Wayne-Dalton 341785 user manual

User manual for the device Wayne-Dalton 341785

Device: Wayne-Dalton 341785
Category: Garage Door Opener
Manufacturer: Wayne-Dalton
Size: 9.27 MB
Added : 8/6/2013
Number of pages: 34
Print the manual

Download

How to use this site?

Our goal is to provide you with a quick access to the content of the user manual for Wayne-Dalton 341785. Using the online preview, you can quickly view the contents and go to the page where you will find the solution to your problem with Wayne-Dalton 341785.

For your convenience

If looking through the Wayne-Dalton 341785 user manual directly on this website is not convenient for you, there are two possible solutions:

  • Full Screen Viewing - to easily view the user manual (without downloading it to your computer), you can use full-screen viewing mode. To start viewing the user manual Wayne-Dalton 341785 on full screen, use the button Fullscreen.
  • Downloading to your computer - You can also download the user manual Wayne-Dalton 341785 to your computer and keep it in your files. However, if you do not want to take up too much of your disk space, you can always download it in the future from ManualsBase.
Wayne-Dalton 341785 User manual - Online PDF
Advertisement
« Page 1 of 34 »
Advertisement
Print version

Many people prefer to read the documents not on the screen, but in the printed version. The option to print the manual has also been provided, and you can use it by clicking the link above - Print the manual. You do not have to print the entire manual Wayne-Dalton 341785 but the selected pages only. paper.

Summaries

Below you will find previews of the content of the user manuals presented on the following pages to Wayne-Dalton 341785. If you want to quickly view the content of pages found on the following pages of the manual, you can use them.

Abstracts of contents
Summary of the content on the page No. 1

9800 Series - 4 Section
Low Head Room Front Mount
Torsion Spring
Installation Instructions and Owner’s Manual
IMPORTANT NOTICE!
Wayne-Dalton Corp.
Read these instructions carefully before
P.O. Box 67 attempting installation. If in question about
any of the procedures, do not perform the
Mt. Hope, OH 44660
work. Instead, have a qualified door agency
www.wayne-dalton.com
do the installation or repairs.
Copyright 2009 Wayne-Dalton Corp. Part No. 341785 REV1 08-03-2009

Summary of the content on the page No. 2

WARNING Table of Contents TO AVOID POSSIBLE Important safety Instructions .................................................. 2 INJURY, READ ThESE INSTRUCTIONS Package Contents ................................................................... 3 CAREfULLY BEfORE ATTEMPTING Door section Identification ...................................................... 4 Tools Required ........................................................................

Summary of the content on the page No. 3

NOTE: DEPENDING ON ThE DOOR MODEl, sOME P aRTs lIsTED WIll NOT bE suPPlIED IF NOT NECEssaR y. REaR Package Contents suPPORTs May OR May NOT bE INCluDED WITh yOuR DOOR. DOOR sECTIONs (as REquIRED) (1) TORsION TubE (2) hORIzONTal TRaCk Rh/lh (2) Fully aDjusT ablE Rh/lh (2) quICk INsT all Rh/lh FlaGaNGlE (as REquIRED) FlaGaNGlE (as REquIRED) RIGhT & lEFT DR uMs TORsION sPRINGs (2) bOTTOM bRaCkETs (1) OPERaTOR bRaCkET (2) TOP bRaCkET (as REquIRED) (2) VERTICal q.I. jaMb bRaCkETs Fully aDjusT abl

Summary of the content on the page No. 4

Door Section Identification Tools Needed: NOTE: This provides an alternative method for identifying your door sections/stacking position. TOP sECTION hinges are always pre-attached at the top #3 of each section (except top section) and the hinges are stamped for identification, WaRNING labEl #1, #2, #3, and #4 (#4 only on five (MaybE ON RIGhT section doors). see view below. The OR lEFT haND sIDE) stamp identifies the stacking sequence of the section. The sequence is always determined

