Bradford-White Corp 50T65F user manual

User manual for the device Bradford-White Corp 50T65F

Device: Bradford-White Corp 50T65F
Category: Water Heater
Manufacturer: Bradford-White Corp
Size: 1.47 MB
Added : 4/16/2013
Number of pages: 28
Print the manual

Download

How to use this site?

Our goal is to provide you with a quick access to the content of the user manual for Bradford-White Corp 50T65F. Using the online preview, you can quickly view the contents and go to the page where you will find the solution to your problem with Bradford-White Corp 50T65F.

For your convenience

If looking through the Bradford-White Corp 50T65F user manual directly on this website is not convenient for you, there are two possible solutions:

  • Full Screen Viewing - to easily view the user manual (without downloading it to your computer), you can use full-screen viewing mode. To start viewing the user manual Bradford-White Corp 50T65F on full screen, use the button Fullscreen.
  • Downloading to your computer - You can also download the user manual Bradford-White Corp 50T65F to your computer and keep it in your files. However, if you do not want to take up too much of your disk space, you can always download it in the future from ManualsBase.
Bradford-White Corp 50T65F User manual - Online PDF
Advertisement
« Page 1 of 28 »
Advertisement
Print version

Many people prefer to read the documents not on the screen, but in the printed version. The option to print the manual has also been provided, and you can use it by clicking the link above - Print the manual. You do not have to print the entire manual Bradford-White Corp 50T65F but the selected pages only. paper.

Summaries

Below you will find previews of the content of the user manuals presented on the following pages to Bradford-White Corp 50T65F. If you want to quickly view the content of pages found on the following pages of the manual, you can use them.

Abstracts of contents
Summary of the content on the page No. 1

The Bradford White
Flammable Vapor Ignition Resistant Water Heater
SERVICE
MANUAL
Troubleshooting Guide
and Instruction for Service
(To be performed ONLY by qualified service providers)
For the Bradford White
®
Defender Safety System Models:
MI30T*F(BN,CX) M430T*F(BN,CX)
MI30S*F(BN, CX) M440T*F(BN, CX)
MI303T*F(BN,CX) M4403S*F(BN,CX)
MI40T*F(BN,CX) M4403T*F(BN,CX)
MI403S*F(BN,CX) M450S*F(BN,CX)
MI404T*F(BN,CX) M4503*F(BN,CX)
MI503*F(BN,CX) M460T*F(BN,CX)
MI50L*F(BN,CX) M1XR403S*F(BN,CX)
MI504S*F

Summary of the content on the page No. 2

FLAMMABLE VAPOR IGNITION RESISTANT WATER HEATERS Table of Contents Page Service Procedure Introduction 3 --- Trouble shooting Chart 4 - - - Inner Door Gasket Removal, Inspection, Replacement and Installation 5RG-I Thermocouple Testing and Replacement 8R G-II Pilot Assembly Inspection Cleaning and Replacement 10 RG-III Piezo Igniter and Electrode Testing 11 RG-IV Combination Thermostat/Gas Valve Testing and Replacement 12 RG-V Burner Operation Inspection, Adjustment, Cleaning and

Summary of the content on the page No. 3

INTRODUCTION ® The Bradford White DEFENDER Safety System ® The Bradford White DEFENDER Safety System was designed to resist the ignition of flammable vapors that can occur outside of the water heater. Use and installation are nearly identical to previous versions of atmospherically fired and vented water heaters. A number of exclusive design features are incorporated in the system that will require additional knowledge on the part of the qualified service provider. The following information will

Summary of the content on the page No. 4

TROUBLESHOOTING CHART Flammable Vapor Ignition Resistant Water Heaters SERVICE SYMPTOM PROBABLE CAUSE CORRECTIVE ACTION PROCEDURE 1. Turn on gas supply and/or check line 1. See Service Procedure 1. No incoming gas or too low gas pressure. RG-V, Page 12. pressure. 2. Review lighting instruction. Set 2. Gas control knob set to wrong position. combination/thermostat 4. See Service Procedure 3. Pilot light button not being fully gas valve to correct position. RG-III, P

Summary of the content on the page No. 5

SERVICE PROCEDURE RG-I Inner Door/Gasket Removal, Inspection Replacement and Reinstallation For White Rodgers Control, depress knob slightly and rotate clockwise to the “OFF” position. Inner Door Removal Procedure Step 1. Rotate knob of the combination thermostat/gas valve to the “OFF” position. For Robertshaw Control, rotate knob clockwise to the “OFF” position. Step 2. Remove outer jacket burner access door Step 3. Inner Door Removal. a) Disconnect resettable thermal switch wire leads (le

