VENTURA 150 MPC-5000
OWNER’S MANUAL
Section 1…………..Installation, Operation, Maintenance
Section 2………………….……...Controls & Programming
Spectra Watermakers, Inc.
20 Mariposa Road, San Rafael, CA 94901
Phone 415-526-2780 Fax 415-526-2787
E-mail: spectra@spectrawatermakers.com
www.spectrawatermakers.com
Rev. Feb-08-06
Summary of the content on the page No. 2
2
Summary of the content on the page No. 3
Table of Contents Section 1 Page Number Installation Introduction ......................................................................................................................... 5 Getting Started..................................................................................................................... 6 Installation Basics ............................................................................................................... 7 Ventura Plumbing Schematic......
Summary of the content on the page No. 4
4
Summary of the content on the page No. 5
Introduction to the Ventura 150 MPC The Ventura represents the finest watermaker for small and midsized yachts available today. The Spectra Clark Pump is matched to a 21” high rejection membrane. Properly installed and maintained it will supply years of reliable service. The MPC-5000 control provides the ultimate in operational convenience and reli- ability. Note that prudent operation is required with any marine equipment. Always maintain enough reserve water to get safely into your next po
Summary of the content on the page No. 6
Getting Started Unpack the system and inspect it to make sure that it has not been damaged in shipment. Refer to the shipping list for your system to make sure you have received all of the compo- nents listed. Do not discard any packaging until you have found and identified all of the parts. The small installation parts are listed on the kit list. Warning! We will not be held responsible for shortages and/or freight damage that are not reported within thirty days of the ship date.
Summary of the content on the page No. 7
Installation Basics Thruhull Not Supplied. • Read the directions! • Avoid tight hose bends and excessive runs • Use heavy gauge wire • Install feed pump as low as possible • Use a dedicated thruhull with scoop type strainer Flow Thru-hulls It is mandatory that a dedicated 1/2” to 3/4” forward facing scoop type intake thru-hull and seacock be installed. Install the intake for the system close to the middle and as far below the water line as possible. Thru-hulls in the bow area are
Summary of the content on the page No. 8
Ventura 150 MPC Plumbing Brine Discharge thru hull place above waterline or tee brine into another visible drain. Spectra Clark Pump. Mount in a cool location. May Plastic fittings should have 3-4 wraps of Teflon be oriented in any position and can be well above tape and will thread almost all the way in. Leave waterline. Leave access to the pressure relief valve. the first pipe thread uncoated. Avoid getting dirt Do not mount over electrical equipment. Use supplied or debris in the
Summary of the content on the page No. 9
Feed Pump Relocation If you do not have adequate space to install the feed pump inlet module it is possible to re- move and relocate the feed pump. Before you install the module, disconnect the hose that connects the feed pump to the module plumbing. Remove the cooling fan and the heat sink from the pump. Both are friction fits with no fasteners. Remove the 4 machine screws hold- ing the pump to the module. Cooling fan Machine Screws Heat sink With the pump on a flat surface. Remove the
Summary of the content on the page No. 10
Product Water Plumbing Product water tubing is 1/4”(6mm) on the Ventura 150 models. See the Parker tube fitting as- sembly diagram next page. Product water is pre-plumbed from the membrane into the electric diversion valve. The diversion valve will reject product water into the overboard brine stream until good quality is measured by the MPC-5000 control. Product water is then diverted into the fresh water tank. Product to tank. Route the product water into the top of the tank, or a tee
Summary of the content on the page No. 11
Product Tube Fitting Assembly Spacer O-ring Grab Ring Body Nut Tubing Step 1: Dissemble fitting components 1/2" max Step 2: Install the Nut first then use the bevelled side of the Spacer to push the Grab Ring onto the tube no more than 1/2". Slip the O-ring over the tube to hold the Spacer in place. If the Grab Ring is pushed too far, trim back the tube so about 1/4" of tube extends past the O-ring. Step 3: Gently fit the tube into the body and loosely thread on the nut. Step 4: Push
