Lochinvar 5 user manual

User manual for the device Lochinvar 5

Device: Lochinvar 5
Category: Boiler
Manufacturer: Lochinvar
Size: 9.18 MB
Added : 9/26/2014
Number of pages: 68
Print the manual

Download

How to use this site?

Our goal is to provide you with a quick access to the content of the user manual for Lochinvar 5. Using the online preview, you can quickly view the contents and go to the page where you will find the solution to your problem with Lochinvar 5.

For your convenience

If looking through the Lochinvar 5 user manual directly on this website is not convenient for you, there are two possible solutions:

  • Full Screen Viewing - to easily view the user manual (without downloading it to your computer), you can use full-screen viewing mode. To start viewing the user manual Lochinvar 5 on full screen, use the button Fullscreen.
  • Downloading to your computer - You can also download the user manual Lochinvar 5 to your computer and keep it in your files. However, if you do not want to take up too much of your disk space, you can always download it in the future from ManualsBase.
Lochinvar 5 User manual - Online PDF
Advertisement
« Page 1 of 68 »
Advertisement
Print version

Many people prefer to read the documents not on the screen, but in the printed version. The option to print the manual has also been provided, and you can use it by clicking the link above - Print the manual. You do not have to print the entire manual Lochinvar 5 but the selected pages only. paper.

Summaries

Below you will find previews of the content of the user manuals presented on the following pages to Lochinvar 5. If you want to quickly view the content of pages found on the following pages of the manual, you can use them.

Abstracts of contents
Summary of the content on the page No. 1

SYNC-I-O Rev N
Installation & Operation Manual
Models: 1.0 - 1.3 - 1.5
This manual must only be used by
 WARNING
a qualified heating installer / service
technician. Read all instructions,
including this manual and the SYNC
Service Manual, before installing.
Perform steps in the order given.
Failure to comply could result in
severe personal injury, death, or
substantial property damage.
Save this manual for future reference.

Summary of the content on the page No. 2

Contents HAZARD DEFINITIONS .................................................... 2 Room Air .......................................................................... 27 PLEASE READ BEFORE PROCEEDING ........................ 3 5. HYDRONIC PIPING THE SYNC -- HOW IT WORKS...................................... 4-5 System Water Piping Methods ......................................... 28 RATINGS ........................................................................... 6 Low Water Cutoff Device ...

Summary of the content on the page No. 3

Installation & Operation Manual Please read before proceeding Installer – Read all instructions, including When servicing boiler –  WARNING this manual and the SYNC Service � To avoid electric shock, disconnect electrical supply Manual, before installing. Perform steps before performing maintenance. in the order given. User – This manual is for use only � To avoid severe burns, allow boiler to cool before by a qualified heating installer/ performing maintenance. service technicia

Summary of the content on the page No. 4

Installation & Operation Manual The SYNC - How it works... 1. Access cover - front 22. Gas valves Provides access to the gas train and the heat exchanger. The gas valves sense the negative pressure created by the 2. Air intake adapter blowers, allowing gas to flow only if the gas valves are powered and combustion air is flowing. Allows for the connection of the PVC air intake pipe to the 23. Heat exchanger access covers boiler. Allows access to the combustion side of the heat 3. A

Summary of the content on the page No. 5

Installation & Operation Manual The SYNC - How it works... (continued) Models 1.0 - 1.3 - 1.5 12 34 40 3 42 2 30 17 31 13 27 28 18 19 16 21 44 1 38 35 11 Front View Rear View 4 1.0 Model Only 2 22 37 23 32 8 9 39 36 43 24 5 22 29 26 7 41 14 33 15 6 25 24 Left Side (inside unit) Right Side (inside unit) 20 5