Summary of the content on the page No. 5

Tools Required PENCIl POWER DRIll RaTChET WRENCh TaPE MEasuRE 1/8”, 3/16” DRIll bITs lEVEl aPPROVED WINDING baRs PhIllIPs hEaD sCREWDRIVER Fla T TIP sCREWDRIVER GlOVEs 1/4” TORx bIT 7/16”, 1/2”, 3/8”, 9/16” 7/16”, 1/2”, 9/16” 7/16” sOCkET DRIVER saFETy GlassEs sOCkETs WRENChEs sTEP laDDER haMMER sa W hORsEs (P aIR) VICE GRIPs VICE ClaMPs Removing An Old Door WARNING IF yOuR COuNTERbalaNCE sysTEM Is OThER ThaN ThOsE MENTIONED IN sECTIONs P1, P2 aND P3, DO NOT aTTEMPT TO WORk ON IT, buT ha VE

Summary of the content on the page No. 6

Torsion Spring Removal P1 for Standard Lift Tools Needed: WARNING TORsION sPRING assEMbly FaIluRE TO usE aPPROVED approved WINDING baRs CaN CausE sPRING Winding bars ENERGy TO bE RElEasED suDDENly, REsul TING IN sEVERE 3/8” Wrench OR FaTal INjuR y. (2) Vice Clamps WARNING Recommended COuNTERbalaNCE sPRING tools from TENsION MusT bE RElIEVED page 5 bEFORE REMOVING aNy WINDING CONE haRDWaRE. a POWERFul sPRING RElEasING IT’s ENERGy suDDENly CaN CausE sEVERE OR F aTal INjuR y. Do not rele

Summary of the content on the page No. 7

lOOsEN lOCk COuNTER ® TorqueMaster Spring Removal NuT GEaR/ COVER P2 ® a TorqueMaster spring system can be Tools Needed: identified by the end brackets. For single spring applications, the right hand end RIGhT haND bracket will always have a drive gear, Recommended END bRaCkET counter gear, counter cover, and a winding tools from bolt head. The left hand end bracket will page 5 have no gears, counter cover, or winding bolt head. The hole for the winding bolt head will be plugged. Fo

Summary of the content on the page No. 8

® TorqueMaster Spring Removal continued... (spring Tube should be free to rotate in Tools Needed: either direction.) If the counterbalance ® cable is still taut and the TorqueMaster Recommended spring Tube is difficult to rotate, that is an tools from indication that spring tension still exists page 5 on the left hand spring. Repeat steps 1 and 2 for releasing spring tension on the left hand side. REMOVE TOP laG sCREW Step 4: using a flat tip screwdriver, pry the counter gear and cou

Summary of the content on the page No. 9

REMOVE laG sCREW FROM saFETy CablE (IF Extension Spring Removal INsTallED). REPEa T FOR P3 OPPOsITE sIDE. Step 1: Raise the door to the fully open Tools Needed: position and place vice clamps to the back Recommended legs of both vertical tracks, below the tools from bottom rollers to prevent the door from page 5 falling. by opening the door you release most of the spring tension. Carefully bOTTOM sECTION unfasten the s-hook from the horizontal (DOOR OPEN) angle. Remove cable, sheave and

Summary of the content on the page No. 10

suITablE MOuNTING suRFaCE 2” x 6” hEaDER bOaRD Preparing the Opening luMbER MINIMuM 2” x 6” luMbER P5 PREFERRED FaIluRE TO sECuREly Tools Needed: WARNING aTTaCh a suIT ablE Recommended MOuNTING PaD TO sTR uCTuRally sOuND FRaMING DOOR hEIGhT COulD CausE sPRINGs TO VIOlENTly Pull MOuNTING tools from PaD FROM Wall, REsul TING IN sEVERE OR FaTal INjuR y. lEVEl hEaDER page 5 If you just removed your existing door or you are installing a new door, complete all steps in PREPaRING ThE PluMb j

