Summary of the content on the page No. 1
Lighting Systems IS_ML
RETAIN THESE INSTRUCTIONS FOR MAINTENANCE REFERENCE.
MMA & MFA MMD & MFD
MMC & MFC MME & MFE
MMB & MFB
We reserve the right to change details of design, materials and finish.
Summary of the content on the page No. 2
Lighting Systems IS_ML TABLE OF CONTENTS STEM MOUNT INSTALLATION ..............................................................................................................3 CABLE MOUNT INSTALLATION ............................................................................................................. .............................................................................................. 7 .........................................................................
Summary of the content on the page No. 3
Lighting Systems IS_ML STEM MOUNT INSTALLATION Step 1. Install MOUNTING BRACKET to J-BOX [4” (10.16cm) Octagon By Others] A. provided with . B. C. Step 2. Mark and Drill Hole A. B. on the first Step 3. Secure MOUNTING BRACKET A. B. Attach to and slip IMPORTANT! Opening of all MOUNTING BRACKETS must be aligned in same direction. Step 4. STEM Shortening A. Step 5. Remove SAFETY CLIP A. Remove from opening and slide STEM B. . 30” (76.20cm) f
Summary of the content on the page No. 4
Lighting Systems IS_ML STEM MOUNT INSTALLATION (CONT’D) Step 6. Replace SAFETY CLIP A. Replace to B. C. Step 7. Secure CANOPY Snap onto J-BOX (BY OTHERS) MOUNTING BALL ALIGNER BRACKET 3/4” (1.91CM) Ø HOLE TOGGLE WING NUT STEM BALL ALIGNER (BY OTHERS) TOGGLE WING BOLT CANOPY (BY OTHERS) STEM Figure 2 J-BOX (BY OTHERS) MOUNTING BRACKET SAFETY CLIP 8-32 SCREW (BY OTHERS) CANOPY STEM Figure 3 We reserve the right to change details of design, materials an
Summary of the content on the page No. 5
Lighting Systems IS_ML CABLE MOUNT INSTALLATION Step 1. Install CROSSBAR to J-BOX [4” (10.16cm) Octagon By Others] A. B. Step 2. Mark and Drill Hole A. B. 30” (76.20cm) for 4-foot Individual Fixture 60” (152.40cm) for 8-foot Individual Fixture 9’ (274.32cm) Max. for Continuous Runs 8-32 SCREW (BY OTHERS) J-BOX (BY OTHERS) CROSSBAR Figure 4 We reserve the right to change details of design, materials and finish.
Summary of the content on the page No. 6
Lighting Systems IS_ML CABLE MOUNT INSTALLATION (CONT’D) Step 3. Secure CROSSBAR A. B. Step 4. Wiring A. B. Step 5. Secure CANOPY X J-BOX (BY OTHERS) 3/4” (1.91CM) Ø HOLE (2X) CROSSBAR COLLAR TOGGLE WING NUT CANOPY (BY OTHERS) SET SCREW CROSSBAR POWER CORD TOGGLE BOLT CABLE COLLAR (BY OTHERS) CANOPY SCREW CABLE CHANNEL MOUNTING CHANNEL BRACKET ASSEMBLY Figure 5 We reserve the right to change details of design, materials and finish.
Summary of the content on the page No. 7
Lighting Systems IS_ML CHANNEL MOUNTING STEM & WIRING Step 1. SUPPLY WIRES STEM SUPPLY WIRES BRASS FITTING CHANNEL CHANNEL MOUNTING BRACKET ASSEMBLY DETAIL “A” Step 2. CHANNEL MOUNTING BRACKET ASSEMBLY STEM BRASS FITTING CHANNEL SCREW SCREW SUPPLY WIRES CHANNEL MOUNTING BRACKET ASSEMBLY DETAIL “B” BROWN CONNECTORS Figure 6 We reserve the right to change details of design, materials and finish.
Summary of the content on the page No. 8
Lighting Systems IS_ML CHANNEL MOUNTING STEM & WIRING (CONT’D) Step 3. BROWN CONNECTOR Step 4. Repeat Steps Above as Necessary Step 5. Secure STEM THRU WIRE SUPPLY WIRE BROWN CONNECTOR (BY OTHERS) THRU WIRE LEADS (BALLAST OR TRACK) Figure 7 We reserve the right to change details of design, materials and finish.