Summary of the content on the page No. 12
Membrane Pressure Vessel Relocation Use ONLY Dayco Imperial Nylo-Seal 88-NSR-1/2 tubing for high pressure connections. Pay attention to the direction and flow path of the tubing before disassembly. Make sure that you reinstall the tubing in the same manner. Rotate the 90 degree high pressure tube fittings on the Clark Pump for ideal tube runs. The high pressure fittings are typically pre- installed at the factory. These fittings seal with an O-ring and require no Teflon tape or pipe dope. L
Summary of the content on the page No. 13
Spectra High Pressure Tube Fitting Assembly Use ONLY Dayco Imperial Nylo-Seal 88-NSR-1/2 tubing for high pressure connections. Carefully fit and measure the tubing before cutting with a sharp razor knife or hose cutter and remove any burrs. Minimum tubing bend radius is 6”. Route tubing away from excessive heat sources and secure from vibration and chafe. Have at least one shallow bend in the tube assembly after it is installed. Refer to figure 1. If a fitting has been dissembled, rea
Summary of the content on the page No. 14
MPC-5000 Wiring Mount the control box on a vertical surface with the wire grommets down, central to the other system components. Make sure the cables will reach all of the modules to avoid splices. Filter Sensor harness Control cable 50’ (15.2M) MPC-5000 display. Mount in 6’ (2M) Protect connector while routing through dry central location. Only con- the vessel. Control Box nect the MPC “plug in” cable. Fresh water flush feed 15’ (4.5M) Splice to flush valve. Heat con
Summary of the content on the page No. 15
Clark Pump Harness Salinity Probe Roto Flow meter. Diversion Valve. To Roto Flow Meter To Diversion Valve To Salinity Probe The RotoFlow meter measures product flow. It is supplied with a three pin plug-in connector. Plug it in to the RotoFlow cable and seal the connection with the supplied heat shrink tubing. The salinity probe uses a telephone style jack and plug. Plug it in and slide the black plastic boot over the sensor to waterproof the connection. The dive
Summary of the content on the page No. 16
Tank Switch Installation and Operation: There are two sets of terminals on the MPC-5000 PCB that can be used in four different con- figurations to automatically start and stop the watermaker, or to automatically stop the water- maker when the tank(s) are full without the auto start feature. These terminals are on the green ten pin connector and are labeled “Float Switch 1” and “Float Switch 2.” Float Switch 1 is the tank full switch and Float Switch 2 is the tank empty switch. If t
Summary of the content on the page No. 17
17
Summary of the content on the page No. 18
Ventura MPC New System Start-Up and Testing Avoid running the Ventura system if the vessel is in contaminated water, such as in a harbor or canal. The system should be fully tested before leaving port. If the location or weather prevents proper testing refer to the section “Dry Testing.” Warning! Damage may occur if the purge sequence is bypassed and the membrane is pressurized with storage chemical in it. First check that: • Thru-hull inlet valve is open and the brine discharge va
Summary of the content on the page No. 19
The system will go into a start mode and the feed pump will start shortly after. The system should prime within 60-90 seconds. Check the strainer and the brine discharge for water flow. There should be few bubbles anywhere in the intake hoses and the feed pump should sound smooth after priming. After confirming that the system is primed, inspect for leaks. Note: The reject light will be on whenever the product water is being rejected or not being made. When the product water is below 750 P
Summary of the content on the page No. 20
MPC Display Modes Scroll through the modes with the alarm display key. Product The Ventura will produce 6- 6.5 GPH (26-27 LPH) Salinity This may not show any lit bars on a new system. Each square represents 100 ppm. System re- jects water higher than 750 PPM. LED lights (Reject, Good) indicate product mode. Feed Water Pressure range 60-70 PSI (4.2-5 BAR) Filter Condition When filters become partially clogged the MPC-5000 will alarm “Service Prefilters”. If the filters become fully