Weil-McLain GOLD CGS 550-110-260/0508 user manual

User manual for the device Weil-McLain GOLD CGS 550-110-260/0508

Device: Weil-McLain GOLD CGS 550-110-260/0508
Category: Boiler
Manufacturer: Weil-McLain
Size: 8.63 MB
Added : 10/27/2013
Number of pages: 64
Print the manual

Download

How to use this site?

Our goal is to provide you with a quick access to the content of the user manual for Weil-McLain GOLD CGS 550-110-260/0508. Using the online preview, you can quickly view the contents and go to the page where you will find the solution to your problem with Weil-McLain GOLD CGS 550-110-260/0508.

For your convenience

If looking through the Weil-McLain GOLD CGS 550-110-260/0508 user manual directly on this website is not convenient for you, there are two possible solutions:

  • Full Screen Viewing - to easily view the user manual (without downloading it to your computer), you can use full-screen viewing mode. To start viewing the user manual Weil-McLain GOLD CGS 550-110-260/0508 on full screen, use the button Fullscreen.
  • Downloading to your computer - You can also download the user manual Weil-McLain GOLD CGS 550-110-260/0508 to your computer and keep it in your files. However, if you do not want to take up too much of your disk space, you can always download it in the future from ManualsBase.
Weil-McLain GOLD CGS 550-110-260/0508 User manual - Online PDF
Advertisement
« Page 1 of 64 »
Advertisement
Print version

Many people prefer to read the documents not on the screen, but in the printed version. The option to print the manual has also been provided, and you can use it by clicking the link above - Print the manual. You do not have to print the entire manual Weil-McLain GOLD CGS 550-110-260/0508 but the selected pages only. paper.

Summaries

Below you will find previews of the content of the user manuals presented on the following pages to Weil-McLain GOLD CGS 550-110-260/0508. If you want to quickly view the content of pages found on the following pages of the manual, you can use them.

Abstracts of contents
Summary of the content on the page No. 1

GOLD CGs
Gas-Fired Water Boilers
� Installation � Maintenance
Boiler Manual
� Startup � Parts
This manual must only be used by a qualifi ed heating installer/service technician. Before installing, read all
instructions, including this manual, the burner manual and any related supplements. Perform steps in the order
given. Failure to comply could result in severe personal injury, death or substantial property damage.
DO NOT USE BOILER DURING CONSTRUCTION unless you provide dust-free air to th

Summary of the content on the page No. 2

GOLD CGs Gas-Fired Water Boiler — Boiler Manual How it works . . . Control module ① The control module responds to signals from the room thermostat, air pressure switch and boiler limit circuit to operate the boiler circulator, pilot burner, gas valve and inducer. When room thermostat calls for heat, the control module starts the system circulator and inducer. The control module runs the inducer long enough to purge the boiler fl ue passages, then opens the pilot valve and activates pilot ign

Summary of the content on the page No. 3

GOLD CGs Gas-Fired Water Boiler — Boiler Manual GOLD CGs Gas-Fired Induced-Draft Water Boiler 3 Part number 550-110-260/0508

Summary of the content on the page No. 4

GOLD CGs Gas-Fired Water Boiler — Boiler Manual Contents How it works ....................................................2–3 Hazard defi nitions ............................................... 4 Please read before proceeding ............................ 5 1 Prepare boiler location ...................................6–11 2 Prepare boiler ...............................................12–13 3 Water piping .................................................14–23 4 Venting & combustion air

Summary of the content on the page No. 5

GOLD CGs Gas-Fired Water Boiler — Boiler Manual Please read before proceeding Installer User • This manual is for use only by your qualifi ed Read all instructions before in- heating installer/service technician. stalling. Follow all instructions in • Please refer to the User’s Information Manual for proper order to prevent personal your reference. injury or death. • We recommend regular service by a qualifi ed • Also refer to CGs Venting Supplements. service technician, at least annually. •