Summary of the content on the page No. 6

Installation & Operation Manual Ratings SYNC Other Specifications AHRI Rating Net Input Vent Appliance Model Number Gross Size Air Water Outlet Inlet Gas AHRI Output MBH Size Content Water Water Connections Ratings MBH Note: Change “N” to Gallons (Note 3) (Note 4) Water, “L” for L.P. gas models. MBH (Note 1) (Note 2) Min Max 8.4 3" (2) - 2" 1½" 6" 6" SBN1000 100 1000 941 818 10.0 3" (2) - 2" 1½" 6" 6" SBN1300 130 1300 1237 1076 SBN1500 150 1500 144

Summary of the content on the page No. 7

Installation & Operation Manual 1 Determine boiler location This appliance is certified as an indoor Installation must comply with:  WARNING appliance. Do not install the appliance � Local, state, provincial, and national codes, laws, outdoors or locate where the appliance will regulations, and ordinances. be exposed to freezing temperatures or to � National Fuel Gas Code, ANSI Z223.1 – latest edition. temperatures that exceed 100°F. � Standard for Controls and Safety Devices f

Summary of the content on the page No. 8

Installation & Operation Manual 1 Determine boiler location Figure 1-1 Closet Installation - Minimum Required Clearances 1/4” (6 MM) MINIMUM CLEARANCE For closet installations, CPVC, AROUND HOT WATER PIPES  WARNING polypropylene or stainless steel 1” (25 MM) MINIMUM CLEARANCE AROUND VENT PIPES vent material MUST BE used in a closet structure due to elevated temperatures. Failure to follow this warning could result in fire, personal injury, or death. 4" (330 MM) TOP VENTILATING*

Summary of the content on the page No. 9

Installation & Operation Manual 1 Determine boiler location (continued) Provide air openings to room: Vent and air piping The SYNC requires a special vent system, designed for The SYNC alone in boiler room pressurized venting. 1. No air ventilation openings into the boiler room are The boiler is to be used for either direct vent installation or needed when clearances around the SYNC are at least for installation using indoor combustion air. When room air equal to the SERVICE cle

Summary of the content on the page No. 10

Installation & Operation Manual 1 Determine boiler location When using an existing vent system to Table 1A Corrosive Contaminants and Sources install a new boiler: Products to avoid: Failure to follow all instructions can result  WARNING in flue gas spillage and carbon monoxide Spray cans containing chloro/fluorocarbons emissions, causing severe personal injury Permanent wave solutions or death. Chlorinated waxes/cleaners Check the following venting components before installing: Ch

Summary of the content on the page No. 11

Installation & Operation Manual 1 Determine boiler location (continued) When removing a boiler from existing Remove boiler from wood pallet common vent system: 1. After removing the outer shipping carton from the boiler, Do not install the SYNC into a common remove the parts package (packaged parts inside the jacket  DANGER vent with any other appliance. This of the boiler). will cause flue gas spillage or appliance 2. To remove the boiler from the pallet: malfunction, resulting

Summary of the content on the page No. 12

Installation & Operation Manual 1 Determine boiler location Combustion and ventilation air requirements for appliances drawing air from the equipment room Provisions for combustion and ventilation air must be in accordance with Air for Combustion and Ventilation, of the latest edition of the National Fuel Gas Code, ANSI Z223.1, in Canada, the latest edition of CGA Standard B149 Installation Code for Gas Burning Appliances and Equipment, or applicable provisions of the local build

Summary of the content on the page No. 13

Installation & Operation Manual 1 Determine boiler location (continued) Where two openings are provided, one must be within 12" (30cm) of the ceiling and one must be within 12" (30cm) of the floor of the equipment room. Each opening must have net free area as specified in the chart below (Table 1B). Single openings shall commence within 12" (30cm) of the ceiling. Under no circumstances should the  CAUTION equipment room ever be under negative pressure. Particular care should b

Summary of the content on the page No. 14

Installation & Operation Manual 2 General venting Direct venting options - Sidewall Vent Figure 2-1 Two Pipe Sidewall Termination - See page 22 for more details Direct venting options - Vertical Vent Figure 2- 2 Two Pipe Vertical Termination - Figure 2-3 Vertical Vent, Sidewall Air - See See page 26 for more details page 18 for more details 14

