Xantrex Technology PV100S-208 user manual

User manual for the device Xantrex Technology PV100S-208

Device: Xantrex Technology PV100S-208
Category: Power Supply
Manufacturer: Xantrex Technology
Size: 3.61 MB
Added : 3/24/2014
Number of pages: 124
Print the manual

Download

How to use this site?

Our goal is to provide you with a quick access to the content of the user manual for Xantrex Technology PV100S-208. Using the online preview, you can quickly view the contents and go to the page where you will find the solution to your problem with Xantrex Technology PV100S-208.

For your convenience

If looking through the Xantrex Technology PV100S-208 user manual directly on this website is not convenient for you, there are two possible solutions:

  • Full Screen Viewing - to easily view the user manual (without downloading it to your computer), you can use full-screen viewing mode. To start viewing the user manual Xantrex Technology PV100S-208 on full screen, use the button Fullscreen.
  • Downloading to your computer - You can also download the user manual Xantrex Technology PV100S-208 to your computer and keep it in your files. However, if you do not want to take up too much of your disk space, you can always download it in the future from ManualsBase.
Xantrex Technology PV100S-208 User manual - Online PDF
Advertisement
« Page 1 of 124 »
Advertisement
Print version

Many people prefer to read the documents not on the screen, but in the printed version. The option to print the manual has also been provided, and you can use it by clicking the link above - Print the manual. You do not have to print the entire manual Xantrex Technology PV100S-208 but the selected pages only. paper.

Summaries

Below you will find previews of the content of the user manuals presented on the following pages to Xantrex Technology PV100S-208. If you want to quickly view the content of pages found on the following pages of the manual, you can use them.

Abstracts of contents
Summary of the content on the page No. 1

PV100S-208
PV100S-480
Operation and Maintenance Manual
PV100S 100 kW
Grid-Tied
Photovoltaic
Inverter

Summary of the content on the page No. 2

Summary of the content on the page No. 3

s PV100S 100 kW Grid-Tied Photovoltaic Inverter Operation and Maintenance Manual

Summary of the content on the page No. 4

About Xantrex Xantrex Technology Inc. is a world-leading supplier of advanced power electronics and controls with products from 50 watt mobile units to one MW utility-scale systems for wind, solar, batteries, fuel cells, microturbines, and backup power applications in both grid-connected and stand-alone systems. Xantrex products include inverters, battery chargers, programmable power supplies, and variable speed drives that convert, supply, control, clean, and distribute electrical power. Tr

Summary of the content on the page No. 5

About This Manual Purpose The purpose of this Operation and Maintenance Manual is to provide explanations and procedures for operating, maintaining, and troubleshooting the PV100S 100 kW Grid-Tied Photovoltaic Inverter. Installation instructions are available in the PV100S 100 kW Grid-tied Photovoltaic Inverter Planning and Installation Manual. Scope This Manual provides safety guidelines and information about operating and troubleshooting the unit. Audience This Manual is intended for any

Summary of the content on the page No. 6

About This Manual Conventions Used The following conventions are used in this guide. WARNING Warnings identify conditions or practices that could result in personal injury or loss of life. CAUTION Cautions identify conditions or practices that could result in damage to the unit or other equipment. Important: These notes describe things which are important for you to know, but not as serious as a caution or warning. This Manual contains information for two models of the PV100S 100 kW Grid- Tied

Summary of the content on the page No. 7

About This Manual Abbreviations and Acronyms ANSI American National Standards Institute CCU2 Converter Control Unit 2 CFM Cubic Feet per Minute CW Clockwise DSP Digital Signal Processor FPGA Field Programmable Gate Array GUI Graphical User Interface IEEE Institute of Electrical and Electronics Engineers IGBT Insulated Gate Bipolar Transistor IPM Intelligent Power Module kcmil 1000 circular mils LAN Local Area Network LCD Liquid Crystal Display NFPA National Fire Protection Association PBX Privat

Summary of the content on the page No. 8

vi

Summary of the content on the page No. 9

Important Safety Instructions SAVE THESE INSTRUCTIONS - DO NOT DISCARD This manual contains important safety instructions for the PV100S that must be followed during installation and maintenance procedures. WARNING: Shock Hazard Read and keep this Operation and Maintenance Manual for future reference. Before installing PV100S (either model), read all instructions, cautionary markings, and all other appropriate sections of this manual. Failure to adhere to these warnings could result in severe

Summary of the content on the page No. 10

Safety General Safety Precautions 1. When installing the PV100S use only components recommended or sold by Xantrex. Doing otherwise may result in a risk of fire, electric shock, injury to persons, and will void the warranty. 2. Do not attempt to operate the PV100S if it has been dropped, or received more than cosmetic damage during transport or shipping. If the PV100S is damaged, or suspected to be damaged, see the Warranty section of this manual. 3. To reduce the risk of electrical shock,

