Weil-McLain GOLD CGS 550-110-260/0107 user manual

User manual for the device Weil-McLain GOLD CGS 550-110-260/0107

Device: Weil-McLain GOLD CGS 550-110-260/0107
Category: Boiler
Manufacturer: Weil-McLain
Size: 4.07 MB
Added : 10/27/2013
Number of pages: 64
Print the manual

Download

How to use this site?

Our goal is to provide you with a quick access to the content of the user manual for Weil-McLain GOLD CGS 550-110-260/0107. Using the online preview, you can quickly view the contents and go to the page where you will find the solution to your problem with Weil-McLain GOLD CGS 550-110-260/0107.

For your convenience

If looking through the Weil-McLain GOLD CGS 550-110-260/0107 user manual directly on this website is not convenient for you, there are two possible solutions:

  • Full Screen Viewing - to easily view the user manual (without downloading it to your computer), you can use full-screen viewing mode. To start viewing the user manual Weil-McLain GOLD CGS 550-110-260/0107 on full screen, use the button Fullscreen.
  • Downloading to your computer - You can also download the user manual Weil-McLain GOLD CGS 550-110-260/0107 to your computer and keep it in your files. However, if you do not want to take up too much of your disk space, you can always download it in the future from ManualsBase.
Weil-McLain GOLD CGS 550-110-260/0107 User manual - Online PDF
Advertisement
« Page 1 of 64 »
Advertisement
Print version

Many people prefer to read the documents not on the screen, but in the printed version. The option to print the manual has also been provided, and you can use it by clicking the link above - Print the manual. You do not have to print the entire manual Weil-McLain GOLD CGS 550-110-260/0107 but the selected pages only. paper.

Summaries

Below you will find previews of the content of the user manuals presented on the following pages to Weil-McLain GOLD CGS 550-110-260/0107. If you want to quickly view the content of pages found on the following pages of the manual, you can use them.

Abstracts of contents
Summary of the content on the page No. 1

GOLD CGs
Gas-Fired Water Boilers
• Installation • Maintenance
Boiler Manual
• Startup • Parts
This manual must only be used by a qualified heating installer/service technician. Before installing, read all
instructions, including this manual, the burner manual and any related supplements. Perform steps in the order
given. Failuret oc omplyc ould result in severe personalinj ury, deatho r substantialp ropertydamag e.
DO NOT USE BOILER DURING CONS

Summary of the content on the page No. 2

GOLD CGs Gas-Fired Water Boiler — Boiler Manual How it works . . . Control module ① The control module responds to signals from the room thermostat, air pressure switch and boiler limit circuit to operate the boiler circulator, pilot burner, gas valve and inducer. When roomthe rmostat callsf or heat, the c ontrol module startsthe system circulatorand inducer. The control module runs the inducer long enough to purge the boiler flue passage

Summary of the content on the page No. 3

GOLD CGs Gas-Fired Water Boiler — Boiler Manual GOLD CGs Gas-Fired Induced-Draft Water Boiler 3 Part number 550-110-260/0107

Summary of the content on the page No. 4

GOLD CGs Gas-Fired Water Boiler — Boiler Manual Contents Howit works ....................................................2–3 Hazard definitions ............................................... 4 Please read before proceeding ............................ 5 1 Prepare boiler location ...................................6–11 2 Prepare boiler ...............................................12–13 3 Water piping .................................................14–23 4 Ventin

Summary of the content on the page No. 5

GOLD CGs Gas-Fired Water Boiler — Boiler Manual Please read before proceeding Installer User • This manual is for use only by your qualified Read all instructions before in- heating installer/service technician. stalling. Follow all instructions in • Please refer to the User’s Information Manual for proper order to prevent personal your reference. injuryo r death. • We recommend regular service by a qualified • Alsor efer toCGs Venting Supplements. service tec

