SC-6DS,SC-10DS and SC-16DS
DIRECT STEAM CONVECTION STEAMER
INSTALLATION – OPERATION – MAINTENANCE
BLODGETT OVEN COMPANY
www.blodgett.com
44 Lakeside Avenue, Burlington, Vermont 05401 USA Telephone (800) 331-5842, (802) 860-3700 Fax: (802) 864-0183
1
S00048 Rev B (12/04)
ページ2に含まれる内容の要旨
IMPORTANT NOTES FOR INSTALLATION AND OPERATION It is recommended that this manual be read thoroughly and that all instructions be followed carefully. This is the safety alert symbol. It is used to alert you to potential personal injury hazards. Obey all safety messages that follow this symbol to avoid possible injury or death. WARNING: Improper installation, operation, adjustment, alteration, service or maintenance can cause property damage, injury or death. Read the installation, operating
ページ3に含まれる内容の要旨
TABLE OF CONTENTS DESCRIPTION PAGE Important Notes 2 1.0 Service Connections 4 2.0 Installation Instructions 5 3.0 Operating Instructions 8 4.0 Periodic Maintenance 9 5.0 Troubleshooting 9 3
ページ4に含まれる内容の要旨
1.0 SERVICE CONNECTIONS ELECTRICAL CONNECTION: 1/2" conduit connection to controls. 120VAC-60Hz-1PH 2 AMPS per compartment or to be as specified on data plate. DRAIN: 2"IPS piped to open floor drain. No Solid Connection. COLD WATER: 3/8" O.D. tubing at 25-50 PSI(170-345 kPa). S STEAM SUPPLY: 3/4" IPS for in coming steam at 60 lbs./hr. @ 10 psi. (27 kg/hr @ 69 kPa) min.* 24 [610] DIMENSIONS ARE IN INCHES [MM] 15.25 [387] 2 [51] 2.75 [70] 0 [0] 3.5 [89] 2.5 [64] 0 [0] 10 [254] 1.5 [38] S 9.5 [2
ページ5に含まれる内容の要旨
2.0 INSTALLATION INSTRUCTIONS Ideally an exhaust system should be located directly above the appliance to exhaust steam and heat generated by the appliance. 1. Set the unit in place and level using a spirit level. 2. Ascertain that a floor drain (open gap) is convenient to the appliance drain. 3. Mark hole locations on floor through anchoring holes provided in flanged adjustable feet. 4. Remove appliance and drill holes in locations marked on floor and insert proper anchoring devices. 5. Set un
ページ6に含まれる内容の要旨
INFORMATION TO STEAM FITTER 1. Each cooking compartment requires approximately 1 BHP (34.5 lbs of steam per hour) to operate satisfactorily. 2. Assuming availability of 30 psi supply steam pressure immediately to the appliance, then pipe sizes of ½" or 3/4" or 1" will deliver respectively 90, 165 or 385 lbs. of steam per hour to the appliance Heat Exchanger. From the foregoing to use ½" pipe line would most likely prove inadequate. An extremely important consideration is the pressure drop that w
ページ7に含まれる内容の要旨
Total of above = 20 + 2.2 + 3 + 2.2 + 17 + 23 + 10 + 2.2 = 79.6 feet. Since each 10 feet is equivalent to 1 psi pressure loss, 79.6 feet is equivalent to approximately 32 psi from an original Boiler supply of 40 psi. It is suggested that, wherever possible, the steam supply line to the appliance is a separate line from the steam source. If the appliance must be supplied from a line supplying other appliances, the pipe sizes and pressure will have to be verified. Further, during idle periods, whe
ページ8に含まれる内容の要旨
3.0 OPERATING INSTRUCTIONS CAUTION: Live steam and accumulated hot water in the compartment may be released when the door is opened START-UP Start-up procedures for the steamer must be completed once daily prior to operation. 1. Turn on the water and steam supply to the appliance. 2. Open the cabinet door and turn the power switch to ON. A pilot light comes on indicating the appliance is ready to begin operation. With the READY pilot on, preheat each steamer compartment for one minute when the
ページ9に含まれる内容の要旨
4.0 PERIODIC MAINTENANCE Never spray water into electric controls. CLEANING 1. Keep exposed cleanable areas of unit clean at all times. 2. Thoroughly wash oven cavities, door liners, and pan racks at the end of each day or as required with a mild detergent and water to prevent bacterial growth and odors. 3. Remove drain screens from inside compartment drains. Using a plastic bottle brush and mild detergent, clean inside the drain opening ensuring there is no food residue or blockage. Clean th