Summary of the content on the page No. 11

Safety The terminals are one bolt per pole. See the PV100S 100 kW Grid-tied Photovoltaic Inverter Planning and Installation Manual for the location of these terminals. 5. The AC power conductor wiring interfacing with the AC terminals in the Main Inverter Enclosure are located at TB4-A, TB4-B, and TB4- C. These terminals are to be tightened to a torque value of 275 in-lbs (31.1 Nm) for model PV100S-208 and model PV100S-480. The terminals will accept a conductor size of 350 kcmil. See Figur

Summary of the content on the page No. 12

Safety Operational Safety Procedures Never work alone when servicing this equipment. A team of two is required until the equipment is properly de-energized, locked-out and tagged, and verified de- energized with a meter. Thoroughly inspect the equipment prior to energizing. Verify that no tools or equipment have inadvertently been left behind. Lockout and Tag Safety requirements mandate that this equipment not be serviced while energized. Power sources for the PV100S must be locked-out and ta

Summary of the content on the page No. 13

Safety De-Energize/Isolation Procedure The following procedure should be followed to de-energize the PV100S for maintenance. WARNING The terminals of the DC input may be energized if the PV arrays are energized. In addition, allow 5 minutes for all capacitors within the main enclosure to discharge after disconnecting the PV100S from AC and DC sources. To isolate the PV100S: 1. Turn the ON/OFF switch to the OFF position. 2. Open the DC Interface Disconnect Switch. 3. Open the AC Interface Disc

Summary of the content on the page No. 14

xii

Summary of the content on the page No. 15

Contents Important Safety Instructions - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -vii 1 Introduction Operation Features- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 1–2 Fixed Unity Power Factor Operation - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 1–2 Peak Power Tracking - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -

Summary of the content on the page No. 16

Contents 2 Operation Description of System Operation- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 2–2 Overview - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 2–2 Faults - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 2–2 Operating States - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -

Summary of the content on the page No. 17

Contents 3 Commissioning Commissioning Procedure - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 3–2 Starting the Commissioning Test File - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 3–2 Serial Number - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 3–3 Verify AC Voltage - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -

Summary of the content on the page No. 18

Contents A Specifications System Specifications - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - A–2 Environmental Specifications - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - A–2 Electrical Specifications - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - A–3 Over Voltage, Under Voltage and Frequency Ranges - - - - - - - - - - - - - - - - - - - - - - - - - -

Summary of the content on the page No. 19

Figures Figure 1-1 Maximum Peak Power Tracking - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 1–4 Figure 1-2 PV100S Major Components - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 1–6 Figure 1-3 DC Interface Enclosure - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 1–8 Figure 1-4 AC Interface Enclosure and Transformer Enclosure - - - - - - - - - - - - - - - - - - - - - - - - - 1–9 Figure 1-5 P

Summary of the content on the page No. 20

Figures Figure 2-24 Connection Configuration Screen - General - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -2–35 Figure 2-25 Connection Configuration Screen - Telephone Fault Configuration - - - - - - - - - - - - - -2–36 Figure 2-26 Connection Configuration Screen - General - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -2–36 Figure 2-27 GUI Help Topics - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -2–37 Figure 4-1 LCD showi


Alternative user manuals
# User manual Category Download
1 Xantrex Technology 230 VAC/50 User manual Power Supply 2
2 Xantrex Technology 40 A (XADC-40) User manual Power Supply 6
3 Xantrex Technology 18V 10A User manual Power Supply 1
4 Xantrex Technology 42V 10A User manual Power Supply 5
5 Xantrex Technology 500 User manual Power Supply 0
6 Xantrex Technology 300 PLUS User manual Power Supply 12
7 Xantrex Technology 60 A (XADC-60) User manual Power Supply 2
8 Xantrex Technology 600HD User manual Power Supply 0
9 Xantrex Technology 400R User manual Power Supply 1
10 Xantrex Technology ACCB User manual Power Supply 0
11 Xantrex Technology 700 PLUS User manual Power Supply 0
12 Xantrex Technology 80 A (XADC-80) User manual Power Supply 4
13 Xantrex Technology ACCB-L User manual Power Supply 0
14 Xantrex Technology ACCB-L-L1 User manual Power Supply 0
15 Xantrex Technology APG-XT User manual Power Supply 0
16 Sony AC U50A User manual Power Supply 5
17 Sony AC LS1 User manual Power Supply 2
18 Sony NP-FM30 User manual Power Supply 35
19 Sony NP FX101 User manual Power Supply 1
20 Sony NH-AAA-DA User manual Power Supply 2