Summary of the content on the page No. 9
Lighting Systems IS_ML CHANNEL MOUNTING CABLE & WIRING Step 1. Slide Through POWER CORD Step 2. Channel Mounting Bracket Assembly A. B. Step 3. BROWN CONNECTOR A. B. Step 4. Connect Wires A. Finish connection with BROWN CONNECTOR flap and do the same for all three wires according to color. B. Step 5. Secure CHANNEL MOUNTING BRACKET ASSEMBLY Step 6. Secure Cable POWER CORD CABLE BRASS FITTING CABLE GRIPPER CHANNEL SCREW SCREW POWER CHANNEL M
Summary of the content on the page No. 10
Lighting Systems IS_ML CHANNEL CONNECTIONS & WIRING Step 1. Step 2. SCREW #1 SCREW #3 SCREW #2 FEMALE SPLINE CHANNEL ALUMINUM EXTRUSION MALE SPLINE Figure 9 Step 3. Step 4. Step 5. THRU WIRES SCREW #1 SCREW #3 SCREW #2 HAIRLINE JOINT Figure 10 We reserve the right to change details of design, materials and finish.
Summary of the content on the page No. 11
Lighting Systems IS_ML CHANNEL CONNECTIONS & WIRING (CONT’D) Step 6. THRU WIRES QUICK CONNECTOR HAIRLINE JOINT Figure 11 We reserve the right to change details of design, materials and finish.
Summary of the content on the page No. 12
Lighting Systems IS_ML MODULE WIRE & MOUNTING Step 1. Step 2. Step 3. Step 4. PARTS BAG BROWN CONNECTORS WIRE-WAY COVER THUMB SCREW SUPPLY WIRES CHANNEL BROWN CONNECTORS LOCKING CLIP END CAP SNAP-IN COVER HOOK BRACKETS MODULE (LIGHTING FIXTURE) SANP-IN COVER QUICK CONNECTORRS Figure 12 We reserve the right to change details of design, materials and finish.
Summary of the content on the page No. 13
Lighting Systems IS_ML MODULE WIRE & MOUNTING (CONT’D) Step 5. Step 6. Step 7. THUMB SCREWS. Step 8. Step 9. Step 10. We reserve the right to change details of design, materials and finish.
Summary of the content on the page No. 14
Lighting Systems IS_ML MULTI-LYTE TRACK MOUNTING Step 1. Step 2. Step 3. Unscrew COVER from LIVE END. Step 4. Step 5. Step 6. Replace COVER to LIVE END. Step 7. LIVE END WHITE LEAD GROUND LEAD GREEN GROUND PARTS BAG SCREW BROWN CONNECTORS BLACK LEAD (HOT) SCREW TERMINALS STRIP 7/16” (1.11CM) NOT NECESSARY TO WRAP 18GA. SUPPLY LEADS BLACK AND WHITE LEADS AROUND SCREWS Figure 13 We reserve the right to change details of design
Summary of the content on the page No. 15
Lighting Systems IS_ML MULTI-LYTE TRACK MOUNTING (CONT’D) Step 8. Step 9. Step 10. Step 11. Step 12. WAIRE-WAY COVER BROWN CONNECTORS END CAP SNAP-IN COVER TRACK ADAPTER LIVE END CHANNEL TRACK DEAD END COVER PLASTIC WASHER 8-32 X3/4” FLAT HEAD SCREW Figure 14 We reserve the right to change details of design, materials and finish.
Summary of the content on the page No. 16
Lighting Systems IS_ML X, L, T-JOINER MOUNTING Step 1. CABLE SET STEM SET CABLE GRIPPER CHANNEL MOUNTING BRACKET ASSEMBLY Figure 15 Step 2. CABLE SET BRASS FITTING BRASS FITTING Figure 16 STEM SET BRASS FITTING BRASS FITTING Figure 17 We reserve the right to change details of design, materials and finish.
Summary of the content on the page No. 17
Lighting Systems IS_ML X, L, T-JOINER MOUNTING (CONT’D) Step 3. ATTENTION: Maximum distance between suspension points is 9ft (274.32cm). Maximum load on each 10-foot section is 80lbs (36.29kg). Note: Each 4-foot module weighs a maximum of 20 pounds (9.07kg) . Each 8-foot module weighs a maximum of 40 pounds (18.14kg). We reserve the right to change details of design, materials and finish.
Summary of the content on the page No. 18
Lighting Systems IS_ML PATTERNS 5ft CHANNEL STEM OR CABLE MOUNTING L-JOINER T-JOINER 10ft CHANNEL 5’ 6” (167.64cm) X-JOINER 5’ 6” (167.64cm) XX 5’ 6” (167.64cm) 10’-6” (320.04cm) Note: Maximum distance between mounting locations is 9’ (274.32cm) Figure 18 We reserve the right to change details of design, materials and finish.