Wayne-Dalton Corp.9800 Series user manual

User manual for the device Wayne-Dalton Corp.9800 Series

Device: Wayne-Dalton Corp.9800 Series
Category: Garage Door Opener
Manufacturer: Wayne-Dalton
Size: 9.65 MB
Added : 5/10/2014
Number of pages: 40
Print the manual

Download

How to use this site?

Our goal is to provide you with a quick access to the content of the user manual for Wayne-Dalton Corp.9800 Series. Using the online preview, you can quickly view the contents and go to the page where you will find the solution to your problem with Wayne-Dalton Corp.9800 Series.

For your convenience

If looking through the Wayne-Dalton Corp.9800 Series user manual directly on this website is not convenient for you, there are two possible solutions:

  • Full Screen Viewing - to easily view the user manual (without downloading it to your computer), you can use full-screen viewing mode. To start viewing the user manual Wayne-Dalton Corp.9800 Series on full screen, use the button Fullscreen.
  • Downloading to your computer - You can also download the user manual Wayne-Dalton Corp.9800 Series to your computer and keep it in your files. However, if you do not want to take up too much of your disk space, you can always download it in the future from ManualsBase.
Wayne-Dalton Corp.9800 Series User manual - Online PDF
Advertisement
« Page 1 of 40 »
Advertisement
Print version

Many people prefer to read the documents not on the screen, but in the printed version. The option to print the manual has also been provided, and you can use it by clicking the link above - Print the manual. You do not have to print the entire manual Wayne-Dalton Corp.9800 Series but the selected pages only. paper.

Summaries

Below you will find previews of the content of the user manuals presented on the following pages to Wayne-Dalton Corp.9800 Series. If you want to quickly view the content of pages found on the following pages of the manual, you can use them.

Abstracts of contents
Summary of the content on the page No. 1

9800 Series (4 Section)
®
TorqueMaster - Single and Double Spring(s)
Installation Instructions and Owner’s Manual
IMPORTANT NOTICE!
Read these instructions carefully before attempting
installation. If in question about any of the proce-
Wayne-Dalton, a Division of
Overhead Door Corporation dures, do not perform the work. Instead, have a
P.O. Box 67, Mt. Hope, OH 44660
qualified door agency do the installation or repairs.
www.Wayne-Dalton.com
©Copyright 2010 Wayne-Dalton, a Division of Overhe

Summary of the content on the page No. 2

WARNING TO AVOID POSSIBLE Table of Contents Important safety Instructions .................................................. 2 INJURY, READ ThESE INSTRUCTIONS Package Contents ................................................................... 3 CAREfULLY BEfORE ATTEMPTING Door section Identification ...................................................... 4 Tools Required ........................................................................

Summary of the content on the page No. 3

NOTE: DEPENDING ON THE DOOR MODEl, sOME P aRTs lIsTED WIll NOT BE suPPlIED IF NOT Package Contents NECEssaR y. REaR suPPORTs May OR May NOT BE INCluDED WITH yOuR DOOR. DOOR sECTIONs (as REquIRED) (1) OPERaTOR BRaCkET ® (1)TORquEMasTER sPRING TuBE (2) HORIzONTal TRaCk RH/lH (2) quICk INsT all RH/lH (2) Fully aDjusT aBlE RH/lH FlaGaNGlE (as REquIRED) FlaGaNGlE (as REquIRED) DOOR sTOP & NaIls WEaTHER sEal & NaIls (2) HORIzONTal aNGlE (IF INCluDED) RIGHT aND lEFT CaBlE ® (IF INCluDED) (80” OR 9

Summary of the content on the page No. 4

Door Section Identification Tools Needed: NOTE: This provides an alternative method for identifying your door sections/stacking position. TOP sECTION Hinges are always pre-attached at #3 the top of each section (except top section) and the hinges are stamped for identification, #1, #2, #3, and #4 (#4 WaRNING laBEl only on five section doors). see view (May BE ON RIGHT OR lEFT HaND sIDE) below. The stamp identifies the stacking sequence of the section. The sequence is always determined b