Summary of the content on the page No. 6

SERVICE PROCEDURE RG-I Inner Door/Gasket Removal, Inspection Replacement and Reinstallation Installation of Inner Door With Gasket. WARNING Step 7. Clean any residual gasket residue or other debris Stripped fastener connections may allow from combustion chamber surface before installing the inner door/gasket assembly. for seal breach of inner door. A seal breach may result in a fire or explosion Step 8. Place the left side inner door into position first. causing property damage, personal i

Summary of the content on the page No. 7

SERVICE PROCEDURE RG-I Inner Door/Gasket Removal, Inspection Replacement and Reinstallation Step 10. Firmly place right side inner door flange against the left side inner door flange and secure with two ¼” drive screws from step 3c. DO NOT OVER TIGHTEN SCREWS. Step 11. Align right side inner door to combustion chamber and verify the fastener holes of the combustion chamber are aligned with the right side inner door slotted opening. Verify seal integrity around combustion opening. Secure right

Summary of the content on the page No. 8

SERVICE PROCEDURE RG-II Thermocouple Testing and Replacement CLOSED CIRCUIT THERMOCOUPLE TESTING (White Rodgers Control) Step 1. Closed circuit testing is the preferred method for testing thermocouple. Following the lighting instruction label on the heater, proceed to light the pilot and allow to operate for three minuets. If the pilot will not stay lit, hold the pilot button (located on the combination thermostat/gas valve) down during this test Step 2. Using a multimeter capable of measuring

Summary of the content on the page No. 9

SERVICE PROCEDURE RG-II Thermocouple Testing and Replacement OPEN CIRCUIT THERMOCOUPLE TESTING Step 1. Disconnect thermocouple from combination thermostat/gas valve. Step 2. Using a multimeter capable of measuring millivolts, connect one alligator clip to the end ball or contact portion of the thermocouple, and the other alligator clip to copper portion of the thermocouple. Step 3. Following the lighting instruction label on the heater, proceed to light the pilot and allow to operate for three

Summary of the content on the page No. 10

SERVICE PROCEDURE RG-III Pilot Assembly Inspection, Cleaning and Replacement PILOT/ELECTRODE ASSEMBLY INSPECTION, CLEANING AND REPLACEMENT For White Rodgers Control, depress knob slightly and rotate clockwise to the “OFF” position. Step 1. Turn off gas supply to water heater. Rotate knob of combination thermostat/gas valve to “OFF” position. For Robertshaw Control, rotate knob clockwise to the “OFF” position. Step 2. Remove outer jacket door. Step 3. Remove right side of inner door per SERVI

Summary of the content on the page No. 11

SERVICE PROCEDURE RG-IV Piezo Igniter, Electrode Testing and Replacement PIEZO IGNITER, ELECTRODE TESTING AND REPLACEMENT With the pilot not in operation (no pilot flame) you can check the Piezo and electrode circuit by viewing pilot thru the sight glass located on the inner door and observing the spark action. Step 1. Remove outer jacket door. Step 2. Repeatedly depress the Piezo igniter while viewing the pilot thru the sight glass. If a spark is present, the circuit is OK. If there is no spar

Summary of the content on the page No. 12

SERVICE PROCEDURE RG-V Combination Thermostat/Gas Valve Testing and Replacement Combination Thermostat/Gas Valve Testing and Replacement The combination thermostat/gas valve is a non repairable device. If trouble shooting has determined a problem with the combination thermostat/gas valve, it must be replaced. If the burner and/or pilot do not function, service checks for gas pressure, thermocouple output, magnet assembly and ECO are to be performed. If these check OK, the combination thermosta

Summary of the content on the page No. 13

SERVICE PROCEDURE RG-V Combination Thermostat/Gas Valve Testing and Replacement THERMOCOUPLE TESTING See SERVICE PROCEDURE RG-II MAGNET ASSEMBLY TESTING (White Rodgers Control) Step 1. Following the lighting instruction label on the heater, proceed to light the pilot and allow to operate for three minuets. If the pilot will not stay lit, hold the pilot button (located on the combination thermostat/gas valve) down during this test Step 2. Using a multimeter capable of measuring millivolts, co

Summary of the content on the page No. 14

SERVICE PROCEDURE RG-V Combination Thermostat/Gas Valve Testing and Replacement ECO (Energy Cut Off) TESTING Step 1. Disconnect thermocouple from combination thermostat/gas valve. Step 2. Using a multimeter capable of measuring Ohms (or continuity), attach one lead (alligator clip) to the pilot tube. Insert the other lead (probe) fully into the magnet opening, Be sure the probe makes contact only at the top center of the magnet opening. Do not allow the probe to make contact with the threaded si