Summary of the content on the page No. 6

GOLD CGs Gas-Fired Water Boiler — Boiler Manual 1a Prepare boiler location — codes & checklist Installations must follow these codes: • Local, state, provincial, and national codes, laws, regulations and ordinances. • National Fuel Gas Code, ANSI Z223.1–latest edition. • Standard for Controls and Safety Devices for Automatically Fired Boilers, ANSI/ ASME CSD-1, when required. • National Electrical Code. • For Canada only: B149.1 or B149.2 Installation Code, CSA C22.1 Canadian Electri- cal Code P

Summary of the content on the page No. 7

GOLD CGs Gas-Fired Water Boiler — Boiler Manual 1b Prepare boiler location — clearances Recommended SERVICE clearances Figure 2 Required MINIMUM clearances (Fig. 1) 1. Provide clearances for cleaning and servicing the boiler and for access to controls and components. See Figure 1 for recommenda- tions. 2. Provide at least screwdriver clearance to jacket front panel screws for removal of front panel for inspection and minor service. If unable to provide at least screwdriver clearance, install

Summary of the content on the page No. 8

GOLD CGs Gas-Fired Water Boiler — Boiler Manual 1c Prepare boiler location — vent system Failure to follow all instructions can result in fl ue gas spillage and carbon monoxide emissions, causing severe personal injury or death. Inspect existing chimney before installing boiler. Failure to clean or replace perforated pipe or tile lining will cause severe personal injury or death. DO NOT COMMON VENT — Do not install the CGs into a common vent with any other appliance. This will cause fl ue ga

Summary of the content on the page No. 9

GOLD CGs Gas-Fired Water Boiler — Boiler Manual 1d Prepare boiler location — contamination Please review the following information on potential Refer to Table 1 for products and areas which may cause combustion air contamination problems. contaminated combustion air. To prevent potential of severe personal injury or death, check for products or areas listed below before installing boiler. If any of these contaminants are found: • remove contaminants permanently — OR — • isolate boiler and

Summary of the content on the page No. 10

GOLD CGs Gas-Fired Water Boiler — Boiler Manual 1e Prepare boiler location — air openings mended in Figure 3 will allow adequate ventilation and Combustion air opening location and sizing combustion air provided the boiler room is not sub- requirements depend on the clearances around jected to negative pressure due to exhaust fans or other the boiler. Check the boiler placement compared to mechanical ventilation devices. Refer to the National Figure 1, page 7. Fuel Gas Code for dealing wi

Summary of the content on the page No. 11

GOLD CGs Gas-Fired Water Boiler — Boiler Manual Figure 3 Sizing air openings for CGs installations ✷ 11 Part number 550-110-260/0508

Summary of the content on the page No. 12

GOLD CGs Gas-Fired Water Boiler — Boiler Manual 2a Prepare boiler — placement & setup Inlet air box top panel must be in Place boiler/crate near position during boiler operation. position Failure to do so could result in severe personal injury, death or 1. Leave boiler in crate and on pallet until installation substantial property damage. site is ready. 2. Move entire crate and pallet next to selected loca- Orifi ce replacement procedure tion. 3. Remove crate. (when required) 4. Remove boil

Summary of the content on the page No. 13

GOLD CGs Gas-Fired Water Boiler — Boiler Manual 2b Prepare boiler — pressure test 5. Slowly reopen boiler drain valve until test pressure Hydrostatic pressure test on the pressure/temperature gauge reaches no more Pressure test boiler before attaching water or gas piping than: (except as noted below) or electrical supply. • 45 psig for boilers with 30 psig relief valve. Prepare boiler for test • 75 psig for boilers with 50 psig relief valve. 1. Remove the shipping nipple (from CGs supply tap-

Summary of the content on the page No. 14

GOLD CGs Gas-Fired Water Boiler — Boiler Manual 3a Water piping — general information General piping information Circulator If installation is to comply with ASME or Canadian requirements, an ad- The circulator is shipped loose (wiring pre-attached to ditional high temperature limit is needed. Install control in supply piping boiler) to allow you to locate it either in the return or between boiler and isolation valve. Set second control to minimum 20°F supply piping, as desired. See page 3 f

