Vermont Casting 3966 user manual

User manual for the device Vermont Casting 3966

Device: Vermont Casting 3966
Category: Ventilation Hood
Manufacturer: Vermont Casting
Size: 0.94 MB
Added : 3/18/2014
Number of pages: 44
Print the manual

Download

How to use this site?

Our goal is to provide you with a quick access to the content of the user manual for Vermont Casting 3966. Using the online preview, you can quickly view the contents and go to the page where you will find the solution to your problem with Vermont Casting 3966.

For your convenience

If looking through the Vermont Casting 3966 user manual directly on this website is not convenient for you, there are two possible solutions:

  • Full Screen Viewing - to easily view the user manual (without downloading it to your computer), you can use full-screen viewing mode. To start viewing the user manual Vermont Casting 3966 on full screen, use the button Fullscreen.
  • Downloading to your computer - You can also download the user manual Vermont Casting 3966 to your computer and keep it in your files. However, if you do not want to take up too much of your disk space, you can always download it in the future from ManualsBase.
Vermont Casting 3966 User manual - Online PDF
Advertisement
« Page 1 of 44 »
Advertisement
Print version

Many people prefer to read the documents not on the screen, but in the printed version. The option to print the manual has also been provided, and you can use it by clicking the link above - Print the manual. You do not have to print the entire manual Vermont Casting 3966 but the selected pages only. paper.

Summaries

Below you will find previews of the content of the user manuals presented on the following pages to Vermont Casting 3966. If you want to quickly view the content of pages found on the following pages of the manual, you can use them.

Abstracts of contents
Summary of the content on the page No. 1

C
N
E
R
G
T
I
INSTALLER / CONSUMER
SAFETY INFORMATION
PLEASE READ THIS MANUAL
BEFORE INSTALLING AND USING
APPLIANCE.
Pinnacle & Stardance
WARNING!
Direct Vent, Rear Vent
IF THE INFORMATION IN THIS
Gas Heater
MANUAL IS NOT FOLLOWED
EXACTLY, A FIRE OR EXPLOSION
Models SDVR, PDV20: 3920, 3926,
MAY RESULT CAUSING PROP-
3930, 3936, 3960, 3966, 3970,
ERTY DAMAGE, PERSONAL IN-
3976, 4065, 4070, 4075, 4080
JURY OR LOSS OF LIFE.
—Do not store or use gasoline or
other flammable vapors and
liquids in the

Summary of the content on the page No. 2

Pinnacle & Stardance Direct Vent - Rear Vent Gas Heaters Table of Contents PLEASE READ THE INSTALLATION & OPERATING INSTRUCTIONS BEFORE USING APPLIANCE. Thank you and congratulations on your purchase of a Vermont Castings stove. IMPORTANT: Read all instructions and warnings carefully before starting installation. Failure to follow these instructions may result in a possible fire hazard and will void the warranty. Installation & Operating Instructions Stove Dimensions .........................

Summary of the content on the page No. 3

Pinnacle & Stardance Direct Vent - Rear Vent Gas Heaters Installation & Operating Instructions The Pinnacle (PDV20) and Stardance (SDVR) Direct WARNING: Operation of this heater when not con- Vent Room Heater, Model Nos. 3920, 3926, 3930, 3936, nected to a properly installed and maintained venting 3960, 3966, 3970, 3976, 4065, 4070, 4075, 4080, are system can result in carbon monoxide (CO) poison- vented gas appliance listed to ANSI Standard Z21.88b- ing and possible death. 2002 and CSA-2.33b-

Summary of the content on the page No. 4

Pinnacle & Stardance Direct Vent - Rear Vent Gas Heaters Stove Dimensions - Pinnacle Direct Vent Gas Heater 5" (140mm) 17" (432mm) Flue Transition Connector (For fireplace installation only) 24³⁄₈" 25¹⁄₄" (619mm) (641mm) 22³⁄₈" (568mm) 16³⁄₈" 26¹⁄₂" (673mm) (400mm) 3457 Fig. 1 PDV20 dimensions. Stove Dimensions - Stardance Direct Vent Gas Heater 7" (178mm) C Valve L Inlet 26³⁄₄" (680mm) 26" (660mm) 24" (610mm) Valve Inlet C L 3" (76mm) 25" 14" 3457 (635mm) (356mm) Fig. 2 SDVR dimensions. 20

Summary of the content on the page No. 5

Pinnacle & Stardance Direct Vent - Rear Vent Gas Heaters Clearance Requirements WARNING: Minimum Clearances to Combustible Materials • Always maintain required clearances (air spaces) to nearby combustibles Measure side clearances as shown in Figures 3, 4 and to prevent fire hazard. Do not fill air spaces with 5 from the outer edge of the cast iron stove top. insulation. All venting components must Measure rear clearances from the outermost surface of maintain a 1" (25mm) clearance to combustib