Summary of the content on the page No. 6

GOLD CGs Gas-Fired Water Boiler — Boiler Manual 1a Prepare boiler location — codes & checklist Installations must followthese codes: • Local, state, provincial, andnat ional codes, la ws,r egulations and ordinances. • National Fuel Gas Code, ANSIZ 3.1–latest edition. • Standard for Controls and Safety Devices for Automatically Fired Boilers, ANSI/ ASME CSD-1, w hen required. • National Electrical Code. • For Canada only: B149.1 or B149.  Installation Cod

Summary of the content on the page No. 7

GOLD CGs Gas-Fired Water Boiler — Boiler Manual 1b Prepare boiler location — clearances Recommended SERVICE clearances Figure 2 Required MINIMUM clearances (Fig. 1) 1. Provide clearances for cleaning and servicing the boiler and for access to controls and components. See Figure1 for recommenda- tions. .  Provide at least screwdriver clearance to jacket front panel screws for removal of front panel for inspection and minor service. If unable to pro

Summary of the content on the page No. 8

GOLD CGs Gas-Fired Water Boiler — Boiler Manual 1c Prepare boiler location — vent system Failure to follow all instructions can result in flue gas spillage and carbon monoxide emissions, causing severe personal injury ord eath. Inspect existing chimney before installing boiler. Failure to clean or replace perforated pipe or tile lining will cause severe personal injury or death. DO NOT COMMON VENT — Do not install the CGs into a common vent

Summary of the content on the page No. 9

GOLD CGs Gas-Fired Water Boiler — Boiler Manual 1d Prepare boiler location — contamination Please review the following information on potential Refer to Table 1 for products and areas which may cause combustionair c ontamination problems. contaminated combustionair . To prevent potential of severe personal injury or death, check for products or areas listed below beforeinstal ling boiler. If anyo f thesec ontaminants are found: • removec ontami

Summary of the content on the page No. 10

GOLD CGs Gas-Fired Water Boiler — Boiler Manual 1e Prepare boiler location — air openings mended in Figure 3 will allow adequate ventilation and Combustion air opening location and sizing combustion air provided the boiler room is not sub- requirements depend on the clearances around jected to negative pressure due to exhaust fans or other the boiler. Check the boiler placement compared to mechanical ventilation devices. Refer to the National Figure1,

Summary of the content on the page No. 11

GOLD CGs Gas-Fired Water Boiler — Boiler Manual Figure 3 Sizing air openings for CGs installations ✷ 11 Part number 550-110-260/0107

Summary of the content on the page No. 12

GOLD CGs Gas-Fired Water Boiler — Boiler Manual 2a Prepare boiler — placement & setup Inlet air box top panel must be in Place boiler/crate near position during boiler operation. position Failure to do so could result in severe personal injury, death or 1. Leave boiler in crate and on pallet until installation substantial propertydamag e. site is ready. . Move entire crate and pallet next to selected loca- tion. 3. Remove crate. Orifice re

Summary of the content on the page No. 13

GOLD CGs Gas-Fired Water Boiler — Boiler Manual 2b Prepare boiler — pressure test 5. Slowly reopen boiler drain valve until test pressure Hydrostatic pressuretest on the pressure/temperature gauge reaches no more Pressure test boiler before attaching water or gas piping than: (except as noted below) or electrical supply. • 45 psigf orb oilersw ith 30 psig relief valve. Prepareboiler for test • 75 psig for boilersw ith 50 psig relief valve. 1. Remove t

Summary of the content on the page No. 14

GOLD CGs Gas-Fired Water Boiler — Boiler Manual 3a Water piping — general information Generalpiping information Circulator If installation is to comply with ASME or Canadian requirements, an ad- The circulator is shipped loose (wiring pre-attached to ditional high temperature limit is needed. Install control in supply piping boiler) to allow you to locate it either in the return or between boiler and isolation valve. Set second control to mini

Summary of the content on the page No. 15

GOLD CGs Gas-Fired Water Boiler — Boiler Manual 3b Water piping — single-zone system Diaphragm-typeor bladder- Closed-type expansion tank type expansion tank (Figure 4) (Figure 5) 1. Ensure expansion tank size will handle boiler and 1. Ensure expansion tank size will handle boiler and system water volume and temperature. Tank must system water volume and temperature. See tank be located in boiler return piping as close to boiler manufacturer’s inst

