Summary of the content on the page No. 1
ATTACHMENT
OPERATOR’S
MANUAL
2-BIN BAGGER
42” 2-Bin Bagger
Mfg. No. Description
1695287 42” 2-Bin Bagger
1734239
Rev. 00
Rev. Date 01/2007
TP 100-4451-00-AT-SN
Summary of the content on the page No. 2
THIS PAGE INTENTIONALLY BLANK
Summary of the content on the page No. 3
Table of Contents Safety Rules & Information General Warnings............................................2 Safety Decals ..................................................2 General Operating Instructions Before Operation .............................................3 Mowing with the Catcher .................................3 After Operation ................................................3 Storing the Grass Catcher...............................3 Initial Installation Counterweight Installation .
Summary of the content on the page No. 4
Safety Rules & Information Read these safety rules and follow them closely. Failure to obey these rules could result in loss of control of unit, severe personal injury or death to you, or bystanders, or damage to property or equipment. The triangle in text signifies important cautions or warnings which must be followed. GENERAL WARNINGS � Know the unit’s controls and how to stop quickly. bag that meets manufacturer’s durability standards. READ THE OPERATOR’S MANUALS. � If the mower stall
Summary of the content on the page No. 5
General Operating Instructions Before Operation Clear the lawn of all sticks, stones, wire and other debris which may be caught or thrown by the mower blades. Check grass condition. If wet, wait until later in the day. If grass is wet, the grass catcher is likely to become plugged. For efficient bagging, air circulation under the mower deck, through the chute and into the bag is very important. For this reason, BEFORE YOU BEGIN MOWING you should make certain the underside of the mower and the u
Summary of the content on the page No. 6
Initial Installation NOTE: In this manual, “left” and “right” are always defined from the standpoint of the operator position facing forward from seat. WARNING To avoid serious injury, engage parking brake, disengage PTO, stop engine, remove key and disconnect spark plug(s) before attempting to install, remove or work on the mower. C COUNTERWEIGHT INSTALLATION A 1. Slide pins (A, Figure 1) on counterweight (B) into F slots (C) on front footrest support bracket (D). D 2. Secure counterweight (B)
Summary of the content on the page No. 7
Hitch Installation B B A A D F C E H G J I Left View Back View Figure 2. Install Hitch Assembly A. Frame F. Nut, Nylock, Flanged 3/8-16 B. Hitch Assembly G. Nut, Nylock, Flanged 5/16-16 C. Debris Guard H. Nut, 1/2-13 D. Capscrew, Debris Guard, 3/8-16 I. Nut, 3/8-16 E. Capscrew, Seat Deck Support, 5/16-18 J. Rear Transmission Support HITCH INSTALLATION Hitch Installation 1. Remove 5/16-16 nut (G, Figure 2) from seat deck support capscrew (E). 2. Remove 3/8-16 nut (F) from rear debris guard capsc
Summary of the content on the page No. 8
Bag Support and Cover Installation B E C F D G E A C A D Figure 3. Install Bag and Cover Support B A. Upright Support B. Bag and Cover Support E C D C. Support Mount D. Mount Pin Figure 4. Cover Installation E. Retainer Spring A. Cover Assembly F. Shoulder Rest B. Bag Support Bracket G. Shoulder Bolt C. Cover Hinge Pivots D. Hinge Pins Bag Support Installation E. Retainer Springs 1. Attach the bag and cover support (B, Figure 3) to the upright support (A) by sliding the support mount (C) INSTA
Summary of the content on the page No. 9
Bag Installation and Tube Assembly A 42” Mowers A B C C B D 42” Mowers Figure 6. Middle and Upper Tube Assembly A. Upper Tube Figure 5. Install Collector Bags B. Middle Tube A. Cover C. Screw, 1/4 x 3/4 B. Collector Bags CONNECTING UPPER AND MIDDLE TUBE C. Grass Bag Hanger D. Bag Hanger Post 1. Slide the upper tube (A, Figure 6) over middle tube (B) and secure together using screw (C). INSTALL COLLECTOR BAGS In upper tube: 1. Raise the cover (A, Figure 5). - Third hole from end is for 42” mow
Summary of the content on the page No. 10
Chute and Tube Installation A D B B C H B A E F C G D E E Figure 7. Install Chute Figure 8. Connecting Tube Assembly to Lower A. Chute Chute and Cover B. Discharge Deflector A. Upper Tube C. Knob B. Cover D. Bolt, Carriage, 5/16 x 3/4 C. Ridge, Upper Tube E. Nut, Push, 5/16 D. Ridge Cutout F. Nut, Wing E. Lower Chute F. Strap, Rubber Chute Installation G. Pin H. Tube Assembly 1. Install 5/16 x 3/4” carriage bolts (D, Figure 7) with 5/16 push nuts (E) to mower deck as shown. CONNECTING TUBE ASS
Summary of the content on the page No. 11
THIS PAGE INTENTIONALLY BLANK 9
Summary of the content on the page No. 12
Normal Installation & Removal J A. Hitch Support Assembly I B. Bag and Cover Support Assembly K C. Shoulder Bolt D. Mount Pin L E. Retainer Spring F. Hinge Pin G. Retainer Spring H. Cover Hinge Pivots M I. Cover J. Bag N K. Bag Hanger G L. Ridge Cutout H M. Upper Tube N. Ridge B O. Tube Assembly F P. Rubber Strap P Q. Pin F E G O R. Chute S. Knob X Q T. Carriage Bolt D U. Wing Nut C V. Discharge Deflector V C R W. Carriage Bolt U X. Support Mount S A W T Figure 9. Normal Installation & Removal
Summary of the content on the page No. 13
Normal Removal WARNING OPERATION WITHOUT BAGGER For operation without bagger, the mower discharge deflector MUST be properly installed in the down position and retained by the spring latch. Removal 1. Unhook rubber strap (P, Figure 9) from pin (Q), then remove tube assembly (O) from chute (R) and from cover (I). 2. Lift cover (I) and remove bags (J) from bag and cover support assembly (B). Note: Support the cover during the next step. 3. Remove cover (I) by disconnecting retainer springs (G), t
Summary of the content on the page No. 14
MANUFACTURING, INC. Simplicity Mfg. Inc. - Snapper Products Simplicity Mfg. Inc. 500 N Spring 535 Macon Street Street / PO Box 997 McDonough, GA 30253 Port Washington, WI 53074-0997 www.Snapper.com www.SimplicityMfg.com Briggs & Stratton Yard Power Products Group Copyright © 2007 Briggs & Stratton Corporation Milwaukee, WI USA. All Rights Reserved