IDEAL INDUSTRIES ICOS HE24 user manual

User manual for the device IDEAL INDUSTRIES ICOS HE24

Device: IDEAL INDUSTRIES ICOS HE24
Category: Boiler
Manufacturer: IDEAL INDUSTRIES
Size: 4.18 MB
Added : 8/23/2014
Number of pages: 60
Print the manual

Download

How to use this site?

Our goal is to provide you with a quick access to the content of the user manual for IDEAL INDUSTRIES ICOS HE24. Using the online preview, you can quickly view the contents and go to the page where you will find the solution to your problem with IDEAL INDUSTRIES ICOS HE24.

For your convenience

If looking through the IDEAL INDUSTRIES ICOS HE24 user manual directly on this website is not convenient for you, there are two possible solutions:

  • Full Screen Viewing - to easily view the user manual (without downloading it to your computer), you can use full-screen viewing mode. To start viewing the user manual IDEAL INDUSTRIES ICOS HE24 on full screen, use the button Fullscreen.
  • Downloading to your computer - You can also download the user manual IDEAL INDUSTRIES ICOS HE24 to your computer and keep it in your files. However, if you do not want to take up too much of your disk space, you can always download it in the future from ManualsBase.
IDEAL INDUSTRIES ICOS HE24 User manual - Online PDF
Advertisement
« Page 1 of 60 »
Advertisement
Print version

Many people prefer to read the documents not on the screen, but in the printed version. The option to print the manual has also been provided, and you can use it by clicking the link above - Print the manual. You do not have to print the entire manual IDEAL INDUSTRIES ICOS HE24 but the selected pages only. paper.

Summaries

Below you will find previews of the content of the user manuals presented on the following pages to IDEAL INDUSTRIES ICOS HE24. If you want to quickly view the content of pages found on the following pages of the manual, you can use them.

Abstracts of contents
Summary of the content on the page No. 1

installation and
servicing
icos
(V3 Flue System)
Your Ideal installation and servicing guide
For details of document amendments, refer to page 3
HE12, HE15, HE18, HE24
For users guide see reverse of book
When replacing any part on this appliance, use only spare parts that you can be
assured conform to the safety and performance specification that we require. Do not
use reconditioned or copy parts that have not been clearly authorised by Ideal Boilers.
April 2008 UIN 203318 A04
For t

Summary of the content on the page No. 2

2 icos - Installation & Servicing

Summary of the content on the page No. 3

DOCUMENT AMENDMENTS Relevant Installation changes implemented in this book from Mod Level ......................... A03 to A04 (Apr 08) • Page 15, Frame 11 - Unpacking Change to boiler contents, wall mounting template now mounted on internal packaging. • Page 15, Frame 12 - Packaging Removal Wall mounting template now mounted on internal packaging, frame changed to reflect this. • Page 17, Frame 16 - Wall Mounting Template Wall mounting template now mounted on internal packaging, frame changed t

Summary of the content on the page No. 4

GENERAL Table 1 - Boiler Data Boiler Size HE 12, HE 15, HE 18, HE 24 1 1 Gas supply type and connection 2H-G20-20 mbar Rc /2 ( /2" BSP Female) Injector size Stereomatic 5.6mm dia. (HE 12 5.8mm dia). Flow connection 22mm copper Return connection 22mm copper Flue terminal diameter mm (in.) 100 (4) Maximum static water head m (ft.) 30.5 (100) Minimum static water head m (ft.) 0.45 (1.5) Electrical supply 230 V ~ 50 Hz Boiler power consumption 38W Fuse rating External: 3A Internal: T3.15A L250

Summary of the content on the page No. 5

GENERAL CONTENTS icos Air Supply ....................................................................... 9 Natural Gas only Benchmark Commissioning Checklist ..................... 54 Boiler Clearances ......................................................... 6 Boiler size G.C. Appliance No. PI No. Boiler Exploded Diagram ............................................ 14 Benchmark No. Electrical Connections ............................................... 27 HE12 41 397 95 87 BP 34 Electrical Supply

Summary of the content on the page No. 6

GENERAL 1 BOILER WATER CONNECTIONS The boiler flow and return pipes are supplied fitted to the boiler ready for top connection Notes. a. For the heating loads in excess of 60,000 Btu/h, 28mm (1") flow and return pipes should be used to and from the boiler. b. This appliance is NOT suitable for use with a direct hot water cylinder. 2 BOILER CLEARANCES all dimensions in mm (in.) SIDE FLUE ONLY Horizontal length of flue Top clearance The following minimum clearances must be maintained for from cent

