Greenheck Fan Make-Up Air Unit VSU user manual

User manual for the device Greenheck Fan Make-Up Air Unit VSU

Device: Greenheck Fan Make-Up Air Unit VSU
Category: Air Conditioner
Manufacturer: Greenheck Fan
Size: 2.7 MB
Added : 9/4/2013
Number of pages: 24
Print the manual

Download

How to use this site?

Our goal is to provide you with a quick access to the content of the user manual for Greenheck Fan Make-Up Air Unit VSU. Using the online preview, you can quickly view the contents and go to the page where you will find the solution to your problem with Greenheck Fan Make-Up Air Unit VSU.

For your convenience

If looking through the Greenheck Fan Make-Up Air Unit VSU user manual directly on this website is not convenient for you, there are two possible solutions:

  • Full Screen Viewing - to easily view the user manual (without downloading it to your computer), you can use full-screen viewing mode. To start viewing the user manual Greenheck Fan Make-Up Air Unit VSU on full screen, use the button Fullscreen.
  • Downloading to your computer - You can also download the user manual Greenheck Fan Make-Up Air Unit VSU to your computer and keep it in your files. However, if you do not want to take up too much of your disk space, you can always download it in the future from ManualsBase.
Greenheck Fan Make-Up Air Unit VSU User manual - Online PDF
Advertisement
« Page 1 of 24 »
Advertisement
Print version

Many people prefer to read the documents not on the screen, but in the printed version. The option to print the manual has also been provided, and you can use it by clicking the link above - Print the manual. You do not have to print the entire manual Greenheck Fan Make-Up Air Unit VSU but the selected pages only. paper.

Summaries

Below you will find previews of the content of the user manuals presented on the following pages to Greenheck Fan Make-Up Air Unit VSU. If you want to quickly view the content of pages found on the following pages of the manual, you can use them.

Abstracts of contents
Summary of the content on the page No. 1

Part #457831
VSU Make-Up Air Unit
® ®
Installation, Operation and Maintenance Manual Installation, Operation and Maintenance Manual
Please r Please read and save these instructions. Read car ead and save these instructions. Read carefully befor efully before attempting to assemble, install, operate or maintain the e attempting to assemble, install, operate or maintain the
pr product described. Pr oduct described. Protect yourself and others by observing all safety information. Failur otect your

Summary of the content on the page No. 2

Receiving Inspection and Maintenance during Storage Upon receiving the product check to make sure all While in storage, inspect fans once per month. Keep a items are accounted for by referencing the bill of record of inspection and maintenance performed. lading to ensure all items were received. Inspect If moisture or dirt accumulations are found on parts, each crate for shipping damage before accepting the source should be located and eliminated. At each delivery. Notify the carrier if any

Summary of the content on the page No. 3

Table of Contents Installation Installation 1. Filter/Stand Section Filter/Stand Section . . . . . . . . . . . . . . . . . . . . . .3-4 The unit should be mounted on a concrete slab four Burner/Blower Section ..................... 4 inches thick with a proper gravel drainage bed. Allow Ductwork ................................ 4 one foot on each side of the unit as shown in the Dimensional Data . . . . . . . . . . . . . . . . . . . . . . . . . 5 Concrete Slab and Unit Footprint drawing below

Summary of the content on the page No. 4

4. Complete Installation Installation continued A typical horizontal discharge installation is shown. 2. Burner/Blower Section Gas and/or electrical lines can be connected at this Use a crane and a spreader bar hooked to the factory time. lifting lugs (shown below) to lift and center the unit For upblast units, a duct elbow may be needed to onto the filter stand section. The sections can be turn the ductwork into the building. Follow proper caulked together, but it is not needed with t

Summary of the content on the page No. 5

Dimensional Data Upblast Discharge Elevation View F H K Lifting Lugs C Electrical Controls J A E Gas Controls* 24^ B *Direct Gas units only ^Standard factory clearance. Additional stand heights are available from the factory. Unit Dimensional Data Blower Dimensional Data Unit Weight Housing Blower A B C E Filters F H J K Blower/Heater* Stand/Filter Size Size 40 111 54 95 144 (20) 20x25 220 26 20 68 12 2000 lbs. 700 lbs. All dimensions are shown in inches. * Weights will vary with blower and hor