Summary of the content on the page No. 6

Pinnacle & Stardance Direct Vent - Rear Vent Gas Heaters 9" Alcove Installation 9" (230mm) (230mm) Max. Mantel Max. Mantel Width Width 6" 6" (150mm) (150mm) Sidewall/ Sidewall/ See See Trim Trim Fig. 6 Fig. 6 2¹⁄₂" 2¹⁄₂" SDVR (63mm) PDV20 (63mm) Rear Wall ST381 Rear Wall ST381a Fig. 5 Alcove installation. Hearth Requirements Mantel Clearances The PDV20 and SDVR Heaters must be installed on Combustible rigid flooring. When the heater is installed directly on Mantel or Trim Materials any combus

Summary of the content on the page No. 7

Pinnacle & Stardance Direct Vent - Rear Vent Gas Heaters Horizontal Termination Pinnacle / Stardance Direct Vent / Rear Vent The vent must rise vertically a minimum of 24” Certified to: (610mm) after the first elbow directly off the back of the unit, before the next elbow. The horizontal run may ANSI Z21.88b-2002 / CSA Z2.33b-2002 extend up to 20’ (6m) and include a vertical rise of up Vented Gas Fireplace Heaters to 40’ (12m). (Fig. 7) Horizontal termination must also meet the criteria shown in

Summary of the content on the page No. 8

Pinnacle & Stardance Direct Vent - Rear Vent Gas Heaters Vertical Termination Vent Termination Clearances A vertical vent system must terminate no less than 8' When planning the installation, consider the location of (2.44m) and no more than 40’ (12m) above the appli- the vent terminal and clearances. Some of the most ance flue collar. A 2¹⁄₄" restrictor plate (supplied) must common clearances to keep in mind are shown in be used (where specified) in all vertically terminated Figure 9. vent syst

Summary of the content on the page No. 9

Pinnacle & Stardance Direct Vent - Rear Vent Gas Heaters Vent Termination Clearances Your stove is approved to be vented either through the There must not be any obstruction such as bushes, side wall, or vertical through the roof. garden sheds, fences, decks or utility buildings within 24" from the front of the termination hood. • CFM Specialty Home Products does not require any opening for inspection of vent pipe. Do not locate termination hood where excessive snow • Only CFM Corporation ventin

Summary of the content on the page No. 10

V V Operable Pinnacle & Stardance Direct Vent - Rear Vent Gas Heaters General Venting Information - Termination Location INSIDE CORNER DETAIL G V N H N A D E B C B Fixed Fixed L V B V Closed Closed V Fixed Operable G Closed F V V B M V G B J X B X I V K V A A VENT TERMINATION X AIR SUPPLY INLET AREA WHERE TERMINAL IS NOT PERMITTED V CFM145a 1 2 Canadian Installations US Installations A = Clearance above grade, veranda, porch, 12” (30cm) 12” (30cm) deck, or balcony B = Clearance to window or door

Summary of the content on the page No. 11

Pinnacle & Stardance Direct Vent - Rear Vent Gas Heaters Termination Clearances Termination clearances for buildings with combustible and noncombustible exteriors. Inside Corner Recessed Location Outside Corner D B = C C Combustible A = 6"(152mm) Combustible E A 6"(152mm) Noncombustible V V 2"(50mm) Noncombustible 2"(50mm) V B Balcony - Balcony - with no side wall with perpendicular side wall C = Maximum depth of 48" (1219mm) for recessed H G location. V V D =

Summary of the content on the page No. 12

Pinnacle & Stardance Direct Vent - Rear Vent Gas Heaters Vertical Termination Kit, 7/12-12/12 Pitch 7TDVSKVB Vent Components (1) 7/12 - 12/12 Flashing The following kits are available to meet the needs of most and all of the other Vertical Termination parts. installations. All pipe has a 7" outer diameter and includes a Vertical Termination, Flat Roof 7DVSKVF 4" diameter inner section. A (CG) designation indicates the part is finished in Charcoal Gray paint. Consult your dealer (1) Flat Flashin

Summary of the content on the page No. 13

Pinnacle & Stardance Direct Vent - Rear Vent Gas Heaters Installation Unpack the Stove The stove is shipped fully assembled on its back. 1/4-20 x 3/8” Unpack the stove and carefully set it upright. Hex Head Bolt CAUTION Bracket Porcelain enamelled surfaces are fragile. Handle porcelain enamelled castings tenderly. Familiarize Snapstat yourself with the assembly steps before you begin and proceed with deliberation and care. If possible, have assistance available. 1/2” Sheet FK101a Metal Screws Pl

Summary of the content on the page No. 14

Pinnacle & Stardance Direct Vent - Rear Vent Gas Heaters 2. Locate the vent opening on the wall. Refer to Figures 17, 18 & 19 to determine the top of the opening centerline. It may be necessary to first position the stove and measure to find the hole location. Depending on whether the wall is made of combustible materials, cut the opening to the size shown in Figure 17. Combustible wall openings must be framed as shown in Figure 17. Retaining Nut Rheostat Knob Rheostat FK104 Sealant Fig. 14 Att

