ページ1に含まれる内容の要旨
more than 10cm
more than 10cm
more than 10cm
more than 15cm
Installation Manual of Room Air Conditioner
Read this manual before installation
Explain sufficiently the operating means to the user
according to this manual.
Necessary Tools for Installation
1.Driver 5.Torque wrench(17mm,22mm,26mm) 9.Nipper 12.Reamer
2.Hacksaw 6.Pipe cutter 10.Gas leakage detector or
3.Hole core drill 7.Flaring tool soap-and-water solution
4.Spanner(17,19 and 26mm) 8.Knife 11.Measuring tape
Drawing for the install
ページ2に含まれる内容の要旨
500 113.5 140 140 113.5 583 140 415 140 Floor fixing dimensions Floor fixing dimensions Floor fixing dimensions of the outdoor unit of the outdoor unit of the outdoor unit (Unit:mm) (Unit:mm) (Unit:mm) HSU-24LEK13 HSU-18LEK03/(DB) HSU-09LEK03/(DB) HSU-09LEK13 HSU-09LEK03 HSU-12LEK03/(DB) HSU-12LEK13 HSU-12LEK03 HSU-18LEK13 HSU-07LEK03 HSU-09HEK03 HSU-108CH09 HSU-07HEK03 HSU-12HEK03 HSU-138CH09 HSU-12LEK13-M HSU-18HEK03 HSU-24HEK03 Selection of pipe For 07 09 108 For 12 18 138 For 24 To this
ページ3に含まれる内容の要旨
1(L) 2(N) L N 1(N) 2(L) 3(C) Indoor unit Connecting the indoor/outdoor Electric Cable Removing the wiring cover Remove terminal cover at right bottom corner of indoor unit, then take off wiring cover by removing its screws. When connecting the cable after installing the indoor unit 1. Insert from outside the room cable into left side of the wall hole, in which the pipe has already existed. 2. Pull out the cable on the front side, and connect the cable making a loop. When connecting the cable
ページ4に含まれる内容の要旨
Outdoor unit Outdoor unit 1.Connection of pipes To bend a pipe, give the roundness as large as possible not to crush the pipe Connecting the pipe of gas side first makes working easier. The max vertical distance between the indoor unit and the outdoor unit is 5 m. Forced fastening without careful centering Half union Flare nut may damage the threads and cause a leakage of gas. Pipe Diameter ( ) Fastening torque Spanner Liquid side 6.35mm(1/4") 18N.m Liquid side 9.52mm(3/8") 40N.m Torque