Summary of the content on the page No. 6

1. Determine the Supply Gas Installation of Direct Gas Piping Requirements The unit’s direct gas nameplate states the requirements IMPORTANT for the gas being supplied to the unit. The direct gas All gas piping must be installed in accordance nameplate is located on the outside of the unit on the with the latest edition of the National Fuel Gas control center side. Minimum gas pressure for Code ANSI/Z223.1 and any local codes that may maximum output apply. In Canada, the equipment shall

Summary of the content on the page No. 7

4. Pipe the Optional Vent Line If an optional vent line is located between the safety shutoff valves it must be piped to the outdoors. WARNING Reference the National Fuel Gas Code for additional vent line requirements. Vent Line Solenoid To Outdoors To Burner From Supply Safety Shut-off Valves Optional Vent Line 5. Test the System for Leaks Check both the supply lines and the factory piping for leaks. Apply a soap and water solution to all piping and watch for bubbling which indicates a le

Summary of the content on the page No. 8

2. Check the Blower Rotation Start-Up - Blower Open the blower access door Refer to the Start-Up Checklist in the Reference and run the blower momentarily section before proceeding further! to determine the rotation. Arrows are placed on the Pre Start-Up Check blower scroll to indicate the Rotate the fan wheel by hand and make sure no parts proper direction or reference Blower are rubbing. Check the V-belt drive for proper alignment Housing the example shown to the right. and tension (a

Summary of the content on the page No. 9

5. Air Volume Measurement & Check Measure the unit’s air volume (cfm) and compare it with it’s rated air volume. If the measured air volume is off, adjust the fan’s RPM by changing/adjusting the drive. NOTE The most accurate way to measure the air volume is by using a pitot traverse method downstream of the blower. Other methods can be used, but should be proven and accurate. IMPORTANT Changing the air volume can significantly increase the motor’s amps. If the air volume is changed, the

Summary of the content on the page No. 10

3. Set the Burner Air Pressure Differential Start-Up Direct Gas With the fan running and discharging 70ºF (21ºC) air, connect a U-Tube manometer to the outer sensing IMPORTANT probes (see below) and measure the static pressure For proper unit function and safety, follow the start- across the burner. up procedure in the exact order that it is presented. 9 Outer Sensing Probes IMPORTANT This start-up should begin after all of the installation 8 procedures and the blower start-up have been co

Summary of the content on the page No. 11

4. Set the Maximum Firing Rate Regulators and Modulating Valves Monitor the unit’s actual temperature rise by placing Remove one wire to Remove cap to access a thermocouple in the unit’s inlet and a second in the send the unit to the maximum firing rate discharge, three duct diameters downstream of the minimum firing rate adjustment burner. Send the unit to maximum fire by disconnecting and isolating the wire connected to Terminal 4 on the Maxitrol 14. While monitoring the units tempe

Summary of the content on the page No. 12

6. Set the Unit’s Operating Temperature Set the operating temperature. The operating temperature setting depends on which Maxitrol controller is used. Maxitrol Series 14 The Maxitrol Series 14 should be set to the desired discharge temperature. The temperature selector is built into the amplifier. Set the discharge temperature Typical: 65ºF Series 14 Discharge Temperature Setting 7. Flame Signal Check To measure the flame signal connect a standard DC voltmeter to the flame amplifier tes

Summary of the content on the page No. 13

Operation - Electrical Electrical Sequence Direct Gas Burner Sequence 1. Supply Fan Contact (S2) Closed 1. Supply Fan Contact Closed • Power passes to damper which opens • Power passes to the supply fan and heat switch • When damper is fully opened, damper relay 2. Heat Contact Closed (D1) is energized an optional N.O. damper limit • Power passes to the heat relay then to the switch (DL1) closes Flame Safeguard • Power passes through a N.C. fault contact on 3. Flame Safeguard (FSG) Seque

Summary of the content on the page No. 14

Troubleshooting Blower Does Not Operate 115 VAC between No Check Main Voltage terminals 102 and 101? (See Blower Start-Up Step #1) Main Disconnect (DS1) Off (Turn Main Disconnect DS1 On) Yes Primary Fuses Blown (Replace Fuses) Main Transformer Defective (Replace Transformer) 24 VAC between No terminals R and X? Yes Main Transformer Defective (Replace Transformer) 24 VAC between No terminals G and X? Yes Supply Switch (S2) Off (Turn Supply Switch (S2) On) 24 VAC between No terminals 7 and X? Yes