Summary of the content on the page No. 15

GOLD CGs Gas-Fired Water Boiler — Boiler Manual 3b Water piping — single-zone system Diaphragm-type or bladder- Closed-type expansion tank type expansion tank (Figure 4) (Figure 5) 1. Ensure expansion tank size will handle boiler and 1. Ensure expansion tank size will handle boiler and system water volume and temperature. Tank must system water volume and temperature. See tank be located in boiler return piping as close to boiler manufacturer’s instructions for details. as possible, before inl

Summary of the content on the page No. 16

GOLD CGs Gas-Fired Water Boiler — Boiler Manual 3c Water piping — multiple zones Piping multiple zones Piping for radiant heating Follow instructions on pages 14 and 15 to install near- systems or converted gravity boiler or single-zone piping. (Also refer to Piping for systems radiant heating systems or converted gravity sys- tems, below, if applicable.) Converted gravity (or steam) systems See Figure 6 or Figure 7, page 17, to complete instal- Whenever possible, use the primary/secondary pi

Summary of the content on the page No. 17

GOLD CGs Gas-Fired Water Boiler — Boiler Manual 3c Water piping — multiple zones (continued) Figure 6 Zoning with circulators Figure 7 Zoning with zone valves — return water 130°F or higher. — return water 130°F or higher. 1 Boiler isolation (balancing) 10 Automatic air vent (with diaphragm-type expansion tank), or connect valves to tank fi tting (closed-type expansion tank). DO NOT use an automatic air vent when using closed-type expansion tank. It would allow air to leave the system, causing

Summary of the content on the page No. 18

GOLD CGs Gas-Fired Water Boiler — Boiler Manual 3d Piping — low temp systems the water temperature being supplied to the radiant Primary/secondary (preferred) tubing. bypass piping method Gauge 8 is required on all systems to assure the return Primary/secondary bypass piping is preferred because water temperature is accurately set for a minimum of the flow rate and temperature drop in the heating 130°F. If this gauge is not available however, adjust the circuit(s) is determined only by th

Summary of the content on the page No. 19

GOLD CGs Gas-Fired Water Boiler — Boiler Manual 3d Piping — low temp systems (continued) Figure 8 Primary/secondary piping Figure 9 Primary/secondary piping Zoning with circulators Zoning with zone valves 9 Relief valve 1 Boiler isolation (balancing) valves 10 Automatic air vent (with diaphragm-type expansion tank), or 2 Flow/check valve connect to tank fi tting (closed-type expansion tank). DO NOT use an automatic air vent when using closed-type expansion 3 System or zone circulator tank. I

Summary of the content on the page No. 20

GOLD CGs Gas-Fired Water Boiler — Boiler Manual 3d Piping — low temp systems (continued) justed using cold (or room temperature) return water BOILER-bypass piping to the boiler. (When setting the valves without gauge method 4a installed — using cold or room temperature water — assume the return water temperature to be 60°F. Set This piping method (Figures 10 and 11, page 21) is the valves so gauge 8 reads at least 120°F. called a boiler-bypass because part of the circulator Gauge 4b is opt


Alternative user manuals
# User manual Category Download
1 Weil-McLain 382-200-305 User manual Boiler 1
2 Weil-McLain 550-141-830/1202 User manual Boiler 1
3 Weil-McLain 94 User manual Boiler 0
4 Weil-McLain 550-141-829/1201 User manual Boiler 1
5 Weil-McLain 68 User manual Boiler 1
6 Weil-McLain 88 User manual Boiler 2
7 Weil-McLain 68V User manual Boiler 0
8 Weil-McLain 550-141-826/1201 User manual Boiler 0
9 Weil-McLain B-66HE User manual Boiler 0
10 Weil-McLain 88 Series User manual Boiler 0
11 Weil-McLain BCP-3 User manual Boiler 4
12 Weil-McLain BCP-8S User manual Boiler 0
13 Weil-McLain A-66E User manual Boiler 0
14 Weil-McLain AFG User manual Boiler 1
15 Weil-McLain BMC User manual Boiler 0
16 Sony HDV 1080I HVR-M15N/M15P User manual Boiler 67
17 Sony HDV 1080I HVR-M25N/M25P User manual Boiler 50
18 A.O. Smith 200 User manual Boiler 2
19 A.O. Smith 201 User manual Boiler 7
20 A.O. Smith 750 & 1000 User manual Boiler 6