Summary of the content on the page No. 11

Installation IMPORTANT: REaD INsTR uCTIONs TITlED “P4” “REMOVING ThE OlD DOOR” ON P aGE 9 aND “P5” “PREPaRING ThE OPENING” ON PaGE 10 bEFORE aTTEMPTING DOOR INsTalla TION. IMPORTANT: sTaINlEss sTEEl OR PT 2000 COa TED laG sCREWs MusT bE usED WhEN INsTallING CENTER bEaRING bRaCkETs, END bRaCkETs, jaMb bRaCkETs, OPERa TOR MOuNTING/suPPORT bRaCkETs aND DIsCONNECT bRaCkETs ON TREaTED luMbER (PREsERVaTIVE-TREaTED). sTaINlEss sTEEl laG sCREWs aRE NOT NECEssaR y WhEN INsTallING PRODuCTs ON uN-TREa

Summary of the content on the page No. 12

Fully aDjusT ablE FlaGaNGlE Attaching fully Adjustable flagangle to Vertical Track 2 Tools Needed: NOTE: If quick install flagangle was installed in step 1, skip this step and None continue with step 3. If not, complete 1/4”- 20 this step. FlaNGE hEx NuTs hand tighten the flagangle to the vertical track using (2) 1/4” - 20 x 9/16” large head ribbed track bolts (or stud plate if sTuD Pla TE included) and (2) 1/4” - 20 flange hex (IF INCluDED) nuts. Repeat for other side. secure the fla

Summary of the content on the page No. 13

Fully aDjusT ablE jaMb bRaCkETs Installing fully Adjustable Jamb Brackets 4 Tools Needed: NOTE: If quick install flagangles were installed in step 3, skip this step and None continue with step 5. If not, complete sT-0 sT-1 this step. The bottom jamb bracket is always the hOlE/slOT shortest bracket included with your jaMb PaTTERN bRaCkET door. If three jamb brackets are included with the door, the middle bracket on the (1) 1/4”-20 x 9/16” TRaCk bOl T track is the middle bracket in heig

Summary of the content on the page No. 14

bOTTOM (4) 1/4”-20 x 11/16” sElF Bottom Bracket sECTION DRIllING sCREWs 5 ClEVIs PIN IMPORTANT: Right and left hand is Tools Needed: always determined from inside the TEaRDROP OF Power Drill COuNTERbalaNCE garage looking out. CablE 7/16” socket NOTE: For door section identification see Driver page 4. locate the left hand bottom bracket. bOTTOM align the bracket horizontally with the bOTTOM bRaCkET top edge of the pre-installed bottom bRaCkET bracket. also align the bracket vertical

Summary of the content on the page No. 15

Bottom Section 6 DOOR OPENING Tools Needed: before installing the bottom section, the weather seal (may not be included) level must be installed (see PREPaRING ThE OPENING on page 10) Center the bottom section in the door opening. level section using wooden shims (if necessary) under the bottom astragal. WEaThER sEal lEVEl bOTTOM sECTION WOODEN shIMs (IF NECEssaR y) VERITCal TRaCk bOTTOM sECTION Vertical Track FlaGaNGlE 7 Tools Needed: IMPORTANT: ThE TOPs OF ThE 5/16” x 1-5/8” VERTICal

Summary of the content on the page No. 16

Stacking Sections 8 NOTE: For door section identification see Tools Needed: page 4. lOCk sECTION Power Drill 7/16” socket NOTE: Make sure hinge leafs are flipped Driver down, when stacking another section on top. Place rollers in hinge tubes of the second section (lock section). With assistance, lift second section and guide rollers into the vertical tracks. align vertical marks in the upper alignment sticker, with the lower alignment sticker on right hand side on the back of door. k

