Installation & Operating Manual
The Harman Advance Pellet Stove
“Ce manuel est disponible en Français sur demande” R8
SAFETY NOTICE
PLEASE READ THIS ENTIRE MANUAL BEFORE YOU INSTALL AND USE YOUR NEW ROOM HEATER. FAILURE TO
FOLLOW INSTRUCTIONS MAY RESULT IN PROPERTY DAMAGE, BODILY INJURY, OR EVEN DEATH.
FOR USE IN THE U.S. AND CANADA. SUITABLE FOR INSTALLATION IN MOBILE HOMES
IF THIS HARMAN STOVE IS NOT PROPERLY INSTALLED, A HOUSEFIRE MAY RESULT. FOR YOUR SAFETY, FOLLOW
INSTALLATION DIRECTIONS
Summary of the content on the page No. 2
Introduction The Advance Pellet Heater This heating appliance does not just have automatic ignition, it has total automatic temperature control. The Advance uses a small room sensor rather then a wall thermostat for a more accurate temperature control. The Advance's control panel is designed for easy and efficient operation. It has 2 automatic modes of operation and 2 manual modes of operation. The Advance's specially designed burn pot and the "Advance Igniter" Automatic Ignition System, allow t
Summary of the content on the page No. 3
Automatic Ignition/Operation The Advance pellet stove is more than just automatic ignition, it is also automatic temperature control. The automatic system will allow the fire size to be adjusted to match the heating needs and even put the fire out if necessary. If heat is needed after the fire is out, the Advance will automatically re-ignite and adjust the fire size to match the heating need. The totally automatic room sensor mode is recommended because of its efficiency. The unit can be switche
Summary of the content on the page No. 4
Automatic Start Up Starting First Fire Igniter Switch to"AUTO"(up position) Make sure the unit is plugged into a 120 VAC, 60 HZ electrical source. The power light should be the only light lit. 1. Turn Mode Selector to "OFF". See Note 7. Fig. 1 1 2. Fill hopper with pellets. 1" 5 3. Clean burn pot with scraper, if necessary. 4. If starting after an empty hopper, turn Feed 2 Adjuster to "TEST" (for one 60 second cycle). This will purge pellets into the auger tube and also allow you to check the
Summary of the content on the page No. 5
Manual Ignition/Operation The Advance Pellet Stove is capable of manual operation. This also allows the operator to manually control operation during an emergency (i.e. igniter failure, when using a 502H battery backup, or when using certain generators.) The unit can be switched between "AUTO" and "MANUAL" at any time during operation. NOTE: When starting the unit in the "AUTO" mode and switching to "MANUAL", the fire must be large enough to start the distribution blower. The starting of the bl
Summary of the content on the page No. 6
Manual Start Up Starting First Fire Igniter Switch to"MANUAL" Fig. 4 (down position) Make sure the unit is plugged into a 120 VAC, 60 HZ electrical source. The power light should be the only light lit. Fig. 3 See Note 7. 1" 1. Turn FEED ADJUSTER to desired feed rate. 4 No. 4 is good for most pellets. 2. Turn the MODE SELECTOR to “OFF” and then to the desired mode. This will reset con- trol and start the combustion motor. 3. Turn the TEMPERATURE DIAL to the desired setting. Fig. 5 5 4. Clean bur
Summary of the content on the page No. 7
ESP Control Power Light Feed adjuster Indicates power to the Sets the maximum control. feed rate Test Runs all motors at full speed for one minute Status Light to check operation. Will be lit in either stove After two minutes the or room temp mode when stove will go to pointer is not within off minimum burn and position band except the blowers will after normal shut down. alternate from high to Blinks to indicate errors low every minute to listed below. remind you that you are still in "Test M
Summary of the content on the page No. 8
FLOOR PROTEC TOR Installation When installing and operating your Harman Advance Pellet Stove, respect basic safety standards. Read these instructions carefully before you attempt to install or oper- 7" ate the Advance. Failure to do so may result in damage to property or personal injury and may void the product war- ranty. Consult with your local building code agency and in- surance representative before you begin your installation to ensure compliance with local codes, including the need 7"
Summary of the content on the page No. 9
Removing Side Doors for Installation Removing Side Doors Figure 9 Use hand hole to swing open side doors to at least o 90 . Figure 10 Side Remove side doors by lifting upward on the door until Door the bottom pin is out of its hole. Move the bottom of Fig. 9 the door out and away from the pedestal base about 1/2". Allow the door to slide downward until the top door pin is out of its top hole. NOTE: Always remove the side doors and rear shields to move the unit. This will keep them from getting d
Summary of the content on the page No. 10
Low Draft Voltage Adjustment Combustion Motor Speed Control Low draft only set point. The small straight screwdriver slot is plastic; therefore, the unit can be adjusted while in operation. Fig.15: Draft Meter bolt hole location Fig.14 A simple draft test should be performed after These units are pre-tested at the factory with Fig.1 exactly 120 Volts A.C., 60 Hz. They are checked and completing the flue pipe installation. To record the adjusted for firebox tightness, gasket leakage, motor resul
Summary of the content on the page No. 11