Summary of the content on the page No. 5

Tools Required POWER DRIll RaTCHET WRENCH PlIERs/WIRE CuTTERs TaPE MEasuRE 1/8”, 3/16” DRIll BITs PHIllIPs HEaD sCREWDRIVER Fla T TIP sCREWDRIVER PENCIl NEEDlE NOsE PlIERs GlOVEs 7/16”, 1/2”, 9/16” 3/8”, 7/16”, 1/2”, 9/16” 7/16” sOCkET DRIVER saFETy GlassEs sOCkETs WRENCHEs sTEP laDDER HaMMER sa W HORsEs (P aIR) VICE GRIPs VICE ClaMPs Removing An Old Door WARNING IF yOuR COuNTERBalaNCE sysTEM Is OTHER THaN THOsE MENTIONED IN sECTIONs P1, P2 aND P3, DO NOT aTTEMPT TO WORk ON IT, BuT HaVE a qua

Summary of the content on the page No. 6

Torsion Spring Removal P1 for Standard Lift Tools Needed: WARNING TORsION sPRING assEMBly approved FaIluRE TO usE aPPROVED Winding Bars WINDING BaRs CaN CausE sPRING ENERGy TO BE RElEasED suDDENly, REsul TING IN sEVERE 3/8” Wrench OR FaTal INjuR y. WARNING Vice Clamp COuNTERBalaNCE sPRING TENsION MusT BE RElIEVED Recommended BEFORE REMOVING aNy WINDING CONE tools from HaRDWaRE. a POWERFul sPRING page 5 RElEasING IT’s ENERGy suDDENly CaN CausE sEVERE OR F aTal INjuR y. Do not release

Summary of the content on the page No. 7

lOOsEN lOCk COuNTER ® TorqueMaster Spring Removal NuT GEaR/ COVER P2 ® a TorqueMaster spring system can be Tools Needed: identified by the end brackets. For single spring applications, the right hand end RIGHT HaND bracket will always have a drive gear, Recommended END BRaCkET counter gear, counter cover, and a winding tools from bolt head. The left hand end bracket will page 5 have no gears, counter cover, or winding bolt head. The hole for the winding bolt head will be plugged. Fo

Summary of the content on the page No. 8

® TorqueMaster Spring Removal continued... If the counterbalance cable is still taut and Tools Needed: ® the TorqueMaster spring Tube is difficult to rotate, that is an indication that spring Recommended tension still exists on the left hand spring. tools from Repeat steps 1 and 2 for releasing spring page 5 tension on the left hand side. Step 4: using a flat tip screwdriver, pry REMOVE TOP the counter gear and counter cover laG sCREW from the right hand end bracket (Fig. 4 on previou

Summary of the content on the page No. 9

REMOVE laG sCREW FROM saFETy CaBlE (IF Extension Spring Removal INsTallED). REPEa T FOR P3 OPPOsITE sIDE. Step 1: Raise the door to the fully open Tools Needed: position and place vice clamps to the back Recommended legs of both vertical tracks, below the tools from bottom rollers to prevent the door from page 5 falling. By opening the door you release most of the spring tension. Carefully BOTTOM sECTION unfasten the s-hook from the horizontal (DOOR OPEN) angle. Remove cable, sheave and

Summary of the content on the page No. 10

suITaBlE MOuNTING suRFaCE 2” x 6” HEaDER BOaRD Preparing the Opening luMBER MINIMuM 2” x 6” luMBER P5 PREFERRED If you just removed your existing door or you are installing a Tools Needed: new door, complete all steps in PREPaRING THE OPENING. Recommended To ensure secure mounting of track brackets, side DOOR HEIGHT tools from and center brackets, or steel angles to new or retro-fit lEVEl HEaDER page 5 construction, it is recommended to follow the procedures outlined in DasMa Technica