Summary of the content on the page No. 16

GOLD CGs Gas-Fired Water Boiler — Boiler Manual 3c Water piping — multiple zones Piping multiple zones Piping forradiant heating Follow instructions on pages 14 and 15 to install near- systemsor converted gravity boiler or single-zone piping. (Also refer to Piping for systems radiant heating systems or converted gravity sys- tems,b elow, if ap plicable.) Converted gravity (or steam)systems See Figure 6 or Figure 7, page1 ,  to complete instal- Wh

Summary of the content on the page No. 17

GOLD CGs Gas-Fired Water Boiler — Boiler Manual 3c Water piping — multiple zones (continued) Figure 6 Zoning with circulators Figure 7 Zoning with zone valves — return water 130°F or higher. — return water 130°F or higher. 1 Boiler isolation (balancing) 10 Automatic air vent (with diaphragm-type expansion tank), or connect valves to tank fitting (closed-type expansion tank). DO NOT use an automatic air vent when using closed-type expansion tank. It would allow

Summary of the content on the page No. 18

GOLD CGs Gas-Fired Water Boiler — Boiler Manual 3d Piping — low temp systems the water temperature being supplied to the radiant Primary/secondary (preferred) tubing. bypass piping method Gauge 8 is required on all systems to assure the return Primary/secondary bypass piping is preferred because water temperature is accurately set for a minimum of the flow rate and temperature drop in the heating 130°F. If this gauge is not available however, a

Summary of the content on the page No. 19

GOLD CGs Gas-Fired Water Boiler — Boiler Manual 3d Piping — low temp systems (continued) Figure 8 Primary/secondary piping Figure 9 Primary/secondary piping Zoning with circulators Zoning with zone valves 9 Relief v alve 1 Boiler isolation (balancing) valves 10 Automatic air vent (with diaphragm-type expansion tank), or 2 Flow/check valve connect to tank fitting (closed-type expansion tank). DO NOT use an automatic air vent when using closed-type expansion 3 Sys

Summary of the content on the page No. 20

GOLD CGs Gas-Fired Water Boiler — Boiler Manual 3d Piping — low temp systems (continued) justed using cold (or room temperature) return water BOILER-bypasspiping to the boiler. (When setting the valves without gauge method 4a installed — using cold or room temperature water — assume the return water temperature to be 60°F. Set This piping method (Figures 10 and 11, page  1) is thev alves so gauge 8 reads at least 10°F. called a boiler-bypass


Alternative user manuals
# User manual Category Download
1 Weil-McLain 382-200-305 User manual Boiler 1
2 Weil-McLain 550-141-830/1202 User manual Boiler 1
3 Weil-McLain 94 User manual Boiler 0
4 Weil-McLain 550-141-829/1201 User manual Boiler 1
5 Weil-McLain 68 User manual Boiler 1
6 Weil-McLain 88 User manual Boiler 2
7 Weil-McLain 68V User manual Boiler 0
8 Weil-McLain 550-141-826/1201 User manual Boiler 0
9 Weil-McLain B-66HE User manual Boiler 0
10 Weil-McLain 88 Series User manual Boiler 0
11 Weil-McLain BCP-3 User manual Boiler 4
12 Weil-McLain BCP-8S User manual Boiler 0
13 Weil-McLain A-66E User manual Boiler 0
14 Weil-McLain AFG User manual Boiler 1
15 Weil-McLain BMC User manual Boiler 0
16 Sony HDV 1080I HVR-M15N/M15P User manual Boiler 67
17 Sony HDV 1080I HVR-M25N/M25P User manual Boiler 50
18 A.O. Smith 200 User manual Boiler 2
19 A.O. Smith 201 User manual Boiler 7
20 A.O. Smith 750 & 1000 User manual Boiler 6