Summary of the content on the page No. 7

GENERAL Powered Vertical Flue Kit 5 m primary and 17m secondary INTRODUCTION is a typical maximum flue length. For further details refer to The icos range of boilers are a fully automatically controlled, Powered Vertical Fluing Instructions. wall mounted, low water content, balanced flue, fanned, High Level Flue Outlet Kits condensing gas boiler. It has full modulating central heating Flue Deflector Kit outputs of : HE12 9.3 kW (32,000 Btu/h) to 12.0 kW (41,000 Btu/h). Weather Collar HE15

Summary of the content on the page No. 8

GENERAL experienced ensure this is adequate for ALL other gas SAFE HANDLING OF SUBSTANCES appliances in the property. Care should be taken when handling the boiler insulation IMPORTANT. panels, which can cause irritation to the skin. No asbestos, Installation pipes MUST be fitted in accordance with BS. 6891. mercury or CFCs are included in any part of the boiler or its In IE refer to I.S.813:2002. Pipework from the meter to the boiler manufacture. MUST be of an adequate size, i.e. no longer tha

Summary of the content on the page No. 9

GENERAL 6. The air inlet/products outlet duct and the terminal of the Single feed, indirect cylinders are not recommended and MUST boiler MUST NOT be closer than 25mm (1") to combustible NOT be used on sealed systems. material. Detailed recommendations on the protection of combustible material are given in BS.5440-1:2000. In IE The appliances are NOT suitable for gravity central heating nor refer to I.S.813:2002. are they suitable for the provision of gravity domestic hot water. IMPORTANT. The

Summary of the content on the page No. 10

GENERAL 3 OPEN VENT SYSTEM REQUIREMENTS The system should be vented directly off the boiler flow pipe, as close to the boiler as possible. The cold feed entry should be inverted and MUST be positioned between the pump and the vent, and not more than 150mm (6") away from the vent connection. Note. Combined feed and vent pipes may also be fitted. There should be a minimum height 450mm (18") of open vent above the cistern water level. If this is not possible refer to Frame 5. The vertical distance

Summary of the content on the page No. 11

GENERAL 5 LOW HEAD AND LARGE SYSTEMS WITH EXTENSIVE PIPE RUNS - OPEN VENT This arrangement is useful for large systems where radiators at the extremities are difficult to vent. This can lead to pumping over with conventional feed and vent arrangements. The following conditions MUST be observed: 1. The top of the automatic air vent must be below the cold water level. 2. The static water level (cold) must be at least 200mm above the top of the horizontal flow pipe, fitted as shown. The vent conne

Summary of the content on the page No. 12

GENERAL 7 SEALED SYSTEM REQUIREMENTS - continued 4. Expansion Vessel a. A diaphragm type expansion vessel must be pressure. The cold feed pipe from the cistern should connected to a point close to the inlet side of the include a non-return valve and a stop valve with an pump, the connecting pipe being not less than 15 mm automatic air vent connected between them, the stop (1/2" nominal) size and not incorporating valves of valve being located between the system and the any sort. automatic air ve

Summary of the content on the page No. 13

GENERAL 8 SEALED SYSTEM REQUIREMENTS - continued Safety valve setting 3.0 bar 2.5 bar 2.0 bar Vessel charge and initial 0.5 1.0 1.5 0.5 1.0 1.5 0.5 1.0 system pressure bar bar bar bar bar bar bar bar Total water content of system Expansion vessel volume litres litres 25 2.1 2.7 3.9 2.3 3.3 5.9 2.8 5.0 50 4.2 5.4 7.8 4.7 6.7 11.8 5.6 10.0 75 6.3 8.2 11.7 7.0 10.0 17.7 8.4 15.0 100 8.3 10.9 15.6 9.4 13.4 23.7 11.3 20.0 125 10.4 13.6 19.5 11.7 16.7 29.6 14.1 25.0 150 12.5 16.3 23.4 14.1 20.1 35.5 1

Summary of the content on the page No. 14

INSTALLATION 10 BOILER ASSEMBLY - Exploded view 40 94 23. Control thermistor. 24. Overheat thermostat. 25. Ignition electrode. LEGEND 26. Flame detection electrode. 15. Venturi assy. 1. Front casing panel. 8. Flue manifold. 16. Fan assy. 32. 'S' trap 2. Sealing panel 10. Interpanel. 33. Control assy. 17. Gas pipe assy. 3. Sump cover plate. 11. Burner assy. 19. Gas control valve assy. 40. Spark generator 4. Bottom casing panel. 12. Combustion chamber 20. Fan bracket assy. 44. Wall mounting plate.

