ページ1に含まれる内容の要旨
392
INSTALLATION & OPERATING MANUAL
BUNN-O-MATIC CORPORATION
POST OFFICE BOX 3227
SPRINGFIELD, ILLINOIS 62708-3227
PHONE: (217) 529-6601 FAX: (217) 529-6644
40305.0000A 07/07 ©2006 Bunn-O-Matic Corporation www.bunn.com
ページ2に含まれる内容の要旨
INTRODUCTION This equipment will brew a half-gallon batch of coffee into an awaiting dispenser. It is only for indoor use on a sturdy counter or shelf. WARRANTY Bunn-O-Matic Corp. (“Bunn”) warrants the equipment manufactured by it to be commercially free from de- fects in material and workmanship existing at the time of manufacture and appearing within one year from the date of installation. In addition: 1.) Bunn warrants electronic circuit and/or control boards to be commercially free from
ページ3に含まれる内容の要旨
USER NOTICES (cont.) ! WARNING Fill water tank before turning - on - thermostat or connecting appliance to power source. Use only on a properly protected circuit capable of the rated load. Electrically ground the chassis. Follow national/local electrical codes. Do not use near combustibles. FAILURE TO COMPLY RISKS EQUIPMENT DAMAGE, FIRE, OR SHOCK HAZARD READ THE ENTIRE OPERATING MANUAL BEFORE BUYING OR USING THIS PRODUCT 39940.0000A 7/07 ©2007 BUNN-O-MATIC CORPORATION # 39933.0000 # 39940.0
ページ4に含まれる内容の要旨
ELECTRICAL REQUIREMENTS CAUTION - The brewer must be disconnected from the power source until specifi ed in Initial Set-Up. All models have an attached cordset and plug. US models require 2-wire grounded service rated 120 volts ac, 15 amp, single phase, 60 Hz. "A" models require 2-wire, grounded service rated 220-240 volts ac, 10 amp, single phase, 50/60 Hz. "B" models require 2-wire, rated 100 volts ac, 15.0 amp, single phase, 50/60 Hz. Electrical Hook-Up CAUTION – Improper electrical install
ページ5に含まれる内容の要旨
COFFEE BREWING ® 1. Insert a BUNN fi lter into the funnel. 2. Pour the fresh coffee into the fi lter and level the bed of grounds by gently shaking. 3. Slide the funnel into the funnel rails. 4. Place an empty decanter beneath the funnel. 5. Pour one pitcher of tap water into the screened area on top of the brewer. 6. When brewing is completed, simply discard the grounds and fi lter. POUR IN WATER ONLY! CLEANING 1. The use of a damp cloth rinsed in any mild, non-abrasive, liquid detergent is recomm
ページ6に含まれる内容の要旨
TROUBLESHOOTING A troubleshooting guide is provided to suggest probable causes and remedies for the most likely problems encountered. If the problem remains after exhausting the troubleshooting steps, contact the Bunn-O-Matic Technical Service Department. Testing, and repair of electrical equipment should be performed only by qualifi ed service personnel. All electronic components have 120 volt AC or low voltage DC potential on their terminals. Shorting of ter- minals or the application o
ページ7に含まれる内容の要旨
Page 7 Wiring Harness, Ground # 37403.0000 Wiring Harness, Warmer # 37402.0000 Wiring Harness, Main # 37401.0000 WIRING DIAGRAM
ページ8に含まれる内容の要旨
18 11 16 15 14 10 17 13 7 12 6 1 5 8 19 9 21 20 22 2 4 23 24 3 25 Page 8
ページ9に含まれる内容の要旨
1 37355.0000 1 Funnel Assembly w/Decals 2 39766.0000 1 Pitcher 3 01188.0000 1 Deliming Spring 4 35286.0000 1 Thermostat 5 39772.0000 1 Sprayhead, 6 Hole 6 39775.0000 1 Nut, Hex .438"-20 7 37381.0000 1 Switch, DPST 8 37304.0000 1 Power Cord, 120V 37304.0001 1 Power Cord, 230V CE 37304.0002 1 Power Cord, 230V UK 37304.0003 1 Power Cord, 100V 9 37322.0000 4 Foot, M6 x 1.0 Thread 10 37353.0000 1 Facade, Control Panel 11 37394.0000 2 Warmer Assembly 220V 37394.0001 2 Warmer Assembl