Summary of the content on the page No. 15

Pinnacle & Stardance Direct Vent - Rear Vent Gas Heaters 9³⁄₈” W x 10³⁄₈” H Firestop Wall Opening Ventilated Wall Plate - Wall Sleeve - Open End Down Seal Around Finishing Collar 59¹⁄₄" (1505mm) 25³⁄₄" (654mm) to Top of Opening Seal Around Terminal ST400 ST131c Fig. 19 PDV20 with Rear Vent Kit 7TFSRSK installation. Fig. 20 Minimum wall thimble centerline. 3. Measure the wall thickness and cut the wall sleeve sections to proper length (MAXIMUM 12”). Assemble the sleeve with the #8 sheet metal

Summary of the content on the page No. 16

Pinnacle & Stardance Direct Vent - Rear Vent Gas Heaters 4. Attach the elbow to the starter pipe. Vent Opening - Combustible Wall 9³⁄₈" • Run a bead of sealant about 1/2” from end of the (240mm) starter pipe and attach the assembly to the stove using three 1/4-20 x 3/8” Phillips screws provided in 9³⁄₈" the parts bag. (Fig. 22) (240mm) 5. Install the first elbow and secure using three sheet metal screws. Insert the elbow over the stove flue collar. Also, be sure to align holes on the pipe with

Summary of the content on the page No. 17

Pinnacle & Stardance Direct Vent - Rear Vent Gas Heaters Trim Collar Wall Sleeve X ST216 Wall Plate Fig. 28 Install the horizontal pipe and wall plate parts. Seal Both Terminal Ends ST478 Fig. 26 Determine the vertical pipe length. the elbow to the outside wall face, about 2” or the distance required if installing a second 90° elbow. (Fig. 27) 8. Slip the wall plate and trim collar over the interior end of the horizontal pipe and install into the wall Caulk Plate Joint with sleeve. Seal the jo

Summary of the content on the page No. 18

Pinnacle & Stardance Direct Vent - Rear Vent Gas Heaters 6. Level the soil to maintain a 4” clearance below the Vertical (Through the Roof) snorkel. Vent Assembly If the foundation is recessed, use extension brackets (not supplied) to fasten the lower portion of the NOTE: All vertically terminated installations must, snorkel. Fasten the brackets to the wall first, and where specified, use the 2¹⁄₄” restrictor plate, to then fasten to the snorkel with self-tapping #8 x 1/2” comply with Vertical T

Summary of the content on the page No. 19

Pinnacle & Stardance Direct Vent - Rear Vent Gas Heaters 8. Install appropriate pipe sections until the vent run Vertical Through Existing Chimney reaches above the flashing. The enlarged ends of The heater must be vented to the outdoors through an the vent sections always face downward. existing masonry or prefabricated fireplace chimney 9. Install the storm collar and seal around the joints. (Fig. system through the roof. 34) The heater is approved to be vented to the outdoors 10. Add addition

Summary of the content on the page No. 20

Pinnacle & Stardance Direct Vent - Rear Vent Gas Heaters 6. Apply high-temperature sealant to the top of the chimney. Feed the two liners down through the Fireplace Vent System B chimney flue and damper opening. Fasten the termination assembly to the chimney with the four B set screws (C) provided. B A 7. Trim the flex liners as needed. Each should be only D long enough to connect to the Transition Connector. B C There should be no sag in either flex liner when the C stove is in place. 8. Attac


Alternative user manuals
# User manual Category Download
1 Vermont Casting 360DVS3 User manual Ventilation Hood 3
2 Vermont Casting 3936 User manual Ventilation Hood 0
3 Vermont Casting 360DVSR User manual Ventilation Hood 0
4 Vermont Casting 3960 User manual Ventilation Hood 0
5 Vermont Casting 360DVSL User manual Ventilation Hood 0
6 Vermont Casting 3926 User manual Ventilation Hood 0
7 Vermont Casting 3970 User manual Ventilation Hood 0
8 Vermont Casting 3930 User manual Ventilation Hood 0
9 Vermont Casting 36LDVR User manual Ventilation Hood 0
10 Vermont Casting 3LDVT User manual Ventilation Hood 0
11 Vermont Casting 36LDVT 39LDVT User manual Ventilation Hood 0
12 Vermont Casting 4065 User manual Ventilation Hood 0
13 Vermont Casting 3976 User manual Ventilation Hood 0
14 Vermont Casting 4075 User manual Ventilation Hood 2
15 Vermont Casting 4080 User manual Ventilation Hood 0
16 Sony SH-L35W User manual Ventilation Hood 0
17 Air King AIF8X User manual Ventilation Hood 3
18 Acme Kitchenettes Koolmaster PP-32 User manual Ventilation Hood 0
19 Air King AIF10X User manual Ventilation Hood 0
20 Agilent Technologies 31A User manual Ventilation Hood 0