Summary of the content on the page No. 11

Installation IMPORTANT: REaD INsTR uCTIONs TITlED “P4” “REMOVING THE OlD DOOR” ON P aGE 9 aND “P5” “PREPaRING THE OPENING” ON PaGE 10 BEFORE aTTEMPTING DOOR INsTalla TION. IMPORTANT: sTaINlEss sTEEl OR PT 2000 COa TED laG sCREWs MusT BE usED WHEN INsTallING CENTER BEaRING BRaCkETs, END BRaCkETs, jaMB BRaCkETs, OPERa TOR MOuNTING/suPPORT BRaCkETs aND DIsCONNECT BRaCkETs ON TREaTED luMBER (PREsERVaTIVE-TREaTED). sTaINlEss sTEEl laG sCREWs aRE NOT NECEssaR y WHEN INsTallING PRODuCTs ON uN-TREa T

Summary of the content on the page No. 12

Fully aDjusT aBlE FlaGaNGlE Attaching fully Adjustable flagangle to Vertical Track 2 Tools Needed: NOTE: If quick install flagangle was installed in step 1, skip this step and None continue with step 3. If not, complete 1/4”- 20 this step. FlaNGE HEx NuTs Hand tighten the flagangle to the vertical track using (2) 1/4” - 20 x 9/16” large head ribbed track bolts (or stud plate if sTuD Pla TE included) and (2) 1/4” - 20 flange hex (IF INCluDED) nuts. Repeat for other side. secure the fla

Summary of the content on the page No. 13

Fully aDjusT aBlE jaMB BRaCkETs Installing fully Adjustable Jamb Brackets 4 NOTE: If you have quick install jamb Tools Needed: brackets, skip this step and complete step 5. None The bottom jamb bracket is always the shortest bracket included with your sT-0 sT-1 door. If three jamb brackets are included with you door, the second bracket up HOlE/slOT is the middle bracket in height. The jaMB PaTTERN top jamb bracket is the tallest bracket BRaCkET included. 1/4”-20 x To attach the bott

Summary of the content on the page No. 14

Installing q.I. Jamb Brackets 5 Tools Needed: NOTE: If you have fully adjustable jamb brackets, skip this step and complete None step 6. Measure the length of the vertical tracks. using the jamb bracket schedule, l EFT sIDE sHOWN RIGHT sIDE sHOWN determine the placement of the jamb TWIsTlOCk TaB brackets for your door height and track 3RD sET HOlEs type. To install the jamb brackets, align the twistlock tab on the quick install jamb bracket with the quick install TOP feature in the t

Summary of the content on the page No. 15

Bottom Section 7 DOOR OPENING Tools Needed: Before installing the bottom section, the weather seal (may not be included) level must be installed (see PREPaRING THE OPENING on page 10) Center the bottom section in the door opening. level section using wooden shims (if necessary) under the bottom section. WEaTHER sEal lEVEl BOTTOM sECTION WOODEN sHIMs (IF NECEssaR y) VERITCal TRaCk CaBlE Vertical Track BOTTOM sECTION FlaGaNGlE DRuM 8 Tools Needed: IMPORTANT: THE TOPs OF THE 5/16” x 1-5/8”

Summary of the content on the page No. 16

Stacking Sections 9 Tools Needed: NOTE: For door section identification see page 4. lOCk sECTION Power Drill 7/16” socket NOTE: Make sure hinge leafs are flipped Driver down, when stacking another section on top. Place rollers in hinge tubes of the second section (lock section). With assistance, lift second section and guide rollers into the vertical tracks. align vertical marks in the upper alignment sticker, with the lower alignment sticker on right hand side on the back of door. k