Room Sensor and Air Grill Installation Gold Air Grill Installation Room Sensor Installation Fig. 17 Fig. 16 The room sensor is a small temperature sensor Insert the two tail end hooks of the Air Grill Assembly on the end of a 60" gray wire. This sensor is installed up under the stove top edge. Insert inward until the much like a standard wall thermostat. Because it is so two center hooks drop into the stove body slots in the small, it can be hidden along the trim of a doorway or front of the uni
Summary of the content on the page No. 12
Venting A combustion blower is used to extract the com- bustion gases from the firebox. This causes a nega- tive pressure in the firebox and a positive pressure in the venting system as shown in fig. 19. The longer the vent pipe and more elbows used in the system, the greater the flow resistance. Because of these facts we recommend using as few elbows as pos- sible and 15 feet or less of vent pipe. The maximum horizontal run should not exceed 48". If more than 15 feet of pipe is needed, the diam
Summary of the content on the page No. 13
Venting #1 Preferred method This method provides excellent venting for nor- mal operation and allows the stove to be installed clos- est to the wall. One inch from the wall is safe; how- ever, two or three inches allows better access to re- move the rear panel. The vertical portion of the vent should be three to five feet high. This vertical section will provide natural draft in the event of a power failure. 3 ft. to combustibles Fig.20 #2 Preferred method This method also provides excellent ven
Summary of the content on the page No. 14
Venting #3 Installing into an existing chimney ( US only ) This method can be used for normal operation. This method also provides natural draft in the event of a power failure. If the chimney condition is ques- tionable you may want to install a liner as in method #6. Fig.22 #4 Installing into an existing fireplace chimney ( US only ) This method can be used for normal operation. This method also provides natural draft in the event of a power failure. The damper area must be sealed with a steel
Summary of the content on the page No. 15
Venting #5 Installing into an existing fireplace chimney ( US and Canada) This method provides excellent venting for nor- mal operation. This method also provides natural draft in the event of a power failure. In Canada and some places in the US it is re- quired that the vent pipe extend all the way to the top of the chimney. In this method a cap should also be installed on the chimney to keep out rain. Be sure to use approved pellet vent pipe fittings. Seal pipe joints with silicone in additio
Summary of the content on the page No. 16
Venting Storm collar 12" min. Flashing 3" min. 3" min. 3" min. PL vent manufacturer's No insulation or other firestop spacer and support. combustible materials are allowed within 3" of the PL vent pipe. Fig. 27 Fig. 26 #7 Installing through the ceiling vent Minimum flue vent configuration Through the ceiling vent, follow PL vent It is recommended that outside air be installed with manufacturer's recommendations when using wall this venting configuration. and ceiling pass through. Fig. 28 16 Eval
Summary of the content on the page No. 17
Venting I. The clearance to service regulator vent outlet Requirements for Terminating the 1 must be a minimum of 6 feet. Venting J. The clearance to a non-mechanical air sup- WARNING: Venting terminals must not be re- ply inlet to the building or the combustion air inlet to 1 cessed into a wall or siding. any other appliance must be a minimum of 48”. NOTE: Only PL vent pipe wall pass-throughs and K. The clearance to a mechanical air supply 1 fire stops should be used when venting through com- i
Summary of the content on the page No. 18
Venting DO NOT INSTALL A FLUE DAMPER IN THE WARNING EXHAUST VENTING SYSTEM OF THIS UNIT. DO NOT INSTALL IN SLEEPING ROOM DO NOT CONNECT THIS UNIT TO A CHIMNEY FLUE SERVING ANOTHER CAUTION APPLIANCE. THE STRUCTURAL INTEGRITY OF THE MOBILE HOME FLOOR, WALL, AND INSTALL VENT AT CLEARANCES CEILING/ROOF MUST BE MAINTAINED. SPECIFIED BY THE MANUFACTURER CAUTION Mobile home installation should be done in accordance with the Manufactured Home KEEP COMBUSTIBLES AWAY and Safety Standard (HUD), CFR 3280, F
Summary of the content on the page No. 19
Maintenance - Emptying Ashes Ash Pan Removal and Reattachment Figure 29 Open side doors. Figure 30 Release spring latches on the right and left side of the ash pan. Fig. 29 Figure 31 Slide ash pan forward enough to lift with center handle. Empty ashes and reinstall ash pan. Ashes should be placed in a metal container with a tight fitting lid. The closed container of ashes should be placed on a noncombustible floor or on the ground, well away from all combustible materials, pending
Summary of the content on the page No. 20
Maintenance - Cleaning Glass on View Door WARNING Opening and Closing the View Door Door latch may Opening: be hot! The view door must be opened for cleaning of the glass and scraping of the burn pot. This should be done with the unit off and cool, in most cases. Although the glass can be cleaned and burn pot scraped while Receiving Bolt the unit is at low burn. 1. Using scraper as shown in Fig. 34and 35, lift the door latch forward and up. 2. Swing the door open to the left, stopping the swing