Summary of the content on the page No. 15

Installation & Operation Manual 2 General venting (continued) Install vent and combustion air piping The SYNC boiler must be vented and The SYNC boiler vent and air piping can be installed through  DANGER supplied with combustion and ventilation the roof or through a sidewall. Follow the procedures in this air as described in this section. Ensure the manual for the method chosen. Refer to the information in vent and air piping and the combustion this manual to determine accep

Summary of the content on the page No. 16

Installation & Operation Manual 2 General venting Sizing Requirements for installation in The SYNC boiler uses model specific combustion air Canada intake and vent piping sizes as detailed in Table 2A 1. Installations must be made with a vent pipe system below. certified to ULC-S636. 2. The first three (3) feet of plastic vent pipe from the When determining equivalent combustion air and vent appliance flue outlet must be readily accessible for visual length, add 5 feet for ea

Summary of the content on the page No. 17

Installation & Operation Manual 2 General venting (continued) Materials Air inlet pipe materials: The PVC, CPVC, or ABS air inlet pipe should be cleaned and The air inlet pipe(s) must be sealed. Choose acceptable combustion air inlet pipe materials from the following list: sealed with the pipe manufacturer’s recommended solvents and standard commercial pipe cement for the material used. PVC, CPVC, Polypropylene or ABS The PVC, CPVC, ABS, Dryer Vent or Flex Duct air inlet pipe

Summary of the content on the page No. 18

Installation & Operation Manual 2 General venting Optional room air Applications utilizing the SYNC boiler may be installed with Table 2B Room Air Minimum / Maximum Allowable Air / a single pipe carrying the flue products to the outside while Vent Lengths using combustion air from the equipment room. In order to use the room air venting option the following conditions and Input Vent Vent considerations must be followed. Vent De-Rate per Model Min. Max. Diameter 25 feet of

Summary of the content on the page No. 19

Installation & Operation Manual 2 General venting (continued) PVC/CPVC 1. Work from the boiler to vent or air termination. Do not exceed the lengths given in this manual for the air or vent This product has been approved for use with the PVC/CPVC piping. vent materials listed in Table 2C. 2. Cut pipe to the required lengths and deburr the inside and outside of the pipe ends. Installing vent and air piping 3. Chamfer outside of each pipe end to ensure even The vent connection t

Summary of the content on the page No. 20

Installation & Operation Manual 2 General venting Use only the adapters and vent system listed Polypropylene  WARNING in Tables 2E and 2F. DO NOT mix vent This product has been approved for use with polypropylene systems of different types or manufacturers. vent with the manufacturers listed in Table 2D. Failure to comply could result in severe personal injury, death, or substantial All terminations must comply with listed options in this manual property damage. and be a singl


Alternative user manuals
# User manual Category Download
1 Lochinvar 000 - 260 User manual Boiler 4
2 Lochinvar 051-211 User manual Boiler 0
3 Lochinvar 1 User manual Boiler 0
4 Lochinvar 000 through 2 User manual Boiler 2
5 Lochinvar 000 BTU/HR User manual Boiler 5
6 Lochinvar 1.3 User manual Boiler 0
7 Lochinvar 0402-0752 User manual Boiler 1
8 Lochinvar 1.5 User manual Boiler 0
9 Lochinvar 2001 User manual Boiler 0
10 Lochinvar 2 User manual Boiler 0
11 Lochinvar 151 User manual Boiler 0
12 Lochinvar 1701 User manual Boiler 0
13 Lochinvar 151-286 User manual Boiler 0
14 Lochinvar 2.5 User manual Boiler 0
15 Lochinvar 45 User manual Boiler 0
16 Sony HDV 1080I HVR-M15N/M15P User manual Boiler 67
17 Sony HDV 1080I HVR-M25N/M25P User manual Boiler 50
18 A.O. Smith 200 User manual Boiler 2
19 A.O. Smith 201 User manual Boiler 7
20 A.O. Smith 750 & 1000 User manual Boiler 6