Summary of the content on the page No. 15

Troubleshooting Heater Does Not Operate Does not attempt to light (No visible spark) No 24 VAC between terminals W1 and X? Heat Switch (S4) Off Yes (Turn Heat Switch (S4) On) Heat Switch Not Wired (Wire Heat Switch (S4)) No 115 VAC between terminals 102 and 101? Primary Fuses Blown Yes (Replace Fuses) Main Transformer (TR4) Defective (Replace Transformer) No 115 VAC between terminals 103 and 101? Inlet Air Sensor (TS) Holding Yes (Adjust TS setting — Reference Blower Start-Up Step #6) Heat R

Summary of the content on the page No. 16

Troubleshooting Heater Does Not Operate Attempts to light, but no pilot (visible spark) Check inlet gas pressure. Note: The minimum and maximum gas pressures (Direct Gas Start-Up Step #1) for your unit are shown on the direct gas label. (Reference Direct Gas Start-Up – Step #1) Yes Gas pressure between the No minimum and maximum shown on the direct gas label? Correct gas pressure (Reference Direct Gas Start-Up – Step #1) Yes Air in the gas line? Purge gas line (Verify gas at the pilot) No Ch

Summary of the content on the page No. 17

Troubleshooting Heater Does Not Operate Visible pilot Measure the flame signal Note: The flame signal should be steady and when there is a visible pilot above 1.25 VDC with a visible pilot. (Reference Direct Gas Start-Up – Step #7) Flame signal greater No than 1.25 VDC Unit is not grounded (Properly ground unit) Flame rod is grounding out (Adjust the flame rod to avoid contact with the burner or the unit) Yes Cracked porcelain on flame rod (Replace flame rod) Check for proper airflow (Direct

Summary of the content on the page No. 18

Maintenance - Routine Motors CAUTION Motor maintenance is generally limited to cleaning Lock-out the gas and the electrical power to the and lubrication (where applicable). unit before performing any maintenance or service Cleaning should be limited to exterior surfaces only. operations to this unit. Removing dust and grease build-up on the motor assures proper motor cooling. V-Belt Drives V-belt drives must be checked on a regular basis for Motors supplied with grease fittings should be w

Summary of the content on the page No. 19

Maintenance - Fall Bearings Start-Up Repeat the Blower Start-Up Step #5 and Direct Gas Start- The bearings for Greenheck fans are carefully selected Up Steps #1 through #4. This will ensure that the gas and to match the maximum load and operating conditions air are set properly before the heating season begins and of the specific class, arrangement and fan size. The should lead to trouble free operation all winter. instructions provided in this manual and those provided by the bearing manu

Summary of the content on the page No. 20

Reference Typical Control Center Layout 1 5 2 7 3 4 6 12 8 9 10 11 1. Spark Generator 7. Motor Fuses 2. Temperature Selector 8. Heating Inlet Air Switch 3. Amplifier 9. Flame Safeguard 4. 24V Transformer 10. High Limit Switch 5. 120V Transformer 11. Disconnect 6. Transformer Fuses 12. Soft Start Typical Gas Train Layout 1. Spark Generator 2. Temperature Selector High/Low Airflow Switch* View Port Gas Pressure 3. Amplifier 4. 24V Transformer Pilot Solenoid 5. 120V Transformer Modulating V


Alternative user manuals
# User manual Category Download
1 Greenheck Fan Energy Recovery Ventilator ERVe User manual Air Conditioner 1
2 Sony SU-PW2 User manual Air Conditioner 12
3 Sony CV-P12PX User manual Air Conditioner 3
4 Sony MULTI CHANNEL AV RECEIVER STR-DG710 User manual Air Conditioner 31
5 Sony VGN-BX500 User manual Air Conditioner 1
6 Philips 190S5 User manual Air Conditioner 21
7 Philips Comfort-Cire AMC 45 User manual Air Conditioner 7
8 Philips Comfort-Cire AMC 30 User manual Air Conditioner 2
9 Philips CS-E15DB4EW User manual Air Conditioner 4
10 Philips GOGEAR SA3425 User manual Air Conditioner 1
11 Philips 3160 User manual Air Conditioner 7
12 Philips Comfort-Cire AMW User manual Air Conditioner 3
13 Philips Comfort-Cire AMC 25 User manual Air Conditioner 2
14 Philips GoGear SA3446 User manual Air Conditioner 0
15 Philips RAC-18C9 User manual Air Conditioner 4