Summary of the content on the page No. 1
more than 10cm
more than 10cm
more than 10cm
more than 15cm
Installation Manual of Room Air Conditioner
Read this manual before installation
Explain sufficiently the operating means to the user
according to this manual.
Necessary Tools for Installation
1.Driver 5.Torque wrench(17mm,22mm,26mm) 9.Nipper 12.Reamer
2.Hacksaw 6.Pipe cutter 10.Gas leakage detector or
3.Hole core drill 7.Flaring tool soap-and-water solution
4.Spanner(17,19 and 26mm) 8.Knife 11.Measuring tape
Drawing for the install
Summary of the content on the page No. 2
140 500 140 Floor fixing dimensions of the outdoor unit HSU-12CR03-Y (Unit:mm) HSU-18CR03-Y Fix the unit to concrete or block with bolts( 10mm) and nuts firmly and horizontally. Fixing of outdoor unit When fitting the unit to wall surface, roof or rooftop, fix a supporter surely with nails or wires in consideration of earthquake and strong wind. If vibration may affect the house, fix the unit by attaching a vibration-proof mat. Indoor Unit Outdoor Unit Selection of Installation Place Place, ro
Summary of the content on the page No. 3
Indoor unit 1.Fitting of the Mounting Plate and Positioning of the wall Hole When the mounting plate is first fixed 1. Carry out, based on the neighboring pillars or lintels, a proper leveling for the plate to be fixed against the wall, then temporarily fasten the plate with one steel nail. 2. Make sure once more the proper level of the plate, by hanging a thread with a weight from the central top of the plate, then fasten securely the plate with the attachment steel nail. 3. Find the wa
Summary of the content on the page No. 4
Indoor unit 1. Insert the drain hose into the dent of heat insulation materials of indoor unit. 2. Insert the indoor/outdoor electric cable from backside of indoor unit, and pull it out on the front side, then connect them. 3. Coat the flaring seal face with refrigerant oil and connect pipes. Cover the connection part with heat insulation materials closely, and make sure fixing with adhesive tape Heat insulation Piping material Pipe supporting plate Lid for right piping Lid for left pipi
Summary of the content on the page No. 5
Indoor unit When connecting the cable before installing the indoor unit Insert the cable from the back side of the unit, then pull it out on the front side. Loosen the screws and insert the cable ends fully into terminal block, then tighten the screws. Pull the cable slightly to make sure the cables have been properly inserted and tightened. After the cable connection, never fail to fasten the connected cable with the wiring cover. Note: When connecting the cable, confirm the terminal number of
Summary of the content on the page No. 6
Outdoor unit 1.Installation of Outdoor Unit Drawing for the installation of indoor and outdoor units Install according to 2.Connection of pipes To bend a pipe, give the roundness as large as possible not to crush the pipe Connecting the pipe of gas side first makes working easier. Flare nut Half union Forced fastening without careful centering may damage the threads and cause a leakage of gas. Pipe Diameter ( ) Fastening torque Liquid side 6.35mm(1/4") 18N.m Gas side 12.7mm(1/2") 55N.m S
Summary of the content on the page No. 7
Outdoor unit 6.Purging Method:To use vacuum pump Push the air out of the indoor unit and piping as followes: (1) Remove the valve cap on 2-way valve in outdoor unit. (2) Loosen by 1/2 turn the flare nut of gas pipe, which is conneted to 3-way valve 2-way valve 3-way valve. 12.7mm(1/2") 6.35mm(1/4") o (3) Loosen 2-way valve by 90 using hexagon wrench, and after approx. 10 sec tighten it up. Gas comes out through flare nut on wide pipe. If no gas is discharged,
Summary of the content on the page No. 8
1.Power Source Installation The power source must be exclusively used for air conditioner. (Over I0A) In the case of installing an air conditioner in a moist place, please install an earth leakage breaker. For installation in other places, use a circuit breaker as far as possible. 2.Cutting and Flaring Work of Piping Pipe cutting is carried out with a pipe cutter and burs must be removed. After inserting the flare nut, flaring work is carried out. A Pipe diameter( ) Size A(mm) Liquid side 6.3