Summary of the content on the page No. 17

Top Brackets 10 2ND sET OF HOlEs FROM BOTTOM To install the l-shaped top brackets, align Tools Needed: the bottom holes in the top bracket base Power Drill with the second set of holes from the 7/16” socket endcap. Driver Fasten using (4) 1/4” - 14 x 5/8” self tapping screws. secure the top bracket slide to the bracket base loosely using (2) 1/4” - 20 x 5/8” carriage bolts and (2) 1/4” - 20 flanged hex nuts. The bracket will be tightened and adjusted in step 15. Insert rollers into top

Summary of the content on the page No. 18

u-BaR Operator Bracket 11 Tools Needed: NOTE: If installing a trolley type operator, complete this step. If not, skip Power Drill sIDE VIEW OF u-BaR this step and continue with step 12. 7/16” socket Driver IMPORTANT: WHEN INsTallING a 1/4”-20 x 7/8” sElF TROllEy TyPE OPERaTOR ON 9800 DRIllING sCREWs DOOR, a WayNE-Dal TON TROllEy BRaCkET MusT BE sECuREly aTTaCHED TO THE TOP sECTION. IT Is THEN uNNECEssaR y TO FuRTHER REINFORCE THE TOP sECTION OF THE MODEl 9800 WayNE-Dal TON DOOR,

Summary of the content on the page No. 19

Top Section 12 Place the top section in the opening Tools Needed: DOOR WIDTH and vertically align with lower sections. +3-3/8” TO 3-1/2” Hammer align vertical marks in the upper alignment sticker, with the lower alignment sticker on right hand side on the back of door. Temporarily secure the top section by driving a nail in the header near the center of the door and bending it over the top section. Now, flip up hinge leafs, hold them tight against section and fasten center hinges firs

Summary of the content on the page No. 20

Attaching horizontal Track to FlaGaNGlE HORIzONTal quick Install flagangle TRaCk 13 Tools Needed: NOTE: If you have fully adjustable flagangle, skip this step and complete kEy slOT 9/16” socket step 14. Ratchet Wrench quICk 9/16” Wrench To install horizontal track, place the INsTall curved end over the top roller. align TaB level key slot of the horizontal track with the quick install tab of the flagangle. Push VERTICal curved portion of horizontal track down TRaCk to lock in place


Alternative user manuals
# User manual Category Download
1 Wayne-Dalton 8024 User manual Garage Door Opener 14
2 Wayne-Dalton ALUMINUM FULL VIEW 452 User manual Garage Door Opener 6
3 Wayne-Dalton ALUMINUM FULL VIEW 451 User manual Garage Door Opener 1
4 Wayne-Dalton 3014 User manual Garage Door Opener 65
5 Wayne-Dalton 5500/9700 User manual Garage Door Opener 19
6 Wayne-Dalton 8124 User manual Garage Door Opener 4
7 Wayne-Dalton 342295 User manual Garage Door Opener 4
8 Wayne-Dalton IDRIVE 302582 User manual Garage Door Opener 12
9 Wayne-Dalton 341785 User manual Garage Door Opener 4
10 Wayne-Dalton IDRIVE PRO 3790 User manual Garage Door Opener 45
11 Wayne-Dalton PRODRIVE 3220C User manual Garage Door Opener 98
12 Wayne-Dalton IDRIVE PRO 3790-Z User manual Garage Door Opener 23
13 Wayne-Dalton IDRIVE 3982 User manual Garage Door Opener 4
14 Wayne-Dalton PRODRIVE 3220C-Z User manual Garage Door Opener 13
15 Wayne-Dalton PRODRIVE 3222C-Z User manual Garage Door Opener 46
16 Sony Remote Commander RM-V111T User manual Garage Door Opener 50
17 Sony RM-B750 User manual Garage Door Opener 22
18 Sony RCP 920 User manual Garage Door Opener 5
19 Aspire Digital ASPIRE RF RFKGT User manual Garage Door Opener 0
20 Aiphone IS-SS-HID-I User manual Garage Door Opener 0