails on Right Back Panel (G) 4 places with liquid soap. install Wall Connectors (Q) 4 places. Connect Right Back Panel (G) into dovetails of Right Side Panel (D), engage snaps on bottom of Right Back Panel (G) into Repeat Floor (K-5H52). 13 14 E G Q E G D E K-5H52 G NOTE: Front Gable and Doors not shown. Install Gable (M) onto top of back wall engaging the 2 dovetails on the back panel Install Ga
Summary of the content on the page No. 7
Set the Left Door Panel (AK) face down on the ground. Starting at the top of the door, slide the Door Reinforcement (NN) onto the groove located on the handle side of the door. The Door Reinforcement (NN) will slide to the stop at the Slide the Hinge Reinforcement (PP) into the hole on the top door pin. The Hinge bottom of the door. Reinforcement (PP) will slide in until it is below the end of the door pin. 17 18 AK AK AK AK PP NN NN AK AK PP NN Install the Gasket (MM) into the gasket groove
Summary of the content on the page No. 8
2 3 3 Install Left Door Panel (K) inserting the lower hinge pin into Front Floor (J-5H51) Install Right Door Panel (F) inserting the lower hinge pin into Front Floor (J-5H51) socket, lift the left end of the Gable (M) enough to insert the top hinge pin on socket, lift the right end of the Gable (M) enough to insert the top hinge pin on Right Door Panel (F) into the Gable (M) socket. Left Door Panel (K) into the Gable (M) socket. 21 22 Install Lock Hasp (X) on interior side of Right Door Panel
Summary of the content on the page No. 9
2 1 2 Apply Ridge Tape (HH) to Ridge Cap (GG) 2 places. Snap Ridge Cap (GG) onto the Place the Ridge Beam Assembly into cups at the top of each Gable (M). Ridge Beam Assembly covering the seam. 25 26 HH M GG HH GG RS M RL RS GG RL Align slots in Ridge Beam Assembly with holes in Gable (M) tab at back, install OPTIONAL STEP: Bolt (BB), Washer (CC), and Nut (DD) 1 place, ONLY TIGHTEN NUT “FINGER” TIGHT. Install (2) 2" x 6" x 124-1/4" pieces of lumber into Gable (M). (Lumber not included.) 27 28
Summary of the content on the page No. 10
L AN Align slots in Ridge Beam Assembly with holes in Gable (M) tab, install Bolt (BB), Washer (CC), and Nut (DD) 1 place, ONLY TIGHTEN NUT “FINGER” TIGHT. 29 Washer Plastic Tab BB on Gable CC DD Nut Bolt Head M M R Using a screwdriver, punch out the screwholes on the Left Skylight Roof Panel (AN) 6 places. Attach the Skylight (L) to the Left Skylight Roof Panel (AN), install Screws (JJ) 6 places. 30 (6) JJ 3 Caution: When installing screws do not overtighten. 2 1 L AN The Skylight Roof Panel
Summary of the content on the page No. 11
1 3 Lubricate roof snaps on left side of the front Gable (M) 4 places. Raise the Left Roof Panel (N) onto the left side of the shed assembly, the arrows on the Roof Panel should face the inside of the shed and point towards the Ridge 31 Beam Assembly. R N M Using (2) stepstools (1 inside shed, 1 outside shed), lift the bottom of the Roof Panel above horizontal and guide into the Ridge Beam Assembl y. Align the front Gable (M) rib with the channel in the Left Roof Panel (N). Engage Left Roof Pa
Summary of the content on the page No. 12
1 1 3 3 Raise the Left Skylight Roof Panel (AN) onto the left side of the shed assembly, the arrows on the Roof Panel should face the inside of the shed and point towards the Ridge Beam Assembly. Using (2) stepstools (1 inside shed, 1 outside shed), lift the bottom of Left Skylight Roof Panel (AN) above horizontal and guide into the Ridge Beam Assembly. Align the lap joint between the Roof Panels. Engage Skylight Left Roof Panel (AN) in the Ridge Beam Assembly by lowering the bottom of the Roof
Summary of the content on the page No. 13
1 1 2 2 2 Install Roof Connectors (T) 8 places. You may need to lift the roof panels to avoid the 2"x6" lumber. 35 T Engage all snaps between the Roof Panels and Gables. Then engage all snaps between Roof Panels and Wall Panels. 36 1 1 2
Summary of the content on the page No. 14
Repeat Steps 29-35 for Right Roof of shed. Install Screws (AA) 16 places in front and back Gable (M). 37 38 P N (16) AA See Steps 30, 31 R See Step 29 See Step 32 See Step 33 L P AP P Back of shed shown Caution: When installing screws do not overtighten. While 1 person holds down the bottom of the Roof, install Screws (AA) 12 places in Install Roof Pins (EE) 4 places connecting the Roof Panels to the Gables. screw holes on top of each Left Side Panel (C) and Right Side Panel (D). Screws connect
Summary of the content on the page No. 15
94.63" 128.85" 88.09"
Summary of the content on the page No. 16
Congratulations! We hope you enjoy your ® Rubbermaid 7' x 10' 6" Storage Building! ® For more information on all Rubbermaid products, go to www.rubbermaid.com Printed in U.S.A. Customer Service © 2012 Rubbermaid Incorporated Toll Free: 1-888-895-2110 Huntersville, NC U.S.A. 28078-1801 M–F 8:30 AM to 5:00 PM EST www.rubbermaid.com or visit us at www.rubbermaid.com 1869756