Summary of the content on the page No. 15

SERVICE PROCEDURE RG-V Combination Thermostat/Gas Valve Testing and Replacement Step 7. Removal of combination thermostat/gas valve. a) Disconnect main burner feedline (¾” wrench), pilot tube (7/16" wrench) and thermocouple (3/8" wrench) from combination thermostat/gas valve & remove burner from combustion chamber. NOTE: Feed line nut for natural gas control uses right hand threads, LP control uses left hand thread. b) Remove piezo bracket with piezo igniter (refer to SERVICE PROCEDURE RG-I

Summary of the content on the page No. 16

SERVICE PROCEDURE RG-V Combination Thermostat/Gas Valve Testing and Replacement Step 9. Reinstallation of inner door assembly. (cont.) b) Clean any gasket residue or other debris from combustion chamber surface before installing the inner door/gasket assembly. c) Position thermocouple, pilot tube and Piezo wire against left side inner door flange gasket. DO NOT ROUTE THROUGH RADIUSED CHANNEL WITH FEEDLINE. Be sure that thermocouple and pilot tube are not in position to interfere with

Summary of the content on the page No. 17

SERVICE PROCEDURE RG-VI Burner Operation Inspection, Adjustment Cleaning and Replacement MAIN BURNER: Inspection, Adjustment, Cleaning and Replacement At periodic intervals (not more then 6 months) a visual inspection should be made of the main burner for proper operation and to insure no debris accumulating. Main burner should light smoothly from pilot and burn with a blue flame with a minimum of yellow tips. Steel burner models have a self adjusting air mixture and do not have an adjustable a

Summary of the content on the page No. 18

SERVICE PROCEDURE RG-VI Burner Operation Inspection, Adjustment Cleaning and Replacement MAIN BURNER: Inspection, Adjustment, Cleaning and Replacement (cont.) Step 3. Fully inspect inner gasket per SERVICE PROCEDURE RG-I, step 4. Replace gasket if required following SERVICE PROCEDURE I, steps 5 & 6. Step 4. Be certain that thermocouple, pilot tube and piezo wire are routed by inner door flange as shown and Reinstall inner door per SERVICE PROCEDURE RG-I, step 10 and 11. Position thermocouple,

Summary of the content on the page No. 19

SERVICE PROCEDURE RG-VI Burner Operation Inspection, Adjustment Cleaning and Replacement BURNER CLEANING (Cont.) Step 5. Disconnect (unscrew) Main burner (stamped steel “B” burner) from main burner orifice or on cast iron burners (“C” burner), loosen air shutter & disconnect (unscrew) feedline from burner. Step 6. Remove main burner orifice from feed line (½” wrench on steel burner, 3/8" wrench on cast iron). Inspect and clean if necessary. Step 7. Remove pilot assembly, refer to SERVICE PROCED

Summary of the content on the page No. 20

SERVICE PROCEDURE RG-VII Resetting Thermal Switch Testing and Replacement RESETTABLE THERMAL SWITCH CONTINUITY TESTING Step 1. Remove outer jacket door. Step 2. Disconnect wire leads from resettable thermal switch. Step 3. Using a multimeter capable of measuring continuity (Ohms), place one probe of meter on one of the brass connection tabs of the resettable thermal switch, and the remaining probe on the other connection tab. Step 4. If continuity is indicated, the switch is closed, allowing mil


Alternative user manuals
# User manual Category Download
1 Bradford-White Corp -13 User manual Water Heater 30
2 Bradford-White Corp -12 User manual Water Heater 14
3 Bradford-White Corp -15 User manual Water Heater 15
4 Bradford-White Corp 203-B User manual Water Heater 9
5 Bradford-White Corp 103-B User manual Water Heater 7
6 Bradford-White Corp 105-B User manual Water Heater 1
7 Bradford-White Corp 216-B User manual Water Heater 1
8 Bradford-White Corp 238-37281-00R User manual Water Heater 3
9 Bradford-White Corp 238-16152-00F User manual Water Heater 1
10 Bradford-White Corp 238-44422-00G User manual Water Heater 2
11 Bradford-White Corp 238-44219-00J User manual Water Heater 0
12 Bradford-White Corp 238-47808-00A User manual Water Heater 0
13 Bradford-White Corp 355-B User manual Water Heater 0
14 Bradford-White Corp 25X-78B-3N User manual Water Heater 0
15 Bradford-White Corp 44219J User manual Water Heater 1
16 A.O. Smith 000 User manual Water Heater 8
17 A.O. Smith 101 User manual Water Heater 3
18 A.O. Smith 12 40GPC T 100 User manual Water Heater 4
19 A.O. Smith 104 Series User manual Water Heater 3
20 A.O. Smith 104 - 110 User manual Water Heater 6