ページ1に含まれる内容の要旨
AUTOMATIC GAS
COFFEE URN
OPERATION MANUAL
MODEL:
FE-100G
SPECIFICATIONS
INSTALLATION
MAINTENANCE TIPS
REPAIR PARTS LIST
WIRING DIAGRAMS
GAS SPECIFICATIONS
MODEL NO. NATURAL GAS PROPANE GAS
BTU/HR @ 3.5” W.C. BTU/HR @ 10” W.C.
FE-100G 32,000 32,000
FOR YOUR SAFETY
DO NOT STORE OR USE GASOLINE OR OTHER FLAMMABLE VAPORS A
ページ2に含まれる内容の要旨
SAFETY PRECAUTIONS FOR YOUR SAFETY, THE FOLLOWING SAFETY PRECAUTIONS SHOULD BE FOLLOWED AND ENFORCED. IF YOU SMELL GAS: • OPEN WINDOWS • DON’T TOUCH ELECTRICAL SWITCHES • EXTINGUISH OPEN FLAMES • IMMEDIATELY CALL YOUR GAS SUPPLIER 1. Instructions must be posted in a prominent location and all safety precautions taken in the event the user smells gas. Obtain this information from your local gas supplier. 2. LIGHTING: Follow the instruction
ページ3に含まれる内容の要旨
FE-100G AUTOMATIC COFFEE URN FE-100G AUTOMATIC COFFEE URN Dimensions Body Overall Overall Overall (inch) Depth Depth Height Width 16.0 19.5 31.0 37.0 Water ¼” Copper tubing connection Construction Type 304 18-8 Stainless Steel Shipping Wt. 125 lb. INSTALLATION AND OPERATING INSTRUCTION: PRE-INSTALLATION INSTRUCTIONS: The
ページ4に含まれる内容の要旨
AIR SUPPLY AND VENTILATION: Adequate ventilation and air supply must be provided in order for the coffee urn to operate properly and efficiently. The area in front of and above the unit must be clear to avoid any obstruction of flow of combustion and ventilation air. DO NOT under any circumstances, connect the coffee urn flue directly to a building exhaust system or place the flue outlet directly into the plenum of the exhaust hood as it will adversely affect the gas combustion of the coff
ページ5に含まれる内容の要旨
FE-100G AUTOMATIC GAS COFFE URN PARTS LIST FOR FE-100G GAS SYSTEM NO DESCRIPTION 1 SIDE BOX DOOR RZ46A 2 SIDE BOX RZ45A 3 WASHER 2" P528A 4 HEX BUSHING 3/4 X 3/8 NPT K636A 5 SPACER 1/4" K641A 6 GAS VALVE R/S 7000MVRLC L621A 7 3/8 NPT 4" NIPPLE, BLACK J015A 8 1/4 COMP FITTING K039A 9 1/4 ALUM PILOT TUBE H350A 10 3/8 X 3/8 NPT L COMP FITTING K635A 11 3/8 ALUM GAS VALVE TUBE H349A 12 THERMOSTAT RX-2051-12 L622A 1
ページ6に含まれる内容の要旨
RELIGHTING: Shut off all gas and wait approximately 3 minutes before relighting the pilot. SHUTTING DOWN: For temporary shut down, turn the thermostat to lowest or OFF position; then turn gas cock dial to PILOT position. To shut boiler down completely, partially depress and turn gas cock dial to OFF position. CORRECT PROCEDURES FOR BREWING COFFEE AS RECOMMENDED BY THE COFFEE BREWING CENTER • Use fresh or drip grind coffee, spread evenly, as an even coffee bed is important for pr
ページ7に含まれる内容の要旨
adjustment slot and turn it counter-clockwise to increase or clockwise to decrease by-pass flow. At the completion of the brewing cycle, measure the volume of the water in the coffee liner. The timer may have to be readjusted to obtain the correct volume of water. The proper setting of the by-pass will have to be determined by the user. THERMOSTAT: To adjust the temperature of the water in the urn, turn the thermostat knob to “10”and remove the knob without moving the thermostat shaft
ページ8に含まれる内容の要旨
• REPLACING SOLENOID VALVE. 1. Shut off water supply and remove fuse () from front panel. 2. Disconnect wires from terminals on solenoid coil. 3. Remove flare nut from solenoid valve and unscrew valve solenoid from bracket. 4. Install new unit. • REPLACING FLOAT SWITCH. 1. Remove fuse () from front panel. 2. Remove screws from timer panel and remove timer exposing terminal board and electrical wiring. 3. Disconnect wires from terminals () and () on terminal board and release f
ページ9に含まれる内容の要旨
3. Open the control box and disconnect the two pump wires from the quick disconnect terminals. 4. Loosen union fittings on pump and remove pump from urn. 5. Replace pump and follow priming instruction. NOTE: Pump and motor assembly is factory lubricated for the life of the pump. • TIMER SOLID-STATE Depress BREW button, hold for approximately 10 seconds, and then release. If water flows from spray head when button is depressed and stops flowing after button is released, then timer i
ページ10に含まれる内容の要旨
PARTS LIST ME-10/15G NO DESCRIPTION ME-10G ME-15G 1 KNOB M027A M027A 2 COVER Q102H Q102H 3 BODY R477A R478A 4 GAUGE SHIELD MTG BRACKET U160A U160A 5 VENT CAP ASSEMBLY X046A X046A 6 GAUGE SHIELD WASHER KIT X012A X012A 7 WATER GAUGE GLASS X043A X073A 8 WATER GAUGE SHIELD D031A D066A 9 DIAL THERMOMETER L007A L007A 10 CHROME PLATED NUT 3/8" NPT K110A K110A 11 OVERFLOW TUBE H081A H080A 12 HANDLE X007A X007A 13 BONNET X010A X010A 14 FAUCET SPRING SS X019A X019A 15 STEM X058A
ページ11に含まれる内容の要旨
51 SILICONE GASKET M256A M256A 52 STEM VALVE M0251 M0251 53 ADAPTER 1/4-20 M0589 M0589 54 FLOAT, SS 3" M0892 M0892 LP CONVERSION KIT L347P L347P 55 WATER GAUGE ASSEMBLY D020A 56 FAUCET ASSEMBLY D017A D017A 11