Summary of the content on the page No. 17

u-baR Operator Bracket 9 NOTE: If installing a trolley type Tools Needed: operator, complete this step. If not, skip Power Drill sIDE VIEW OF u-baR this step and continue with step 10. 7/16” socket Driver IMPORTANT: WhEN INsTallING a 1/4”-20 x 7/8” sElF TROllEy TyPE OPERaTOR ON 9800 DRIllING sCREWs DOOR, a WayNE-Dal TON TROllEy bRaCkET MusT bE sECuREly aTTaChED TO ThE TOP sECTION. IT Is ThEN uNNECEssaR y TO FuRThER REINFORCE ThE TOP sECTION OF ThE MODEl 9800 WayNE-Dal TON DOOR, W

Summary of the content on the page No. 18

Top Section DOOR WIDTh 10 +3-3/8” TO 3-1/2” Tools Needed: Place the top section in the opening and vertically align with lower sections. hammer align vertical marks in the upper 7/16” socket alignment sticker, with the lower alignment sticker on right hand side on 7/16” Wrench the back of door. Ratchet Wrench Temporarily secure the top section by driving a nail in the header near the 7/16” socket center of the door and bending it over Driver the top section. Power Drill Now flip up hin

Summary of the content on the page No. 19

Attaching horizontal Track to FlaGaNGlE hORIzONTal TRaCk quick Install flagangle 11 Tools Needed: NOTE: If you have fully adjustable flagangle, skip this step and complete kEy slOT 7/16” socket step 12. Ratchet Wrench quICk To install horizontal track, align key slot INsTall of the horizontal track with the quick Tab 7/16” Wrench install tab of the flagangle. Push curved portion of horizontal track down to lock level VERTICal in place. TRaCk level horizontal track and bolt the top cur

Summary of the content on the page No. 20

Attaching horizontal Track to Adjustable flagangle 12 Tools Needed: FlaGaNGlE NOTE: If quick install flagangle was installed in step 11, skip this step and 7/16” socket continue with step 13. If not, complete this step. Ratchet Wrench sTuD Pla TE To install horizontal track, place the 7/16” Wrench curved end over the top roller. align the bottom of the horizontal track with level the vertical track. hand tighten the horizontal track to the flagangle with Flat Tip (1) stud plate and (


Alternative user manuals
# User manual Category Download
1 Wayne-Dalton 8024 User manual Garage Door Opener 14
2 Wayne-Dalton ALUMINUM FULL VIEW 452 User manual Garage Door Opener 6
3 Wayne-Dalton ALUMINUM FULL VIEW 451 User manual Garage Door Opener 1
4 Wayne-Dalton 3014 User manual Garage Door Opener 65
5 Wayne-Dalton 5500/9700 User manual Garage Door Opener 19
6 Wayne-Dalton 8124 User manual Garage Door Opener 4
7 Wayne-Dalton 342295 User manual Garage Door Opener 4
8 Wayne-Dalton IDRIVE 302582 User manual Garage Door Opener 12
9 Wayne-Dalton IDRIVE PRO 3790 User manual Garage Door Opener 45
10 Wayne-Dalton PRODRIVE 3220C User manual Garage Door Opener 98
11 Wayne-Dalton IDRIVE PRO 3790-Z User manual Garage Door Opener 23
12 Wayne-Dalton IDRIVE 3982 User manual Garage Door Opener 4
13 Wayne-Dalton PRODRIVE 3220C-Z User manual Garage Door Opener 13
14 Wayne-Dalton PRODRIVE 3222C-Z User manual Garage Door Opener 46
15 Wayne-Dalton PRODRIVE 3224C-Z User manual Garage Door Opener 343
16 Sony Remote Commander RM-V111T User manual Garage Door Opener 50
17 Sony RM-B750 User manual Garage Door Opener 22
18 Sony RCP 920 User manual Garage Door Opener 5
19 Aspire Digital ASPIRE RF RFKGT User manual Garage Door Opener 0
20 Aiphone IS-SS-HID-I User manual Garage Door Opener 0