Summary of the content on the page No. 15

INSTALLATION 11 UNPACKING The boiler is supplied fully assembled in one Pack A, B together with a telescopic flue assembly for lengths up to C 595mm, rear or side flue outlet, in Pack B. A Unpack and check the contents. D Pack A Contents E A The boiler B Wall mounting template on cardboard C Wall mounting plate G F D 1 year guarantee form E These Installation & Servicing/ User’s Instructions F Water Treatment Warning Label G Hardware pack nm7890 A B Hardware Pack D A 50mm x No.14 wood screws -

Summary of the content on the page No. 16

INSTALLATION 13 FRONT AND BOTTOM PANEL REMOVAL 3 1. To remove the front panel remove the 2 screws from the bottom panel. 2. Lift the panel up and off the top pegs. 1 3. To remove the bottom panel remove the 2 screws. 4. Pull the RH side of the panel down. Slide it to the right and withdraw. 14 DETERMINING THE FLUE LENGTH AND FLUE PACKS REQUIRED IMPORTANT. The boiler MUST be installed in a vertical position. Dimension X - Wall thickness. Dimension L - Wall thickness plus boiler spacing. FLUE KITS

Summary of the content on the page No. 17

INSTALLATION 15 FLUE ASSEMBLY - Exploded View An optional flue duct extension kit is required for wall thicknesses greater than : Side 395mm Rear 435mm LEGEND 1. Duct assembly. 1 2. Flue turret. 3. Turret gasket. 4. M5 x 10 pozi screw. 5. Turret clamp. nm8752 Rear flue arrangement shown 16 WALL MOUNTING TEMPLATE The wall mounting template is located on the internal top Extended centre line protective packaging. 155 Note. V - See Diagram Below The template shows the positions of the fixing holes

Summary of the content on the page No. 18

INSTALLATION 17 PREPARING THE WALL IMPORTANT. Ensure that, during the cutting operation, masonry falling outside of the building does not cause damage or personal injury. 1. Cut the flue hole (preferably with a 5" core boring tool), ensuring that the hole is square to the wall. Both wall faces immediately around the cut hole should be flat. 2. Drill 3 holes with a 7.5mm / 8mm masonry drill and insert the plastic plugs provided, for the wall mounting plate and the jacking screw plate. Note. If u

Summary of the content on the page No. 19

INSTALLATION 20 FLUE EXTENSION DUCTS - For total flue lengths greater than 595mm Pack D Flue extension duct kit contents. Flue support cutting aid Extension duct & clamp (shown folded up) 1.0m (39") long Wall plugs - 4 off Flue duct support nm8732 No. 10 x2" wood screw - 4 off 21 FLUE EXTENSION DUCTS - continued Flue length Use a maximum of 6m extended flue ONLY Extension flue General arrangement 1. A maximum of 6 extension ducts (one suitably cut) plus the standard flue duct may be used togeth

Summary of the content on the page No. 20

INSTALLATION 23 CONDENSATE DRAIN Refer also to the British Gas document: 'Guidance Notes for The condensate drain provided on the boiler must be the Installation of Domestic Gas Condensing Boilers' (1989). connected to a drainage point, preferably within the building. Ensure that the condensate trap is full of water before commissioning the boiler. Refer to Frame 27. The routing of the drain must be made to allow a minimum fall of 1 in 20 away from the boiler, throughout its length. The drainage


Alternative user manuals
# User manual Category Download
1 IDEAL INDUSTRIES 36 User manual Boiler 15
2 IDEAL INDUSTRIES CLASSIC HE18 User manual Boiler 5
3 IDEAL INDUSTRIES CLASSIC HE12 User manual Boiler 15
4 IDEAL INDUSTRIES Concord H CXSi 140 User manual Boiler 2
5 IDEAL INDUSTRIES Concord CXSi 110 User manual Boiler 1
6 IDEAL INDUSTRIES CLASSIC HE15 User manual Boiler 10
7 IDEAL INDUSTRIES Concord H CXSi 160 User manual Boiler 4
8 IDEAL INDUSTRIES CLASSIC HE9 User manual Boiler 1
9 IDEAL INDUSTRIES F140 User manual Boiler 0
10 IDEAL INDUSTRIES Concord H CXSi 120 User manual Boiler 2
11 IDEAL INDUSTRIES Concord H CXSi 180/H User manual Boiler 0
12 IDEAL INDUSTRIES F220 User manual Boiler 0
13 IDEAL INDUSTRIES Concord H-180/H User manual Boiler 1
14 IDEAL INDUSTRIES F180 User manual Boiler 1
15 IDEAL INDUSTRIES F310 User manual Boiler 0
16 Sony HDV 1080I HVR-M15N/M15P User manual Boiler 67
17 Sony HDV 1080I HVR-M25N/M25P User manual Boiler 50
18 A.O. Smith 200 User manual Boiler 2
19 A.O. Smith 201 User manual Boiler 7
20 A.O. Smith 750 & 1000 User manual Boiler 6